I, LOLOBETH G. MENDEZ of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and M
and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period July to December 2022.
LOLOBETH G. MENDEZ
Ratee
Date: _______________
Reviewed by: Date Approved by:
b.2 Implementation
100% of DA-PhilFIDA, TESDA & DOLE
programs complemented/facilitated to 100% of NEDA program
MLGUs and beneficiaries with average complemented/facilitated to MLGUs and
4 5 5
client satisfactory rating based on beneficiaries with average client
workplan/DFPPT satisfactory rating based on workplan
Coordinated to key stakeholders for 100% coordinated with the (a) resource
the activity speakers, (b) prospective participants and
(c) venue reservation one month before the
scheduled date of trainings
e.2 Implementation
Conduct of Activties 100% activities conducted with an Average
of at least satisfactory client satisfaction
rating within the set schedule
g.2 Implementation
Conduct of Activties 100% activities conducted with an Average
of at least satisfactory client satisfaction
rating within the set schedule
g.3 Post Activity
Preparation of Post -Activty Report 100% Post Activty reports prepared and
submitted to DC with minor corrections, 6
days after the activity
B. INVESTMENT PROMOTION PROGRAM
a. Municipalities complying wit ease of doing business provided with incentive
a.1 Preparatory Activity
1 Action plan submitted in complying with
100% of municipalities complying with ease
of doing business provided with incentive to
DTI/DILG, with minor corrections, within the
first quarter of 2022
a.2 Implementation
100% of municipalities complying with ease
of doing business provided with incentive, 100% PLGU complying with ease of doing
100% meet standards at the end of 3rd business provided with incentive, 100% 5 5 5
quarter meet standards at the end of 3rd quarter
C. SUPPORT TO OPERATIONS
100% of meetings per committee/task force 100% of meetings per committee/task force
(Climate Change) attended, minutes of the (Climate Change) attended, minutes of the
meeting prepared and submitted to DC with meeting prepared and submitted to DC with
minor corrections 3 days after the meeting no corrections 3 days after the meeting 5 5 3
100% of meetings per committee/task force 100% of meetings per committee/task force
(NVIDC) attended, minutes of the meeting (NVIDC) attended, minutes of the meeting
prepared and submitted to DC with minor prepared and submitted to DC with minor
3 5 1
corrections 3 days after the meeting content revisionbeyond 5 days after the
meeting
b. IPCRs (target) prepared and IPCRs (target) prepared as to prescribed IPCRs (target) prepared as to prescribed
submitted format and approved subnitted to format and approved submitted to
concerned official for review on the set concerned official for review on the set 5 5 5
deadline deadline
c. IPCRs (ratings) IPCRs (ratings) prepared as to prescribed IPCRs (ratings) prepared as to prescribed
format and approved subnitted to format and approved subnitted to
concerned official for review on the set concerned official for review on the set 5 5 5
deadline deadline
Attendance to meetings/seminars/trainings
a. General staff meeting/section 90% of scheduled general/section meetings 100% of scheduled general/section
meetings attended attended in full as scheduled 5 5
meetings attended in full as scheduled
Final Average Rating 4.46 4.93 4.30
Comments and Recommendation for Development Purposes
Discussed with Date Date Final Rating
Date
Outstanding – 5
Very Satisfactory – 4
Satisfactory – 3
Unsatisfactory - 2
Poor - 1
Remarks
A
4.67
5.00
NEDA Innovation Project: Handicraft
5.00 and souvenir Making (Oct 14-15);
souvenir making (Dec 12-15)
5.00
4.67
4.67
4.00
5.00
4.33
demand driven
demand driven
demand driven
demand driven
4.67
5.00
4.33
5.00
4.67
3.00
3.00
4.00
5.00
4.00
3.00
5.00
5.00
5.00
5.00
4.55
Date
TE L. ASUNCION
ead of Office
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)
I, MARICRIS B. ROMERO of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and M
attainment of the following targets in accordance with the indicated measures for the period January to December 2022.
