Download as pdf
Download as pdf
You are on page 1of 2
Page No. 1/2 GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF POWER | 3B OFFICE OF THE CHIEF ENGINEER (POWER): EASTERN ELECTRICAL ZONE Dy VIDYUT BHAWAN, 2ND FLOOR, 0-POINT, ITANAGAR-791111 0360 2291919 Emaitceeezdop@gmailcom NO. CE (P)/EEZ/ST&D/RDSS-HHs Electfn./2022-23/ 4949-91, Dated 26-12-2022. To, The Chief Engineer Central Electrical Zone/Western Electrical Zone, Department of Power, Arunachal Pradesh, Itanagar. Sub: Proposal for households’ electrification for partially electrified and un- electrified habitations under RDSS, 1. The Monitoring Committee in its 15 meeting held on 28-11-2022 has approved the guidelines for electrification of left out households under RDSS. The extract of the 15‘ Monitoring Committee minutes is forwarded herewith along with DPR Template for household electrification work as received from the REC Limited, Regional office Guwahati, Assam vide email dated 14-12-2022, so you may submit the Proposal for households electrification under RDSS if any in the Districts under your Zone (duly verified by the concerned Superintending Frgineer and the Chief Engineer) to this office in hard and soft copy (editable excel sheet). 2. While preparing the proposal, the guidelines issued by the Monitoring Committee should be followed/adopted. 3. The proposal duly verified by the concerned Superintending Engineer and the Chief Engineer should be submitted/forwarded to this office on or before 16" January 2022. at (Gumdo Doji) CE (P) Cum SNO (ROSS). NO. CE (P)/EEZ/ST&D/ROSS-HHs Electin./2022-23/ 4949-91, Dated 26-12-2022, Copy to: yee Member Secretary (EC),Arunachal Power Development Agency,(A Govt. of A.P. Undertaking), Block No.lll, 5" floor, A. P. Civil Secretariat Itanagar for information along with a copy of guidelines, Poge No. 2/2 2. All the Distribution Superintending Engineers (E), Department of Power, Arunachal Pradesh may collect the guidelines for preparation of the Proposal from the respective Chief Engineer office, 3. All the Distribution Executive Engineers (E), Department of Power, Arunachal Pradesh may collect the guidelines for preparation of the Proposal from the respective Chief Engineer office.

You might also like