Professional Documents
Culture Documents
Desenho
Desenho
PIPE SUPPORTS
13 SV_03 20 SV_03 4 -
14 SE-M17-0094 20 SE-M17-0094 1 -
15 SE-M17-0095 20 SE-M17-0095 1 -
FIELD MATERIALS
22 VE; BODY A105; AISI 410; ISO 17292; FF; 1.1/2 VBLAA7DFFOEACGACL128Z:H:0 1 10.0
CL150.;VE-44
TP M-000014 23 FBLD; A105; B16.5; FF; CL150.;FLG-05B 1.1/2 FBLABLDFFACGA1AZ:H:0 1 1.8
1 24 VE; BODY A105; AISI 410; ISO 17292; FF; 1 VBLAA7DFFOEACGACL128Z:F:0 1 5.5
C 1
CL150.;VE-44
25 FBLD; A105; B16.5; FF; CL150.;FLG-05B 1 FBLABLDFFACGA1AZ:F:0 1 0.9
906
450
459
5
CONT. ON
SW-043 5
54
I-IS-3010.96-1400-200-IA7-040
E 83400 7 F9 G16 B19
N 3500 462
2
F10
EL +42935 F10
6
585 2 44
65 165
585
8 F11 G17 B21 22
8 AFW
B EL +43260
23
G17 B21 STEM EAST
DRAIN-51114781
S13
SV03-M17-0505 SP-P70-1428-071-003
0 P67 SAME - AFC 03/07/16 DCFM IRS DS
REV. DESCRIPTION DATE EXEC. CHECK APPROV.
INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING
PROHIBITED OUTSIDE OF THEIR PURPOSE
FORM OWNED TO PETROBRAS N-381 REV. L
DESIGNER TECH RESP
COOEC / INTEGRA OFFSHORE TAO FUWEN
CONTRACT Nº CREA
3900.0000022.12.2 -
TUPI BV ENG-E&P/IEUEP-II/IEREPL
CLIENT:
E&P
JOB:
PRESALT FPSOs
AREA:
A PETROBRAS 70 (P-70)
TITLE:
A2
THERMAL TREAT NO OPERATION 26 791.50 PIPING SPEC SYSTEM
03/07/16 I-IS-3010.96-1428-200-O6A-071
594 mm x 420 (AFW) (FW) (TW) PAINT COND Nº2 SSOP 5111.51 TEST 2077.2 B14 M17_PIP_5111
mm
E F G H I J
PN FWD SHOP MATERIALS
PIPE SUPPORTS
11 GR_01 20 GR_01 3 18.3
12 SV_03 20 SV_03 11 -
13 SE-M17-0096 20 SE-M17-0096 1 -
14 GT_01 20 GT_01 1 4.5
15 SE-M17-0097 20 SE-M17-0097 1 -
16 SV_03 16 SV_03 4 -
17 GL_05 16 GL_05 1 16.9
FIELD MATERIALS
GR01-M17-0111 28
376
21 229 5
F10 G20 B23 4"NPD 1 25 27 EL +43209
S12
2 SP-P70-1428-071-011
SV03-M17-0435 S15 41 0 S16
0
SE-M17-0097 449 12 535 SV03-M17-0518
SP-P70-1428-071-008 20
F8 G19 B22 2
12 F7 G18 B21 459 F8
S12 17 33
SV03-M17-0513 35 S17
S14 F7 GL05-M17-0026
SP-P70-1428-071-007
GT01-M17-1069
16
1 8 77 2 24
1 S12
E 115150
S12 13
14 19 E SV03-M17-0516
F7 G18 B21 1 75 SP-P70-1428-071-009
SV03-M17-0507
F7 F7 46 22
S12
1 00
SV03-M17-0510 60 4
2629 1125 20X4"NPD S12
10 1 5 15 SV03-M17-0515
288 498 18
SEE SHT F7 1017
SW-071 SHT 1 00 F7 S12 3
60 F7 G18 B21 20X16"NPD
F7 G18 B21 SV03-M17-0512
51MM OFFSET
10
20"NPD 56 S12 FLAT SIDE D
B 2520
S12
SV03-M17-0511 SV03-M17-0519
S11
GR01-M17-0109 3633
11 S13
SPH-P70-1428-071-005 SE-M17-0096
S11 0 P67 SAME - AFC 03/07/16 DCFM IRS DS
GR01-M17-0110 S12 REV. DESCRIPTION DATE EXEC. CHECK APPROV.