a.2 Implementation
100% of DOST programs R. Romero Average Client survey rating
complemented/facilitated to
MLGUs and beneficiaries with 5=oustanding
average client satisfactory rating 4=very satisfactory
based on workplan/DFPPT 3=satisfactory
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
Preparation of Project Proposal 100% of project proposals M. Romero Project Proposals Prepared,
(Mungkahing Proyekto) prepared for livelihood requests submitted and accepted by the DC on
submitted and accepted by the 3rd presentation
DC on 3rd presentation within set 5=without correction
schedule 4=with minor correction
3=with
minor content revision
2=with major content
revsion
b.3 Post Implementation
Preparation of Livelihood Prepared, submitted and M. Romero Assessment Report submitted to DC
Assessment Report reviewed by DC the Assessment 5=without
Report, with minor correction, 6 correction
days after the assessment or site 4=with minor correction
validation 3=with minor content
revision
2=with major content revsion
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
f.2 Implementation
Assisted in the maintenance of 1 M. Romero Average Client survey rating
OTOP Hub with average very
satisfactory rating on plans 5=oustanding
implemented, within the set 4=very satisfactory
schedule 3=satisfactory
2=unsatisfactory
1=poor
2=unsatisfactory
1=poor
C. SUPPORT TO OPERATIONS
100% of meetings per M. Romero Minutes of the meeting prepared and
committee/task force (Climate submitted to DC
Change) attended, minutes of the 5=without correction
meeting prepared and submitted
to DC with minor corrections 3 4:=with minor correction
days after the meeting 3=with minor content
revision
2=with major content revision
4=4/12
1=2/12
b. IPCRs (target) prepared and IPCRs (target) prepared as to M. Romero 5=prepared as to prescribed format
submitted prescribed format and approved and approved submitted to DH for
subnitted to concerned official for review
review on the set deadline 1=not in accordance
with the prescribed format and
approved IPCR
c. IPCRs (ratings) IPCRs (ratings) prepared as to M. Romero 5=prepared as to prescribed format
prescribed format and approved and approved submitted to DH for
subnitted to concerned official for review, complete MOVs
review on the set deadline
3=prepared as to prescribed format
and approved submitted to DH for
review, no MOVs attached
vision of Entrepreneurship Development and Management Services, commit to deliver and agree to be rated on the
2022.
MARICRIS B. ROMERO
Ratee
Date: _______________
Date
ITTE L. ASUNCION
Head of Office
Outstanding – 5
Very Satisfactory – 4
Satisfactory – 3
Unsatisfactory - 2
Poor - 1
Rating
Remarks
E T
The action plan includes: 5=1 or more months before the set Means of Verification (MOVs):
5=100% of NGAs programs schedule (1) Q = Approved Action Plan: DC
complemented/ facilitated to MLGUs 3=2 weeks before the set schedule determine if a. without correction; b.
