Specification With Covering Page
Specification With Covering Page
Specification With Covering Page
(excluding supply of rails, PSC sleepers & thick web Switches) Electrical (railway Electrification and
General Electrification), Signalling and Telecommunication works for doubling of track between Rajpura
and Kakarla halt from ch 0.00 to 57.500 PKG 1 in Ambala Division of Northern railway, Punjab, India
As per the requirement of RDSO conveyed by specification and letter ref no.1,2, &3, Ev2
- Modulus of Elasticity test is mandatory at site to check the behavior of the bedding
layer, bearing capacity of soil as well as deformation condition at top of each formation
layer i.e. Subsoil/OGL, Embankment/Subgrade and Blanket.
Presently the Ev2 test is being carried out by Plate Bering Tester electronic device
instruments at the frequency of one test per km length of section at site.
As per the requirement of RDSO conveyed by specification and letter ref no.1,2, &3, Ev2
- Modulus of Elasticity test is mandatory at site to check the behavior of the bedding
layer, bearing capacity of soil as well as deformation condition at top of each formation
layer i.e. Subsoil/OGL, Embankment/Subgrade and Blanket.
Presently the Ev2 test is being carried out by Plate Bering Tester electronic device
instruments at the frequency of one test per km length of section at site.
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
One of the main characteristics influencing the durability of any concrete is its permeability.
Therefore, tests for permeability is being carried out for concrete bridges as per requirement
of RVNL Specification and IRS Concrete Bridge Code.
(1) Permeability test shall be mandatory for all RCC/PSC bridges under severe and extreme
environment;
(2) Under moderate environment, permeability test shall be mandatory for all major bridges
and for other bridges permeability test is desirable to the extent possible.
(3) Permeability test is required for RCC/PSC structural element only.
(4) The depth of penetration of moisture shall not exceed 25 mm as per cl.no.5.4.2 of IRS
CBC & cl.no. 7.3 of RVNL Specification.
The minimum frequency of sampling of concrete cubes of each grade as per cl.no.15.3 of
RVNL Specification
Quantity of concrete No. of samples
in work, m3
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional sample for each additional 50 m3 or part
thereof
Minimum Cube Compressive Strength required at 28 Days as per cl.no.16.1 RVNL Specification.
Grade of The mean of the group of test result any Any individual test result
Concrete consecutive 4
M15 18 N/mm2 12 N/mm2
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
Rejection
When the ballast retained on 65 mm sieve > 10 %.
When the ballast retained on 40 mm sieve > 70 %.
When the ballast retained on 20 mm sieve < 98%.
When the ballast retained on 40 mm sieve < 40 %.
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
SAIL, JINDAL AND RINL TMT BARS are being supplied and used in bridges, buildings
etc with following frequency of test as per page no.15vol.1 part A Bridges of RVNL Spec.
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
ULTRATECH & AMBUJA OPC 53 grade cement is being supplied and used in bridges,
buildings etc with laboratory test of every week no wise as per page no.21 vol.1 part A
Bridges of RVNL Spec.
VOLUME NO : 1
CLIENT : RAIL VIKAS NIGAM LIMITED
CONSULTANT: AARVEE ASSOCIATES
CONTRACTOR: JMC-KPTL-EESPL (JV)
ULTRATECH & AMBUJA PPC is being supplied and used in bridges, buildings etc with
laboratory test of every week no wise as per page no.21 vol.1 part A Bridges of RVNL Spec.
The minimum frequency of sampling of concrete cubes of each grade as per cl.no.15.3 of
RVNL Specification
Quantity of concrete No. of samples
in work, m3
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional sample for each additional 50 m3 or part
thereof
Minimum Cube Compressive Strength required at 28 Days as per cl.no.16.1 RVNL Specification.
Grade of The mean of the group of test result any Any individual test result
Concrete consecutive 4
M15 18 N/mm2 12 N/mm2
The minimum frequency of sampling of concrete cubes of each grade as per cl.no.15.3 of
RVNL Specification
Quantity of concrete No. of samples
in work, m3
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional sample for each additional 50 m3 or part
thereof
Minimum Cube Compressive Strength required at 28 Days as per cl.no.16.1 RVNL Specification.
Grade of The mean of the group of test result any Any individual test result
Concrete consecutive 4
M15 18 N/mm2 12 N/mm2
The minimum frequency of sampling of concrete cubes of each grade as per cl.no.15.3 of
RVNL Specification
Quantity of concrete No. of samples
in work, m3
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional sample for each additional 50 m3 or part
thereof
Minimum Cube Compressive Strength required at 28 Days as per cl.no.16.1 RVNL Specification.
Grade of The mean of the group of test result any Any individual test result
Concrete consecutive 4
M15 18 N/mm2 12 N/mm2
The minimum frequency of sampling of concrete cubes of each grade as per cl.no.15.3 of
RVNL Specification
Quantity of concrete No. of samples
in work, m3
1-5 1
6-15 2
16-30 3
31-50 4
51 and above 4 plus one additional sample for each additional 50 m3 or part
thereof
Minimum Cube Compressive Strength required at 28 Days as per cl.no.16.1 RVNL Specification.
Grade of The mean of the group of test result any Any individual test result
Concrete consecutive 4
M15 18 N/mm2 12 N/mm2