Professional Documents
Culture Documents
Ground Floor Plan - Rev 6
Ground Floor Plan - Rev 6
OHD
+15.60
(-950)
3mW X 3mH
RAMP
SLOPE 1:10
OHD
WET BLASTING
RM STORAGE RACK
PUMP ROOM
6
RAMP DOWN
SLOPE 1:10
ELGI
COMPRESSOR. 6
10 T EOT CRANE
6
FABRICATION YARD
WALK WAY WALK WAY WALK WAY WALK WAY WALK WAY
WALK WAY
6 6
WATER JET CLEANING
SLOPE 1:10
RAMP
OHD
WALK WAY WALK WAY
KCOTS DAEH
RM STORAGE RACK
6 6
6
KCOTS DAEH
WALK WAY
6
6
RM STORAGE RACK
RM STORAGE RACK
5
6 500KG HOIST
ASSEMBLY ROOM
12700 X 8700 X 5000
WALK WAY
4
6
6
* ASSEMBLY ROOM BUILT
* MACHINES ARE SHIFTED
* WATER JET CLEANING IS BUILT 12/01/2023
JIB CRANE-1 6
* STORAGE RACK ARE ADDED.
WALK WAY
ASSEMBLY ROOM +16.55 FFL +16.40FGL DO NOT SCALE THE DRAWING FOLLOW DIMENSIONS ONLY
12700 X 8700 X 6000 COVERED CAR PARK
(+0.30m FFL) (+0.15m) CLIENT:-
Ramp
HYDROFIT FZE
JOB TITTLE:-
8mW*1.8mH
DRAWING TITLE:-
12 13 14 15 16 17 18 19
AL HILAL
6mW*1.8mH ENGINEERING CONSULTANTS
DUBAI P .O . BOX : 112778
DOUBLE SWING GATE TEL : 3344400,FAX: 3344224
E-mail: alhilalc@emirates.net.ae
File Name :-
131
AR 03