and beneficiaries 1=below 2 weeks minor correction, c. minor content
revision, and d. major content
1=Less that 100% of revision
NGAs programs complemented/ (2) E = Completeness
facilitated to MLGUs and of the Action Plan
beneficiaries (3) T = Date of
the Approval of the Action Plan
5=1 trade fair coordinated 5=2 months before the set schedule Means of Verification (MOVs):
1=0 3=below 2 (1) Q = Approved Communication
trade fairs coordinated months to 1 month before the set Plan and Receiving Copies of
schedule Communication Letters
1=below 1 month before the set (2) E =
schedule Response Letter or its equivalent
confirming the coordination
(3) T =
Date of the response letter or its
equivalent of the coordination
Prepared and submitted: 5=2 months before the set schedule Means of Verification (MOVs):
5=5 promo materials 3=below 2 (1) Q = Approved Promo Materials
3=4-3 promo materials months to 1 month before the set
1=Less than 3 promo materials schedule (2) E = No. of Promo Materials
1=below 1 month before the set (3)
schedule T = Date of approval
5=1 Provincial Trade Fair conducted 5=within the set schedule Means of Verification (MOVs):
1=after the set (1) Q = Analysis of the Clients Survey
schedule Rating Report with date of receipt by
1= No Provincial Trade Fair the DC
conducted (2) E = Attendance
sheets, Post Activity Report and
photo documentation(s)
(3) T =
Date of Attendance sheets and Post
Activity Report
5 = 100% of livelihood request 5 = upon receipt of the Livelihood Means of Verification (MOVs):
entered in the livelihood database request (1) Q = Updated Livelihood
1 = Less 4 = 2 working days after the receipt Assistance Beneficiaries DataBase
than 100% of livelihood request of the livelihood request submitted to the DC: DC determine if
entered in the livelihood database 3= 3 working days after the a. without correction; b. minor
receipt of the request correction, c. minor content revision,
2=5 woking days after the and d. major content revision
receipt of the request
1 = after 5 working (2) E =Updated Livelihood
days after the receipt of the request Assistance Beneficiaries DataBase
The scheduled assessment and site 5 = within the set schedule Means of Verification (MOVs):
validation: 1 = after the set schedule (1) Q = Analysis of the Clients Survey
5 = 100% accomplsihed Rating Report with date of receipt by
4 = 99%-70% accomplished the DC
3 = 69%-50% (2) E = Signed (i.e.DC)
accomplished 1 = less assessment report vs scheduled list
that 50% accomplished of assessment
(3) T = Date of
actual visit vs set schedule
Project Proposals prepared and 5=within the set schedule (assessment report) (MOVs):
Means of Verification
submitted to the DC 1=after the set (1) Q =Project Proposals submitted
schedule to the DC: DC determine if a. without
5=100% correction; b. minor correction, c.
1=below minor content revision, and d. major
100% content revision
(2) E
=Project Proposals prepared and
Submitted to the DC
(3) T =Date
signed and approval of the report by
the DC
Assessment Report includes: Assessment Report submitted Means of Verification (MOVs):
5 = 100% of all Assessed and 5=3 days after the (1) Q = Signed (with date of signing)
Site Validated activity Assessment Reports: DC determine
3 = 99%-50% of the 4=4-6 days after the activity if a. without correction; b. minor
assessed and site validated 3=7-9 days after the correction, c. minor content revision,
1 = Less activity and d. major content revision
than 50% 2=10-13 days after the activity
1=beyond 13 days (2) E = No. of beneficiries included in
the report vs schedule site visit
(3)
T = Date of Signed the assessment
Reports
Memorandum of Agreement MOA prepared andt submitted to DC Means of Verification (MOVs):
prepared and submitted to the DC for 5=3 days after (1) Q =Memorandum of Agreement
review: the approval of the assessment report submitted to the DC: DC determine if
5=100% 4=4-6 days a. without correction; b. minor
3=7-9 days correction, c. minor content revision,
1=below 100% 2=10-13 and d. major content revision
days
1=beyond 13 days (2) E =Memorandum of Agreement
prepared and Submitted to the DC
5 = 100% of labelling requests of 5=upon receipt of the request Means of Verification (MOVs):
MSMEs profiled and assessed (1) Q = Analysis of the Clients Survey
1 = below 100% of labelling 1= after 1 working day upon receipt Rating Report with date of receipt by
requests of MSMEs profiled and the DC
assessed (2) E =Signed (i.e.DC)
profiling form and assessment report
submitted to DC
(3) T = Signed
(with date of signing) reports
submitted to DC
5 = 100% of labelling requests of 5=3 working days upon receipt Means of Verification (MOVs):
MSMEs acted upon with reports 3 = 5 working days upon receipt (1) Q = Analysis of the Clients Survey
1 = below 100% of labelling 1= Rating Report with date of receipt by
requests of MSMEs acted upon with after 10 working days upon receipt the DC
reports (2) E =Signed (i.e.DC)
