DMR-1. Dated 9-10-2022

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Hilong Mud Service

DAILY DRILLING FLUIDS REPORT UEP


Well Name: TAJ-7
Report Number 1 Country Pakistan Spud Date 10/9/2022
Date Submitted 10/9/2022 State Sindh Operator UEPL
Time Submitted 12:00 AM County/Parish Pakistan Operator Rep Liu/Hu
Hole Interval 12 1/4 Field/Lease Mirpur Khas Contractor ZPEC
Wellbore MD 1,500 ft Basin _ Contractor Rep
Wellbore TVD 1,500 ft Target Formation Upper Sands (B-Sand) Rig Name/Number ZPEC-33
Bit Depth 1,500 ft Legal/Survey . API#
Latitude\Longitude Present Activity Drilling Mud System Gel Mud
Daily Fluid Checks Volumes (bbls) Current Hole Details
Properties Fluid Spec Check1 Check2 Annulus Drilling Assembly Well Bore Sections
Sample From F/L -45.2 Type OD(in) ID(in) Len(ft) Type OD(in) ID(in) From(MD) To(MD)
Sample Time 11:00 AM 11:00 AM Total Hole DP 5.0 4.27 660.45 OPEN 12.25 0 0
Sample MD (ft) 883 833 -26.50 HWDP 5.0 3.0 519.00
Flow Line Temp (F) 90 96 Active Pits JAR 6.5 2.75 32.16
Check Temp (F) 120 120 900.000 DC 6.5 2.813 185.00
Density (ppg) 8.8 8.8 Total Active DC 8.0 2.813 89.00
Funnel Vis (sec/qt) 47 48 873.5 Stab 12.25 2.813 11.06
Rheology Temp (F) 120 120 In Storage BIT/SUB 12.25 2.813 3.33
PV (cPoise) 11
YP (lbs/100ft^2) 19 Current Survey
10s gel (lbs/100ft^2) 10 9 Survey MD (ft) Pump/Circulation Information
10m gel (lbs/100ft^2) 18 13 Model Liner Stk Len Eff% bbl/stk Stk/Min Flow (gal/min)
30m gel (lbs/100ft^2) 26 18 Survey TVD (ft) P#1 6.5 in 12. in 97 0.1194 0.0
API Filtrate (cc/30m) 13.0 14.0 P#2 6.5 in 12. in 97 0.1194 0.0
Filter Cake (in/32) 2 2 KOP (ft) P#3 0.0 0.0
Alk - pH 9.5 9.5 Total Flow on Hole (gal/min) 0.0
Alk - Pm 0.45 0.45 Landing Point (ft) Circulation Numbers Standpipe Press (psi)
Alk - Pf 0.3 0.28 Surf to Bit (stks/min) --
Alk - Mf 0.42 0.44 Inclination (deg) Bottoms Up (stks/min) -- Surface RPM
Chlorides (mg/L) 1200 750 Total Circ (stks/min) --
MBT (ppb equiv) 22.00 23.00 Lateral Length (ft) IADC Hours Solids Control Equipment
Excess Lime (ppb) 0.04 0.05 Action Hrs Type Size Hours
Total Hardness (mg/L) 250 240 Bit Information Rig UP Shaker-1
Ca++ Specific (mg/L) 80 160 Size 12.25 (in) M/U BHA & RIH Shaker
Silicate % by Volume 0 0 Bit# 1 Drilling De-Sande
KCl % by Weight 0.00 0.00 Hours De-Silter
LCM ppb Mfr Centrifuge
Retort Water % 96.8 98.0 Model Centrifuge
Retort Oil % 0.0 0.0 Depth In Rheologies / Solids Analysis / Annular Hydraulics
Retort Solids % 3.2 2.0 RPM Six-Speed Rheologies Solids Analysis
Corrected Solids % 3.13 1.96 WOB Ck1 Ck2 Ck1 Ck2 Ck1 Ck2
Sand % 0.1 0.1 Torque 600 100 HGS% 0.20 1.40
Brine/Filtrate (SG) 1.00 1.00 Nozzles/Jets 300 6 HGS ppb 2.9 20.6
Oil : Water Ratio 0 : 96.8 0 : 98 Qty Size (in/32) 200 3 LGS% 2.93 0.55
7 13 LGS ppb 26.7 5.1
Additional User Defined Properties Annular Hydraulics Ck2 DS % 0.43 -2.82
Behavior Index, n DS ppb 3.9 -25.7
K (#sec^n/100ft^2) ASG 2.70 3.75
TFA 0.907 (in^2) Max AV (ft/min) 0.00 TVD for ECD
Daily Inventory Details Min AV (ft/Min) 0.00 Flow Regime
Product Name Size Unit Start Rec Ret Used End Cost ECD @ Bit (ppg) Bit
BH-Black Magic SFT 55 lb 0 80 0 80 0.00 ECD @ Shoe (ppg) Shoe
Bio Paq 25 kg 0 0.00 Fluid Comments / Recommendations Non-Reported
CORROSION INHBITOR 55 gal 0 0 0.00 Mud Engineers arrived at location on 05-October-2022. Inspected and hydro tested mud
Driscal D 25 lb 0 0 0.00 tanks system for proper function changed the leaked valve. Performed chemical analysis
Dristemp 55 lb 0 0 0.00 of makeup water, found Ca 650 mg/l and Cl 1500 mg/l. Prepared 900bbl. Gel mud/ 8.7
HL-ASEAL 25 kg 0 120 0 120 0.00 ppg using Soda Ash, Caustic Soda, Bentonite,XC and PAC-R.Prepared 400 bbl Kill
Mud/12ppg using Soda Ash, Caustic Soda, HL-XC and Barite.Prepared 800 bbl. fresh
HL-BAR 1500 kg 97 20 77 3216.00
KCL Polymer mud/ 8.9 ppg using Caustic Soda as pH modifierSoda Ash to treat out
HL-BCIDE 5 gal 0 5 0 5 0.00
divalant ions, KCL, PAC-LV, CaCO3-F, HL-XC and weight up samewith Barite. Dressed
HL-CARB(Fine) 1000 kg 23 0 23 0.00 Shakers with 2x40,2x60 & 2x40,2x60 API screens and MudCleaner with old 210x3 API
HL-CARB(Medium) 1000 kg 0 0 0.00 screens. Chemicals of KCL polymer mud will be chargedtomorrow. Prepare Hi/Vis and
HL-D.D 55 gal 0 2 1 1 456.00 sweep hole clean after each stand down.Receivedchemicals as per inventory.
HL-FIBER F 25 kg 0 160 0 160 0.00
HL-Fiber M 55 lb 0 0 0.00
HL-GEL 1000 kg 0 12 8 4 1152.00
LC-LUBE PLUS 25 kg 0 0 0.00
HL-LUBE 55 gal 0 49 0 49 0.00 Drilling Comments
HL-PAC LV 25 kg 232 0 232 0.00 PJSM for R/U. Finalized R/U. R/U 100%. Cont P/U, M/UP 5" DP, 5"
. Cr iculat e hole clean.

