Professional Documents
Culture Documents
JI2048-975-MS-DAT-0067 - Rev001 (SP-1019)
JI2048-975-MS-DAT-0067 - Rev001 (SP-1019)
DESCRIPTION
REV.
Name of change(reason)
DATE PRPD CHKD APPD APPD Doc. Size A4
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
TABULATION OF HOLDS
Page /
Hold
Section Description of Holds
No.
No.
6 1 Nozzle Projection
9 4 Nozzle Orientation
9 5 Saddle Location
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
Material test certification shall be as per Type 3.1 under Quality Assurance route as stated in EU directive for all pressure
28 MILL TEST CERTIFICATE (EN10204) parts, non pressure parts welded to pressure parts, Welding consumables, Fasteners, Gaskets, load bearing parts.
Otherwise they shall be Type 3.2 certification. And Type 2.2 certification for non pressure parts/balance items.
20 Painting OL-TR-CR-011
21
22 APPLICABLE STANDARD DRAWINGS (UOP)
23 Vessel Skirt Details (Cylindrical Skirts) 3-102-7 Distributors - One Pass - Top Entry(3-140- to 3-182) -
24 Vessel Skirt Details (Conical Skirts) 3-103-6 Pipe Distributors For Horizontal Vessels 3-183-7
25 Baffles 3-115-9 Baffle Distributor For Horizontal Vessels 3-185-8
26 Grid Support And Baffle 3-116-10 Baffle and Wear Plate for Tangential Nozzle 3-187-5
27 Vortex Breakers 3-122-8 Tee Distributor For Horizontal And Vertical Vessels 3-190-12
28 Raised Vortex Breakers 3-123-8 Bubble Cap Tray Layout ID ≤ 2'-0" (600) 3-376-4
29 Coke Trap Details 3-127-7 Bubble Cap Tray Layout ID ≥ 2'-6" (750) 3-377-4
30 Distributor Trap (3-192- to 3-251) - Bubble Cap 3-378-4
31 Mesh Blanket Support(3-264- to 3-269) 3-265-8 Disc And Donut Pans 3-252-7
32 Withdrawal Nozzle (3-335- to 3-339) - Distributor Trap - Four Pass Intermediate 3-253-1
33 Skim Baffle In Partial Accumulator Tray 3-396-6 or Center - Side Tray Above Side to Side Pan
34 Collector Trays (3-340- to 3-353) - Side To Side Pan - (3-254 to 3-262) 3-256-7
35 Accumulator Trays(3-288- to 3-298) - Accumulator Trays (Chordal Vapor Riser) 3-276-6
36 Distributor Trap (3 pass & 4 pass)(3-402- to 3-418) - Draw off Sump 3-278-6
37 Top Head Inlet Distributor 3-425-7 Traps 3-280-7
38 Main Column Vapor Inlet Nozzle Detail 3-426-5 Support Grid 3-306-5
39 Top Head Inlet Deflection Plate 3-427-5 Distributors (3-312 to 3-315) -
40 Vessel Skirt Details - Cylindrical - Type 2 3-445-1 Wear Plate For Tangential Nozzle 3-315-8
41 Outlet Collector 3-447-1 Vortex Breakers 3-322-8
42 Spray Nozzle Assembly 8-148 Collector Assemblies - 6" Laterals 3-369-8
43 Collector Headers - 6" Laterals 3-370-7 Skim Baffle Details 3-392-7
44 Collector Laterals - 6" Laterals 3-371-8 Skim Baffle with Deflector Plate 3-393-0
45 Vent Gas Bed Support 3-380-4 Support Grid - 3'-0" (900) ID & Larger 3-384-7
46 Thermowell & skin thermocouple Installation 6-108-8
47 Assemblies
48
49 APPLICABLE STANDARD DRAWINGS (PETROFAC)
50 Vessel Tolerances For Vertical Vessel PEC-EN-SDR-M-3215 Internal Ladders For Vessel PEC-EN-SDR-M-3229
51 Vessel Tolerances For Horizontal Vessel PEC-EN-SDR-M-3216 Lifting Lug Top Head Type Or Trunnion PEC-EN-SDR-M-3230
52 Standard Bolt Hole Orientation PEC-EN-SDR-M-3218 Fireproofing And Insulation Support PEC-EN-SDR-M-3232
53 Skirt Base & Opening Details PEC-EN-SDR-M-3219 Name Plate With Bracket For Vessel PEC-EN-SDR-M-3233
54 Saddle Details For Horizontal Vessel PEC-EN-SDR-M-3220 Weld Deposit Detail For Nozzles And Internals PEC-EN-SDR-M-3239
55 Bracket Support For Vertical Vessel PEC-EN-SDR-M-3221 Base Ring Template PEC-EN-SDR-M-3240
56 Angle Leg Support PEC-EN-SDR-M-3222 Typical Weld Details PEC-EN-SDR-M-3238
57 Typical Earthing Lug PEC-EN-SDR-M-3223
58 Nozzle Reinforcement And Projection PEC-EN-SDR-M-3224
59 Manhole With Davit PEC-EN-SDR-M-3225
60 Manhole With Hinge Support PEC-EN-SDR-M-3226
61
62 LOCAL, STATE, NATIONAL CODES AND LEGISLATIONS
63 Law on the Supervision of Potentially Dangerous Equipment No. I-1324 Technical Regulations for Equipment and Protection Systems Used in
64 Law on Assessment of Conformity VIII-870 Potentially Explosive Atmosphere
65 Technical Regulation on Pressure Equipment Fire protection safety rules
66 Technical regalement’s of construction (STR 1, 2)
67
Order of Precedence for referring standard drawings : UOP standards / Specification requirements > Orlen standards / Specification requirements > Petrofac Standards
** SUPPLIER TO CONFIRM / FURNISH WHERE INDICATED.
EPC FOR RHCU ISBL AND FEED OSBL
PROJECT No. JI-2048
24"OD
Remarks
a) ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE SPECIFIED.
b) NOZZLE LOCATIONS ARE INDICATIVE & SHALL BE FINALISED LATER (HOLD 4)
c) (**) - BY VENDOR