report submitted to DC
(3) T =
Signed (with date of signing) reports
submitted to DC
5 = 100% of requests profiled and 5=2 working days upon receipt of Means of Verification (MOVs):
assessed request (1) Q = Analysis of the Clients Survey
1 = below 100% of requests profiled 3 = 5 working days upon receipt of Rating Report with date of receipt by
and assessed request the DC
1= after 7 working days (2) E =Signed (i.e.DC)
upon receipt upon receipt of the profiling form and assessment report
request submitted to DC
(3) T = Signed
(with date of signing) reports
submitted to DC
5 = 100% of requests of MSMEs 5=10 working days upon receipt Means of Verification (MOVs):
acted upon with reports 3 = 15 working days upon receipt (1) Q = Analysis of the Clients Survey
1 = below 100% of requests of 1= Rating Report with date of receipt by
MSMEs acted upon with reports after 15 working days upon receipt the DC
(2) E =Signed (i.e.DC)
report submitted to DC
(3) T =
Signed (with date of signing) reports
submitted to DC
5 = 100% of requests profiled and 5=3 working days upon receipt of Means of Verification (MOVs):
assessed request (1) Q = Analysis of the Clients Survey
1 = below 100% of requests profiled 3 = 5 working days upon receipt of Rating Report with date of receipt by
and assessed request the DC
1= after 7 working days (2) E =Signed (i.e.DC)
upon receipt upon receipt of the profiling form and assessment report
request submitted to DC
(3) T = Signed
(with date of signing) reports
submitted to DC
5=100% of proposals prepared and 5=10 working days upon receipt Means of Verification (MOVs):
submitted and approved by the DC 3 = 12 working days upon receipt (1) Q = Proposals prepared and
1= submitted to the DC
1=below after 12 working days upon receipt (2) E =Signed
100% of proposals prepared, (i.e.DC) report submitted to DC
submitted and approved by the DC (3)
T = Signed proposal with date of
submission to the concerned agency
5=4 Operation and Management 5= 3 working days after the ensuing Means of Verification (MOVs):
Action plan prepared and submitted quarter (1) Q = operation and management
to DC plan prepared and submitted to the
3= after 5 working days after the DC
1=less than 4 Operation and ensuing quarter (2) E =Signed (i.e.DC) report
Management Action plan prepared 1 = after 10 working days after the submitted to DC
and submitted to DC ensuing quarter (3) T = Signed
proposal with date of submission to
the concerned agency
5=1 OTOP hub maintained with 5=within set schedule Means of Verification (MOVs):
reports 1= after the set (1) Q = Analysis of the Clients Survey
schedule Rating Report with date of receipt by
1=No OTOP hub maintained with the DC
reports (2) E =Signed (i.e.DC)
report submitted to DC
(3) T =
Signed (with date of signing) reports
submitted to DC
5= 100% OTOP Hub Reports Post Activity Reports submitted Means of Verification (MOVs):
prepared and submitted 5=3 days after the (1) Q = Signed (with date of signing)
activity Post Activity Reports: DC determine
4=4-6 days after the activity if a. without correction; b. minor
1=Less than 100% 3=7-9 days after the correction, c. minor content revision,
OTOP Hub Reports prepared and activity and d. major content revision
submitted 2=10-13 days after the activity
1=beyond 13 days (2) E = No. of signed Post Activity
Reports
(3) T = Date of Signed
Post Activity Reports
5 = 100% of requests profiled and 5=3 working days upon receipt of Means of Verification (MOVs):
assessed request (1) Q = Analysis of the Clients Survey
1 = below 100% of requests profiled 3 = 5 working days upon receipt of Rating Report with date of receipt by
and assessed request the DC
1= after 7 working days (2) E =Signed (i.e.DC)
upon receipt upon receipt of the profiling form and assessment report
request submitted to DC
(3) T = Signed
(with date of signing) reports
submitted to DC
5=100% of proposals prepared and 5=10 working days upon receipt Means of Verification (MOVs):
submitted and approved by the DC 3 = 12 working days upon receipt (1) Q = Proposals prepared and
1= submitted to the DC
1=below after 12 working days upon receipt (2) E =Signed
100% of proposals prepared, (i.e.DC)proposals prepared and
submitted and approved by the DC submitted submitted to DC
(3) T =
Signed proposal with date recieved
by the requestee
5=20 MSMEs screened and 5=within the set schedule Means of Verification (MOVs):
assessed 1=after the set (1) Q = Assessment reprot with date
3= less than 20 MSMEs schedule of receipt by the DC: DC determine if
screened and assess a. without correction; b. minor
correction, c. minor content revision,
1=none and d. major content revision
5=100% of meetings per Minutes of the meeting or report Means of Verification (MOVs):
committee/task force members submitted (1) Q = Approved Minutes of
provided with agenda folders 5=3 days after the meeting Meeting: DC determine if a. without
3= 5 days correction; b. minor correction, c.
