500D x 1800W DENOTES CONCRETE POST TENSION BEAM DEPTH AND WIDTH
H
DENOTES CONCRETE HOB
A B C D E
TMJ
DENOTES TEMPORARY MOVEMENT JOINT, REFER TO DETAILS ON DRAWING S330
PMJ
DENOTES PERMANENT MOVEMENT JOINT, REFER TO DETAILS ON DRAWING S330
CW1/O
1 DENOTES LOAD BEARING CONCRETE WALL OVER
S430
CW1 CW1/U
DENOTES LOAD BEARING CONCRETE WALL UNDER
CW1
2
2
3 CW1
CC
CC
CC
DENOTES LOAD BEARING CONCRETE WALL OVER AND UNDER
S430
1A SIM G
O
2
1/
CC
DENOTES REINFORCED CONCRETE COLUMN OVER
CC
CW1
CW1
S330
250
CW1
U
1/
DENOTES REINFORCED CONCRETE COLUMN UNDER
CC
3
CC
CC
2A H SIM
1
DENOTES REINFORCED CONCRETE COLUMN OVER AND UNDER
CC
CW1 S330
3
CW1
CC
-50 -50 -50 -50 -50 -50
-50
TMJ
CC1 1000 x 350 REFER S030 FOR REINFORCEMENT DETAILS
CC2 1000 x 180 REFER S030 FOR REINFORCEMENT DETAILS
CC3 1200 x 180 REFER S030 FOR REINFORCEMENT DETAILS
-50 -50 CC4 1000 x 200 REFER S030 FOR REINFORCEMENT DETAILS
-50 -50 -50 -50 -50 -50 CC5 1600 x 180 REFER S030 FOR REINFORCEMENT DETAILS
3A
3
3
CC
CC
CC
CC
CC
WALL SCHEDULE
MARK COMMENTS
250 PROPRIETARY
CW1 AFS LOGICWALL LW262D., REFER TO WALL ELEVATIONS FOR
4A REINFROCEMENT
2
2
CC
CC
CC
CC
CC
LW1 AFS LOGICWALL LW262D, REFER TO WALL ELEVATIONS FOR
REINFORCEMENT
A1 A2 4
J1 N12-200, REFER TO DRAWING S071 FOR DETAILS
B1,B2,B3,B4
K1 N12-200, REFER TO DRAWING S071 FOR DETAILS
13N12-200 J1 J2 N12-200, REFER TO DRAWING S071 FOR DETAILS 3
10N12-200
B5
3N20-200
2300L 2300L 2300L K3 N16-200, REFER TO DRAWING S071 FOR DETAILS
A3 J4 N16-200, REFER TO DRAWING S071 FOR DETAILS 1
1400L
J2
B14 K4 N16-200, REFER TO DRAWING S071 FOR DETAILS
1B L1 4N16-300, REFER TO DRAWING S071 FOR DETAILS 2
A7 M1 4N16-300, REFER TO DRAWING S071 FOR DETAILS
2A
ALL UNSUPPORTED BARS TO BE TIED IN A TRANSVERSE DIRECTION WITH
3N20-50 3N20-50 3N20-50 3N20-50
2400L
2400L
2400L
7N20-150
7N20-150
7N20-150
N12-900 U.N.O.
2400 3200L 3200L 3200L 3200L
2B
2400
N12-200
13N12-200 A4,A5,A6
B13
DENOTES 2N12
A - DENOTES BAR TAG TRIMMER BARS
J2
J1
B12 TOP & BOTTOM
B6 AT RE-ENTRANT
N12-200 'A' CORNERS
7N20-150
7N20-150
7N20-150
2400L
2400L
2400L
3N20-50 3N20-50 3N20-50 3N20-50 3N20-50 REFER TO DRAWINGS S070 AND S071 FOR TYPICAL SLAB EDGE REINFORCEMENT
3200L 3200L 3200L 3200L 3200L AND POST TENSIONING DETAILS.
3A A8/A9
B11
3N20-200
1400L
11N12-200
3N20-200
1400L
4B N12 500
B7/B8/B9/B10 32 MPa &
N16 750
40 MPa
N20 1000
NOTE:
LEVEL 2 BOTTOM REINFORCEMENT PLAN PART 1 - TABLE REFERS TO D500N GRADE BARS
- THIS TABLE SHOULD BE USED UNLESS LAP LENGTHS ARE
NOTED OTHERWISE ON DETAILS.
A B C D E
T1
1A
6,665 mm
2300 2300 2300 2300 2300 2300
180 mm
2500
2300
2300
2300
1,200 mm
1B
T1 T1 T1 T1
2A
H2-5 CONCRETE SLAB
2300
2300
2300
T1
T1
T1
CLOSED TIES SCHEDULE
2300
T1
TAG SHAPE DESCRIPTION
2B
H2-3
T1 N12 CLOSED TIES AT 250 MAX. CTS. U.N.O. PROVIDE
N16 HORIZONTAL BAR IN EACH CORNER OF THE TIES
THE FIRST CLOSED TIE IS TO BE LOCATED A
MAXIMUM OF 100mm FROM THE FACE OF THE COLUMN.
H2-4 NOTE:
SL2-2 • REFER TO SLAB PLANS FOR SLAB THICKNESSES.
H2-2 H2-1 • VARY STIRUP DEPTH WITH SLAB FALLS.
2300
2300
2300
2300
2300
H2-4
T1
T1
T1
1,200 mm
3A T1 T1
180 mm
T1 T1 T1
2300
2300
2300
SL2-1
T1
T1
ELECTRONICALLY.
