Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

MOBIL PRODUCING NIGERIA UNLIMITED

An ExxonMobil Subsidiary
Operator of the NNPC LTD/MPN Joint Venture

Tender Opportunity:
Provision of Vehicle Maintenance Services for MPN locations;
Lagos, Abuja, Porthacourt/Onne, QIT, Eket and BRT
NipeX Number: MPN.00000230
As part of their submissions, Tenderers shall:
1. INTRODUCTION i. Demonstrate that the entity is a Nigerian indigenous company, provide
details of its Ownership Structure. Submit certified true copies of CAC
Mobil Producing Nigeria Unlimited (MPN), Operator of NNPC Ltd/ MPN Joint form (C02 and C07) including Memorandum and Article of Association
Venture, plans to engage the services of competent contractors, for the with minimum of 51% Nigerian shareholding stipulated for a Nigerian
Provision of Vehicle Maintenance Services for MPN Locations Lagos, Abuja, Company, including evidence of being registered on the NCDMB NOGIC
Port Harcourt/Onne, QIT, Eket and BRT in Nigeria to support her operations JQS.
within the NNPC Ltd/ MPN Joint Venture (JV) acreage (Lagos, Abuja, Port
ii. Description of in-country committed infrastructure (equipment,
Harcourt/ Onne, Qua Iboe Terminal/ Eket and Bonny River Terminal) for an
technical office and administrative space, and workshop in Nigeria to
anticipated contract term of Four (4) years plus one (1) year optional
support this contract.
extension
iii. Provide evidence of what percentage of your key management positions
2. SCOPE OF WORK is held by Nigerians and what percentage of the total work force are
Nigerians. Also, show overall percentage of work to be performed in
The scope of work to be provided shall include but not limited to the Nigeria and those by Nigerian resources relative to total work volume
following provisions: iv. State proposed total scope of work to be conducted by Nigerian personnel
(whether contracted directly or under subcontract agreements) with
I. Maintenance of Company fleet and associated services which includes but names and addresses.
is not limited to recovery of vehicles from breakdown locations to v. Tenderer shall comply with the latest approved version of NCDMB HCD
support company operations at all its locations (Lagos, Abuja, Port guideline by committing to providing Project-Specific training, man-hour,
Harcourt/Onne, QIT/ Eket and BRT). budget, skill development and understudy plan for Nigerian personnel
utilizing OGTAN registered trainer(s) or other approved NCDMB training
3. MANDATORY REQUIREMENT institution(s).
vi. Bidders shall provide evidence of category 1,2,3,4 or 5 Construction &
i. To be eligible for this tender exercise, interested contractors are Moveable (EC) equipment group NCEC to demonstrate capacity to
required to be prequalified in the 2.05.04 - Automobile Accessories - execute the work scope.
Tires / Batteries / Car Accessories /Spare parts and 3.05.20 (Vehicle vii. All contractors will be required to provide memorandum of agreement
Maintenance and Repair Services). Product Category in NipeX Joint (MOA) with OEM accredited automobile assembly plants or vehicle
Qualification Scheme (NJQS) database; ensure this is done by the Advert manufacturer’s in-country for the procurement of spare parts and
close date. All successfully prequalified suppliers in this category will components including after sales maintenance support for this service.
receive Invitation to Technical Tender (ITT). Bidders’ failure to comply with the NOGICD Act or demonstrate commitment
to Nigerian Content development will result in Bidder’s disqualification.
ii. To determine if you are prequalified and view the product/service
category you are listed for: Open www.vendors.nipex-ng.com and access 5. CLOSING DATE
NJQS with your log-in details, click on continue Joint Qualification
Scheme tool, click check my supplier status and then click supplier Only tenderers who are registered with the relevant product/service code
product group. as at 16:00hrs on Friday, January 6, 2023 being the advert close date shall
iii. If you are not listed in a product/service category you are registered be invited to submit Technical Bids
with DPR to do business, contact NipeX office at 8/10 Bayo Kuku Road,
Ikoyi Lagos with your DPR certificate as evidence for necessary update. 6. ADDITIONAL INFORMATION
iv. To initiate the NJQS prequalification process, access www.nipex-ng.com 1. Interested Suppliers must be prequalified for this product/ service
to download an application form, make necessary payments and contact category in NJQS.
NipeX office for further action. 2. Full tendering procedure will be provided only to Contractors that have
v. To be eligible, all tenders must comply with the Nigerian Content been successfully prequalified in NJQS.
requirements in the NipeX system 3. This advertisement shall neither be construed as an Invitation to Tender
(ITT) nor a commitment on the part of MPN to award a contract to any
4. NIGERIAN CONTENT Supplier and/or associated companies, Sub-contractors or Agents.
4. This advertisement shall not entitle prequalified companies to make any
Mobil Producing Nigeria Unlimited (MPN) is committed to the development claims whatsoever, and/or seek any indemnity from MPN and/or its
of the Nigerian Oil and Gas business in compliance with the Nigerian Oil and partners by virtue of such companies having been prequalified in NJQS.
Gas Industry Content Development Act 2010 (NOGICD Act) enacted by the 5. NNPC Ltd/MPN reserves the right to reject any and or all prequalified
Federal Government of Nigeria in April 2010. suppliers at its sole discretion and at no costs whatsoever.
As from the commencement of this Act, the minimum Nigerian Content in any 6. All costs incurred in registering and prequalifying for this and other
product/ service categories in NJQS shall be borne solely by Suppliers.
project, service or product specification to be executed in the Nigerian Oil
and Gas Industry shall be consistent with the level set in the Schedule to the 7. Suppliers that are prequalified for this product/ service category in NJQS
must ensure that the name and contact details (physical address, email
Act and any other targets as may be directed by the Nigerian Content
address and telephone number) of their company and authorized/
Development and Monitoring Board (NCDMB). responsible personnel is up-to-date in their company profile in the NJQS
NNPC/ MPN JV requires their Contractors to comply with the Act, its attached database.
Schedule and any applicable regulation developed by the NCDMB. 8. MPN shall communicate only with the authorized/ responsible personnel
Nigerian Content (NC) in the Nigerian oil and gas industry is defined as: of prequalified companies and not through unauthorized individuals or
Agents.
“The quantum of composite value added to or created in the Nigerian
.
economy by a systematic development of capacity and capabilities through
the deliberate utilization of Nigerian human, material resources and services NCDMB CERTIFICATION NUMBER:
in the Nigerian oil and gas industry.” ES/NCDMB/MPN/ADV/UPD/020822/PROVISION OF VEHICLE
"Nigerian company" is a company registered in Nigeria in accordance with MAINTENANCE SERVICES FOR MPN LOCATIONS LAGOS; ABUJA, PORT
HARCOURT/ONNE, QIT, EKET AND BRT
the provisions of Companies and Allied Matters Act with not less than 51%
equity shares by Nigerians.
Bidders shall consider Nigerian content as an important element of their
overall project development and management philosophy for project Please visit the NipeX Portal at www.nipex-ng.com for this Advert and other
execution. information
Tenderer shall demonstrate valid registration with or provide MOA with
Nigerian entity having Nigerian Automotive council manufactures
association and Ministry of commerce

Mobil House, 1 Lekki Epe Expressway, Victoria Island, P.M.B. 12054, Lagos Nigeria

You might also like