1=below 100% after the meeting minor content revision, and d. major
1=beyond 5 content revision
days (2) E = No. of
approved minutes of meeting vis-a-
vis total committee/task force
meetings
(3) T = Date of the approved
Minutes of the meeting or report
5=100% of meetings per Minutes of the meeting submitted Means of Verification (MOVs):
committee/task force 5=3 days after the (1) Q = Approved Minutes of
meeting Meeting: DC determine if a. without
1=below 100% 3= 5 days after the meeting correction; b. minor correction, c.
minor content revision, and d. major
1=beyond 5 days content revision
(2) E = No. of
approved minutes of meeting vis-a-
vis total committee/task force
meetings
(3) T = Date of the approved
Minutes of the meeting or report
JUDITTE L. ASUNCION
Head of Office
INDIVIDUAL PERFORMANCE COMMITMENT AND REVIEW (IPCR)
I, SYLVIA P. FLORES of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and Management Services, commit to
deliver and agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period July to December 2022.
SYLVIA P. FLORES
Ratee
Date: _______________
Reviewed by: Date Approved by: Date
a.2 Implementation
Conduct of Project Monitoring and 5 projects monitored with quarterly 1st semester accomplishments - 10
Assessment and annual monitoring and 5 projects monitored with quarterly projects monitored
evaluation (M&E) reports with an and annual monitoring and
average of very satisfaction survey evaluation (M&E) reports with an 4 5 5 4.67
rating within the set schedule average of very satisfaction survey
rating within the set schedule
a.1 Post Implementation Activity
Prepared 2 Quarterly M&E reports Prepared 2 Quarterly M&E reports 1st semester accomplishments - 2
and 1 Annual M&E report submitted and 1 Annual M&E report submitted qrterly M&E reports
to DC with minor corrections, within to DC without corrections, 6 days 5 5 5 5.00
10 days after the ensuing quarter after the ensuing month
b. Livelihood Assistance Acted Upon
b.1 Preparatory Activity
100% of livelihood requests entered
into the Livelihood Assistance 100% of livelihood requests entered
Database, with minor correction, into the Livelihood Assistance
5 5 4 4.67
within 2 days upon receipt Database, without correction, within
2 days upon receipt
Coordinated to key stakeholders for 100% coordinated with the (a) demand driven
the activity resource speakers, (b) prospective
participants and (c) venue
reservation one month before the
scheduled date of trainings
c.2 Implementation
Conduct of Activties 100% activities conducted with an demand driven
Average of at least satisfactory
client satisfaction rating within the
set schedule
d.2 Implementation
100% of B2P Beneficiaries
1 (100%) of B2P Beneficiaries
Assisted, with an Average of at least
Assisted, with an outstanding
satisfactory client satisfaction rating, 5 5 5 5.00
satisfactory client satisfaction rating,
within the set schedule
within the set schedule
d.3 Post Implementation
100% Post Activty reports prepared 100% Post Activty reports prepared
and submitted to DC with minor and submitted to DC with minor
4 5 4 4.33
corrections, 6 days after the activity corrections, 6 days after the
assessment
e. Business Recovery Program
e.1 Preparatory Activity
100% activity designs prepared and 1st semester accomplished
submitted to the DC with minor
corrections, 3 months before the set
schedule
Coordinated to key stakeholders for 100% coordinated with the (a) 1st semester accomplished
the activity resource speakers, (b) prospective
participants and (c) venue
reservation one month before the
scheduled date of trainings
e.2 Implementation
Conduct of Activties 100% activities conducted with an 1st semester accomplished
Average of at least satisfactory
client satisfaction rating within the
set schedule
B. SUPPORT TO OPERATONS
100% of meetings per 100% of meetings per
committee/task force (Climate committee/task force (Climate
Change) attended, minutes of the Change) attended, minutes of the
meeting prepared and submitted to meeting prepared and submitted to 5 5 3 4.00
DC with minor corrections 3 days DC with no corrections 3 days after
after the meeting the meeting
100% of meetings per 100% of meetings per
committee/task force (NVIDC) committee/task force (NVIDC)
attended, minutes of the meeting attended, minutes of the meeting
prepared and submitted to DC with prepared and submitted to DC with 3 5 1 3.00
minor corrections 3 days after the minor content revisionbeyond 5
meeting days after the meeting
I, MARVIN A. TUCAY of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and Management Services, commit to deliver and agree to be rated on the
attainment of the following targets in accordance with the indicated measures for the period July to December 2022.