CONTRACT Nº CREA
3900.0000022.12.2 -
TUPI BV ENG-E&P/IEUEP-II/IEREPL
CLIENT:
E&P
JOB:
PRESALT FPSOs
AREA:
A PETROBRAS 70 (P-70)
TITLE:
A2
THERMAL TREAT NO OPERATION 26 791.50 PIPING SPEC SYSTEM
03/07/16 I-IS-3010.96-1428-200-O6A-071
594 mm x 420 (AFW) (FW) (TW) PAINT COND Nº2 SSOP 5111.51 TEST 2077.2 B14 M17_PIP_5111
mm
E F G H I J
PN FWD SHOP MATERIALS
FIELD MATERIALS
894
SPH-P70-1428-071-016 12 GASKET; PLAIN; FULL FACE; COMPRESS SHEET 16 GNMAB7DFFAWYA1OZ:T:0.13 4 -
6
NON ASBESTOS; B16.21; FF; 3,2mm;
16"NPD
CL150.;JPH-10(150)
SPH-P70-1428-071-015 52 13 GASKET; PLAIN; FULL FACE; COMPRESS SHEET 1 GNMAB7DFFAWYA1PZ:F:0.06 2 -
NON ASBESTOS; B16.21; FF; 1,6mm;
F7 51 CL150.;JPH-09(150)
50 1
1
14 PAE; A193 B7, ZN-NI; B18.2.1; NUTS A194 2H, 1 LSBABNABIAAGZ:1:6 64 -
E 127972 AFW ZN-NI; B18.2.2. UNC-2A; ASME
N 3067 B1.1.;PAE-01 - 6 in. Length
EL +43050 55 15 PAE; A193 B7, ZN-NI; B18.2.1; NUTS A194 2H, 1/2 LSBABNABIAAGZ:0.5:3 8 -
AFW ZN-NI; B18.2.2. UNC-2A; ASME
8 82 B1.1.;PAE-01 - 3 in. Length
F7 16 VE; BODY A105; AISI 410; ISO 17292; FF; 1 VBLAA7DFFOEACGACL128Z:F:0 1 5.5
CL150.;VE-44
17 FBLD; A105; B16.5; FF; CL150.;FLG-05B 1 FBLABLDFFACGA1AZ:F:0 1 0.9
TP M-170082
PIPE SPOOLS
S11
1 F7 G12 B14 SP-P70-1428-071-012 SP-P70-1428-071-013 SP-P70-1428-071-014 SPH-P70-1428-071-015 SPH-P70-1428-071-016
SA03-M17-0148
SP-P70-1428-071-014
49
C 48 50
83 S10
SV03-M17-6167
95
F8 30
G13 B15
SP-P70-1428-071-013
127 17
34
F9 G13 B15 E
37 F7 G12 B14
5 7
F7 37
16
STEM EAST
VENT-51114779
58
7
36 3
35 16X1"NPD
4
45°
EL +43944
B SP-P70-1428-071-012
N 797
91
2 31
0 P67 SAME - AFC 03/07/16 DCFM IRS DS
E CONTRACT
3900.0000022.12.2
Nº CREA
-
16
"N
TUPI BV
PD
ENG-E&P/IEUEP-II/IEREPL
35
9
CLIENT:
29
E&P
JOB:
F7 G12 B14 PRESALT FPSOs
AREA:
A PETROBRAS 70 (P-70)
A2
THERMAL TREAT NO OPERATION 26 791.50 PIPING SPEC SYSTEM
03/07/16 I-IS-3010.96-1428-200-O6A-071
594 mm x 420 (AFW) (FW) (TW) PAINT COND Nº2 SSOP 5111.51 TEST 2077.2 B14 M17_PIP_5111
mm