This document provides the submission and revision status of a drawing for an ash intake valve with a 200 NB size below ESP hoppers and ECO/SCR duct hoppers. It was originally submitted for approval on April 29, 2010 and was revised as per comments on August 31, 2010. The drawing is for the M-LOT7 Ash Handling Plant project with contract number 100210/LILAMA-TECPRO.
This document provides the submission and revision status of a drawing for an ash intake valve with a 200 NB size below ESP hoppers and ECO/SCR duct hoppers. It was originally submitted for approval on April 29, 2010 and was revised as per comments on August 31, 2010. The drawing is for the M-LOT7 Ash Handling Plant project with contract number 100210/LILAMA-TECPRO.
This document provides the submission and revision status of a drawing for an ash intake valve with a 200 NB size below ESP hoppers and ECO/SCR duct hoppers. It was originally submitted for approval on April 29, 2010 and was revised as per comments on August 31, 2010. The drawing is for the M-LOT7 Ash Handling Plant project with contract number 100210/LILAMA-TECPRO.