JASA PERANCANGAN, PENGADAAN DAN KONSTRUKSI (EPC)

PEMBANGUNAN PIPA GAS SENIPAH - BALIKPAPAN

INSPECTION REPORT
FIELD JOINT COATING

Date : 03-Jan-23 Report No : -FJC/40/SNBP/PTG-PGAS/I/2023


Page : 1 OF 1 Location/KP : KP 01R
Size / Material : 20" Section : SPREAD 1

Adhesion Test/ Peel


Heating of Pipe (0C)
(Before Start Work)

Shrinkable Sleeves
Surface Preparation Holiday Test

Pipe Temperature
Relative Humidity

Dew Point (ͦC)

Visual Check
Type of Heat
Time (WIB)

Surface Profile
(RH) %

Cleanliness

Test
No. KP No. JOINT No. Remarks
Kv Result

1 KP 01R-20 T-58 17:00 62.3 25.5 33.0 SP3 48µm 100 - M 80 OK 12 ACC

Prepared/Inspected by, Reviewed/Approved by, Reviewed by,


PT. PGAS Solution PT. Pertamina Gas Perusahaan Inspeksi/PI

Date : Date : Date :