DATE REV: 3 A1 SIZE
E
V
SH OF
A B C D E
DENOTES 2N12
A - DENOTES BAR TAG TRIMMER BARS
D4 TOP & BOTTOM
C1/C2/C3/C4/C5 AT RE-ENTRANT
'A' CORNERS
D1
13N12-200 K1
REFER TO DRAWINGS S070 AND S071 FOR TYPICAL SLAB EDGE REINFORCEMENT
1A C6
AND POST TENSIONING DETAILS.
10N12-200
5N20-200
C16
C20
K2
2800L
1B
1100
1100
1100
D3
D2 D5
2A CONCRETE SLAB
6N20-150
5600L
6N20-150
5600L
6N20-150
5600L
4100L 4100L 4100L DEVELOPMENT LENGTH SCHEDULE
C18 CONCRETE BAR TYPE SLABS
2B STRENGTH
2400
N12-200
C15 K2 13N12-200
N12 500
T2-2 C7 32 MPa &
C19 N16 750
C14 40 MPa
C17 N20 1000
K1
NOTE:
K2
- TABLE REFERS TO D500N GRADE BARS
D6 - THIS TABLE SHOULD BE USED UNLESS LAP LENGTHS ARE
NOTED OTHERWISE ON DETAILS.
6N20-150
6N20-150
6N20-150
10N12-200
5600L
5600L
5600L
5N20-200
3N20-150 3N20-150 5N20-100
2800L
4000L 4000L 4000L
3A
1000
1000
1000
C8
11N12-200
T2-1
3B
4A
K1
C9/C10/C11/C12/C13
4B
ELECTRONICALLY.
DATE REV: 3 A1 SIZE
E
V
SH OF
N12-200 'L' BARS REFER TO BOTTOM N12-200 'L' BARS REFER TO TOP
REINFORCEMENT PLAN REINFORCEMENT PLAN
TYPE J2 TYPE K2
TYPICAL SLAB EDGE TYPICAL SLAB EDGE
REINFORCEMENT REINFORCEMENT
N16-200 'L' BARS REFER TO BOTTOM N16-200 'L' BARS REFER TO TOP
REINFORCEMENT PLAN REINFORCEMENT PLAN
TYPE J3 TYPE K3
TYPICAL SLAB EDGE TYPICAL SLAB EDGE
REINFORCEMENT REINFORCEMENT
N16-200 'L' BARS REFER TO BOTTOM N16-200 'L' BARS REFER TO TOP
REINFORCEMENT PLAN REINFORCEMENT PLAN
TYPE J4 TYPE K4
TYPICAL SLAB EDGE TYPICAL SLAB EDGE
REINFORCEMENT REINFORCEMENT
ELECTRONICALLY.
DATE REV: 2 A1 SIZE
E
V
SH OF
BIM 360://cabramurra/210354-01 Cabramurra Town Redesign C.rvt 11/05/2022 3:35:10 PM
DUCT
TENDON POSTION
REFR TO PLAN
DEPTH
SLAB
NOTES:
1. DEVIATE SLAB TENDONS GREDUALLY IN VERTICAL
DIRECTION TO ACCOMMODATE POSITION IN VARYING
SLAB THICKNESS
2. AT POINTS OF CONFLICT OF TENDONS, DUCT
LOCATIONS ARE TO BE SHIFTED UP OR DOWN NO MORE
THAN 20mm TO AVOID COLLISION
100 MIN.
TIES AS NOTED ON PLAN TO BE MINIMUM TOP TO COVER TENDON
LAID TO MINIMUM COVER POST-TENSION DUCT LAID TO MIN. TOP 600 MIN.
MINIMUM TOP TO COVER TENDON
TOP CORNER BARS IN SHEAR TIES. REFER TO COVER, REFER POST TENSIONING PLAN FOR
POST-TENSION DUCT LAID TO MIN. COVER TYIPCAL TIE ARRANGMENT DETAILS FOR SLAB CHAIR HEIGHT
1
DEPTH
DEPTH
SLAB
SLAB
PERPENDICULAR TIES TO BE 10
SMALLER THAN MAIN TIES POST TENSION DUCT
LAY 2nd LAYER UNDER DUCT IF WHERE APPLICABLE
REQUIRED TO MAINTAIN COVER SLAB PENETRATION
TOP CORNER BARS IN SHEAR POST TENSIONING DUCT
POST-TENSIONING DUCT TIES. REFER TO TYIPCAL TIE 50mm FROM
ARRANGMENT DETAILS FOR SLAB COLUMN FACE
TYPICAL ARRANGEMENT OF TENDONS AND TYPICAL ARRANGEMENT OF TENDONS AND TIE TYPICAL TENDON DETAIL AT PENETRATIONS & OPENINGS
REINFORCEMENT AT COLUMNS (SLABS) REINFORCEMENT AT COLUMNS (SLABS ONLY)
INTERNAL SLAB & BAND LOCATIONS INTERNAL SLABS
250
OA
100
OA
UNRAVEL STANDS AND 100 1-R10 HELIX,
LEAVE UNCUT 40mm 5 TURNS,
250 MIN. TOP COVER 100 60mm PITCH
OA 2/N16 BARS TOP &
100
OA
LEVEL 2
SECTION 1
S400
1B 2B 3B 4B
1A 2A 3A 4A
LEVEL 2
SECTION 2
S410
A B C D E
LEVEL 2
SECTION 3
S400
TOP REINFORCEMENT
TMJ-2 TMJ-1
ELECTRONICALLY.
DATE REV: 3 A1 SIZE
E
V