HL-PLUS 25 kg 0 80 0 80 0.00 HWDP & 6-1/2" DC stands and R/B on derrick ( M/UP total 80 stands of 5"
HL-XC 25 kg 0 114 18 96 3040.74 DP, 8 stands of 5" HWDP and 3 stands of 6-1/2" DC ). Position 9-5/8"
HYDRO SPERSE CF 25 kg 0 0 0.00 casing to pipe rack. PJSM. P/U & M/U 12-1/4" Rotary BHA single by single
KCL 1000 kg 0 45 6 39 6132.06 to 240 ft, RIH and washed down to bottom of 13-3/8" Conductor at 240 ft.
KWICK SEAL F 25 kg 2 0 2 0.00 Conducted pre spud meeting in the morning(by D&C Engineer) Rig
KWICK SEAL M 25 kg 0 0 0.00 accepted for operation at 15:00 hrs on 9-Oct-2022. Spud well at 18:00 hrs
MICA F 25 kg 0 1 0 1 0.00 Daily Additions Daily Losses Volume Net Change
MICA M 25 kg 0 0 0.00 Prod 85.6 Surf Prev. Active 0.0
CITRIC ACID 25 kg 0 0 0.00 Water 2,100.0 Hole 0.0 Prev. Storage 0.0
NaOH 25 kg 0 114 10 104 360.00 Recovery Dischrg 0.0 Curr. Active 873.5
OXYGEN SCAVEGER 55 gal 1 0 1 0.00 Evap 0.0 Curr. Storage 0.0
PAC-R 25 kg 0 40 4 36 361.28 DUMP
PERMALOS HT 25 kg 0 0 0.00 FILL UP 0.0 Net Change 873.501
HYDRO-PLAST 25 kg 0 240 0 240 0.00 Daily Cost Details Well Cost Details
SODA ASH 25 kg 0 104 10 94 387.00 Product 15,105.08 Product 15,105.08
SODIUM BICARBONATE 25 kg 0 0 0.00 Engineering Engineering 0.00
MAX GUARD 55 gal 0 26 0 26 0.00 Delivery Delivery 0.00
Salt 1000 kg 0 0 0.00 Tax 0.00 Tax 0.00
W.O.DEFOAM 5 gal 0 24 0 24 0.00
TARPAULIN 1 each 0 0.00 Daily Total 15,105.08 Well Total 15,105.08
Mud ENGR Nisar Ahmed Mud ENGR Haseeb Ahmed WAREHOUSE 0313-3559844

You might also like