MARVIN A. TUCAY
Ratee
Date: _______________
Reviewed by: Date Approved by: Date
a.2 Implementation
100% of DTI & other NGAs programs 100% of NEDA program
complemented/ facilitated to MLGUs and complemented/facilitated to MLGUs and
beneficiaries with average client 4 5 5 4.67
beneficiaries with average client
satisfactory rating, within the set schedule satisfactory rating based on workplan
1 Provincial Trade Fair conducted with an 1 Provincial Trade Fair conducted with an
Average of at least satisfactory client Average of very satisfactory client
4 5 5 4.67
satisfaction rating within the set schedule satisfaction rating within the set schedule
f.2 Implementation
1 OTOP Hub maintained with average 1 OTOP Hub maintained with average
very satisfactory rating on plans very satisfactory rating on plans 4 5 5 4.67
implemented, within the set schedule implemented, within the set schedule
f.3 Post Implementation Activity
1 OTOP Hub Annual Report (all 1 OTOP Hub Annual Report (all
performance indicators included) performance indicators included)
prepared and submitted to DC with minor prepared and submitted to DC without 5 5 5 5.00
corrections, 6 days after the activity corrections, 3 days after the activity
C. SUPPORT TO OPERATIONS
100% of meetings per committee/task Accomplished by Ms. Mendez (2nd
force (Climate Change) attended, minutes semester - NVIDC/Price Monitoring)
of the meeting prepared and submitted to
DC with minor corrections 3 days after the
meeting
100% of meetings per committee/task Accomplished by Ms. Mendez (2nd
force (NVIDC) attended, minutes of the semester - NVIDC/Price Monitoring)
meeting prepared and submitted to DC
with minor corrections 3 days after the
meeting
b. IPCRs (target) prepared and IPCRs (target) prepared as to prescribed IPCRs (target) prepared as to prescribed
submitted format and approved subnitted to format and approved submitted to
concerned official for review on the set concerned official for review on the set 5 5 5 5.00
deadline deadline
c. IPCRs (ratings) IPCRs (ratings) prepared as to prescribed IPCRs (ratings) prepared as to prescribed
format and approved subnitted to format and approved subnitted to
concerned official for review on the set concerned official for review on the set 5 5 5 5.00
deadline deadline
Attendance to meetings/seminars/trainings
a. General staff meeting/section 90% of scheduled general/section
100% of scheduled general/section
meetings attended meetings attended in full as scheduled 5 5 5.00
meetings attended in full as scheduled
Final Average Rating 4.74 5.00 4.33 4.70
Comments and Recommendation for Development Purposes
Discussed with Date Date Final Rating Date
I, ROEL P. DOLAYPAN JR. of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and Management
be rated on the attainment of the following targets in accordance with the indicated measures for the period July to December 2022.
