OCTOBER Schedule of Tasks
OCTOBER Schedule of Tasks
Objectives Task
1 Obtain Measurement Data Write a function which obtain measured data
Prepare the window application tool (Gtool) for recording
measured data
2
3 IS670 Mounting Design a mounting set up to be used in OTC
4 Assemble and test the mechanical set up (in - house)
5 IS670 Prototype Build a working IS670 prototype
6 Prepare the Rx boards
Position the Rx board in where it gets the highest UV energy
7
Lessen the noise read in UV, Inner IR and Outer IR Channel
8
Establish an optimum Gain Cointrol Level by configuring digipot
Value
9
10 In - House Testing Prepare the test rig
11 Set up IS670 Prototype
12 Obtain and record measured data via Gtool
13 On - Site Testing @OTC Set up IS670 Mounting and Prototype BEFORE the Oven
14 Obtain and record measured data via Gtool
15 Change the Rx Board and obtain Data
16 Set up IS670 Mounting and Prototype AFTER the Oven
17 Obtain and record measured data via Gtool
18 Change the Rx Board and obtain Data
19 Summary Create a Narrative and Test Report
Prepare the obtain data for the software and algorithm
development
20
Team Status 18 19 20 21 22
Software DONE
Software
DONE
Mechanical DONE
Mechanical ON-GOING
Hardware ON-GOING
Hardware ON-GOING
Hardware
PENDING
Mechanical
ON-GOING
Software
ON-GOING
Hardware DONE
Hardware PENDING
Software PENDING
ALL TBA
ALL TBA
ALL TBA
ALL TBA
ALL TBA
ALL TBA
ALL TBA
Software
TBA
File
12
13
14
15
16
17
18
19
QUESTIONS for OTC
Linear Speed
Speed in can per minute
How do OTC Reject bad cans from the line?
How do rejected cans look like
Can the gap between can bodies be made bigger?
Width of side stripe lacquer
Width of weld line
Length of cans
Diameter of can
Gap size (air) between each can
Is this line representative for all the lines, If not what are the differences?
What kind of side stripe lacquer system do they have? How does it work? What goes wrong with
it?
Does it require any operator attentions or is it fully automatic
If not automatic what do they have to do? How often? How long does it ake to do what they need to do
Have they had external side stripe issues? How often?
How did they find out about the problem
What are the corrective measure?