Well History 18 September 2017

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Well KB Perforation sub-sea, Net Pay Zone Date Production Test

No m/ft Interval, ft KB ft. ft Open Close


40 M-42 200 2896-2906 -2696 10 AB4-b Nov.'10 Dec.'10-BP Test 12 Nov. : 149 BFPD, 109 BOPD, 27%WC, SL/SPM : 96'/4, 2.25".
Test 16 Nov. : 8 BOPD, 0%WC, SL/SPM : 96'/4, 2.25".
2190-2200 -1990 10 AB1-a mdl Nov.'10 Dec.'10-BP 26 Nov. : Reperf at the same interval AB4-b & added AB1-a.
Sep.'12-Szq 30 Nov. : 155 BFPD, 17 BOPD, 89% WC.
9 Dec. : 133 BFPD, 4 BOPD, 97% WC.
1910-1918 -1710 8 AB1-b Dec.'10 Isolated AB4-b & AB1-a, perforated AB1-b : 1910-1918' KB
Test 26 Dec.'10 : 100 BOPD, 0% WC, SL/SPM : 96"/4,0, 2.25" THP.
Test 27 Dec.'10 : 41 BOPD, 0% WC, SL/SPM : 96"/4,5
Test 11 Jan.'11 : 15 BOPD, 0% WC, SL/SPM : 96"/3,6
2896-2906 -2696 10 AB4-b Sep.'12 Drilled-out BP, squeezed AB1-a upr, reperf'ed AB4-b.
After reperf.(13 Sep.) : 14 BFPD, 63% WC, 5 BOPD, SL/SPM: 100'/3,7; sub: 32'
Added AB2-b.
2665-2675 -2465 10 AB2-b After ( 22 Sep.) : 44 BFPD, 73% WC, 12 BOPD, SL/SPM: 96'/3 ; submgn: 33'
2250-2260 -2050 10 AB2-e Jan.'13 Added AB2-e. Before (4-Jan) : 5 BFPD, 4 BOPD, 25% WC, sub: 53'.
After (07-Jan): 10 BFPD, 8 BOPD, 21 % WC, sub: 30'
Oct.'14: WS, TV leak. Suspected due to abration.
2810-2816 -2610 6 AB3-a Apr. '17 Added AB3-a
Before (08/04/2017): 8 BFPD, 8 BOPD, 0% WC.
After ( 19/04/2017): 54 BFPD, 21 BOPD, 61% WC.

file:///conversion/tmp/activity_task_scratch/639583559.xlsx Page 1
01/19/2023

You might also like