Flexiable Pavement Design ESAL 5 & CBR 10 As Requested by Mark Abraham - 12 January 2023
Flexiable Pavement Design ESAL 5 & CBR 10 As Requested by Mark Abraham - 12 January 2023
DESIGN DATA :
1. Terrain Type = -
cl.3.5 GDOR 2. Design period, x = 15 years x= 15 years
cl. 3.5 ATJ5/85 3. Subgrade CBR value = 10 % CBR = 10 %
4. Initial Average Daily Traffic (both ways), ADT = 153 veh/day (vpd) ADT= 153 vpd
5. Percentage of selected heavy goods vehicles, Pc = 30 % Pc = 30 %
Table 2.06-2SPDRR 6. The rate of annual traffic growth, r = 4 % r= 4%
7. Total Carriageway width, Lc = 6 m Lc = 6m
8. Shoulder width, Ls = 2 m Ls = 2m
Table 3.1 ATJ5/85 9. Road Equivalence Factor, e = 3.0 e= 3
Table 3.2 ATJ5/85 10. Ideal hourly capacity on one way traffic flow, I = 1000 veh/hour (vph) I= 1000 vphl
Table 3.3 ATJ5/85 11. Roadway factor, R = 0.81 R = 0.81
TRAFFIC ESTIMATION :
cl. 3.3.4ATJ5/85 1. Initial annual commercial traffic for one direction, Vo
Vo = [ADT x 0.5 x 365 x (Pc/100)]
= 8377 veh/lane (vpl) Vo = 8377 vpl
cl. 3.3.5ATJ5/85 2. Accumulative sum of commercial vehicles one direction for x year, Vc
x
Vc = Vo [ (1+r) - 1 ]
r
= 167733 veh/lane (vpl) Vc = 167733 vpl
cl. 3.3.9ATJ5/85 3. Total equivqlent standard axles, ESA
ESA = Vc x e
= 5.0320E+05 ESA = 5.0320E+05