b.2 Implementation
100% of NGAs programs 100% of NGAs programs
complemented/facilitated to MLGUs complemented/facilitated to MLGUs
and beneficiaries supervised with and beneficiaries supervised with 4 5 5
average client satisfactory rating, average ver satisfactory client survey
within the set schedule rating, within the set schedule
Review of Project Proposal 100% of livelihood beneficiaries with 100% of livelihood beneficiaries with
(Mungkahing Proyekto) mungkahing proyekto reviewed and mungkahing proyekto reviewed and
submitted to DH without corrections, submitted to DH without corrections,
5 5 5
10 working days after the site 10 working days after the site
assessment and validation assessment and validation
j.2 Implementation
Conduct of Activties 100% activities supervised in the
conduct of the activity with an Average
of at least satisfactory client
satisfaction rating within the set
schedule
k.2 Implementation
100% of B2P Beneficiaries supervised
in the assistance, with an Average of at
least satisfactory client satisfaction
rating, within the set schedule
l.2 Implementation
1 OTOP Hub maintained with average 1 OTOP Hub maintained with average
very satisfactory rating on plans very satisfactory rating on plans
implemented, within the set schedule implemented, within the set schedule 4 5 5
m.2 Implementation
100% activities supervised during the
conduct of the activity with an Average
of at least satisfactory client
satisfaction rating within the set
schedule
a.2 Implementation
100% of municipalities complying with 100% PLGU complying with ease of
ease of doing business provided with doing business provided with incentive,
incentive, 100% meet standards at the 100% meet standards at the end of 3rd 5 5 5
end of 3rd quarter quarter
a.3 Post-Implementation Activity
c.2 Implementation
100% of investment promotions 100% (1) of investment promotions
participated with average of 3 or participated supervised with a very
satisfactory client satisfaction survey satisfactory client satisfaction survey 4 5 1
rating at the end of 3rd quarter rating at the end of 4th quarter
C. SUPPORT TO OPERATIONS
100% of meetings per committee/task 100% of meetings per committee/task
force (Climate Change) attended, force (Climate Change) attended,
minutes of the meeting prepared and minutes of the meeting prepared and
submitted to DC with minor corrections submitted to DC with no corrections 3 5 5 3
3 days after the meeting days after the meeting
b. IPCRs (target) prepared and IPCRs (target) prepared as to IPCRs (target) prepared as to
submitted prescribed format and approved prescribed format and approved
subnitted to concerned official for submitted to concerned official for 5 5 5
review on the set deadline review on the set deadline
c. IPCRs (ratings) IPCRs (ratings) prepared as to IPCRs (ratings) prepared as to
prescribed format and approved prescribed format and approved
subnitted to concerned official for subnitted to concerned official for 5 5 5
review on the set deadline review on the set deadline
Attendance to meetings/seminars/trainings
a. General staff meeting/section 90% of scheduled general/section
meetings attended meetings attended in full as scheduled 100% of scheduled general/section 5 5
meetings attended in full as scheduled
Date
Outstanding – 5
Very Satisfactory – 4
Satisfactory – 3
Unsatisfactory - 2
Poor - 1
Remarks
A
4.67
5.00
5.00
5.00
5.00
4.33
5.00
5.00
demand driven
demand driven
5.00
5.00
4.67
5.00
5.00
4.33
5.00
5.00
4.67
5.00
5.00
4.67
5.00
5.00
4.67
3.33
4.33
4.00
4.00
3.00
4.00
3.00
5.00
5.00
5.00
5.00
4.67
Date
DIVISION PERFORMANCE COMMITMENT AND REVIEW (DPCR)
I, ROEL P. DOLAYPAN JR. of the PROVINCIAL COOPERATIVE AND ENTERPRISE DEVELOPMENT OFFICE, Division of Entrepreneurship Development and Management Services, commit to deliver and
agree to be rated on the attainment of the following targets in accordance with the indicated measures for the period January to June 2022.
a.2 Implementation
20 projects monitored supervised 20 projects monitored supervised with an average
an average of very satisfaction outstanding client survey rating within the set
survey rating within the set schedule 5 5 5 5
schedule
a.1 Post Implementation Activity
2 Quarterly M&E reports 2 Quarterly M&E reports reviewed and submitted to
reviewed and submitted to DH DH with minor correction, within 5 days after the
without corrections, within 10 ensuing quarter 4 5 5 4.67
days after the ensuing quarter
b.2 Implementation
100% of NGAs programs 100% of NGAs programs complemented/facilitated
complemented/facilitated to to beneficiaries supervised with an average of
MLGUs and beneficiaries satisfactory client rating, within the set schedule
PhilFIDA Filature Facility, DA-PRDP
supervised with average client 3 5 5 4.33
conduct of RAEB
satisfactory rating, within the set
schedule
3 trade fair events supervised in 3 trade fair events supervised in the coordination to
the coordination to the (a) the (a) prospective exhibitors and (b) venue
prospective exhibitors and (b) reservation, partner agency(ies), 2 months before
venue reservation, partner the scheduled date of the activity 5 5 5 5
agency(ies), 2 months before the
scheduled date of the activity
Review of Project Proposal 100% of livelihood beneficiaries 100% of livelihood beneficiaries with mungkahing
(Mungkahing Proyekto) with mungkahing proyekto proyekto reviewed and submitted to DH without
reviewed and submitted to DH corrections, 10 working days after the site
without corrections, 10 working assessment and validation
days after the site assessment 5 5 5 5.00
and validation
100% coordination with (a) 100% coordination with (a) resource speakers, (b)
resource speakers, (b) prospective participants and (c) venue reservation
prospective participants and (c) supervised, one month before the scheduled date
venue reservation supervised, of trainings 5 5 5 5
one month before the scheduled
date of trainings
j.2 Implementation
Conduct of Activties 100% activities supervised in the 100% activities supervised in the conduct of the
conduct of the activity with an activity with an Outstanding satisfactory client
Average of at least satisfactory satisfaction rating within the set schedule 5 5 5 5
client satisfaction rating within the
set schedule
j.3 Post Activity
100% Post Activty reports 100% Post Activty reports reviewed and submitted
reviewed and submitted to DH to DH with without corrections, 4-6 days after the
with without corrections, 8 days activity 5 5 4 4.67
after the activity
l.2 Implementation
1 OTOP Hub maintained with 1 OTOP Hub maintained with a very satisfactory
average very satisfactory rating rating on plans implemented, within the set
on plans implemented, within the schedule 4 5 5 4.67
set schedule
100% coordination with (a) 100% coordination with (a) resource speakers, (b)
resource speakers, (b) prospective participants and (c) venue reservation
prospective participants and (c) supervised, one month before the scheduled date
venue reservation supervised, of trainings 5 5 5 5
one month before the scheduled
date of trainings
m.2 Implementation
100% activities supervised during 100% activities supervised during the conduct of
the conduct of the activity with an the activity with an Outstanding client satisfaction
Average of at least satisfactory rating within the set schedule
client satisfaction rating within the 5 5 5 5
set schedule
a.2 Implementation
100% of municipalities complying As they come
with ease of doing business
provided with incentive, 100%
meet standards at the end of 3rd
quarter
a.3 Post-Implementation Activity
b. Investor's facilitated
b.1 Preparatory Activty
100% of requests profiled and As they come
needs assessment reviewed and
submitted to DH, with minor
corrections, 3 working days upon
receipt
c.2 Implementation
100% of investment promotions As they come
participated with average of 3 or
satisfactory client satisfaction
rating at the end of 3rd quarter
Attendance to meetings/seminars/trainings
a. General staff meeting/section 90% of scheduled 90% of scheduled general/section meetings
meetings attended general/section meetings attended in full as scheduled 5 5 5
attended in full as scheduled
Final Average Rating 4.77 5.00 4.63 4.80
Comments and Recommendation for Development Purposes
Discussed with Date Assessed by: Date Final Rating Date
I certify that I discussed my assessment of the performance with the
employee