Joint Program Executive Office

Joint Tactical Radio System

MIDS Program Update

6 May 09
CAPT Scott Krambeck
MIDS Program Manager

JPEO JTRS
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
MIDS Program Office
Program Manager
CAPT Krambeck

Deputy
MIDS IPO DPM
Program Manager
CDR Precetti
Ms. Kim

MIDS JTRS
MIDS LVT Division Director FMS
Division Director Division Director

Core Terminal
Acquisition (-1) Case Manager
w/Link-16

Link-16
CM/DM (-2) Case Manager
Waveform

Engineering (-3) JAN-TE Build Case Manager

Logistics (-4)

3rd Party Sales(-5)

MIDS International Program Office


MIDS JTRS MIDS FMS

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


Link-16 Enterprise

JTIDS MIDS-LVT MIDS JTRS

IP Airborne
Networking
LINK-16 &
MIDS-LVT
JTRS Link-16
JTIDS
Enhancements Enhancements Waveform

Link-16
Standardization
JSF
AMF

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT
MIDS Participants Platforms FMS and Third
Parties
FRANCE RAFALE, MIRAGE 2000, A4OOM, GROUND C2 UK
(SCCOA, ACCS, MCT, MIDS-TERRE, Switzerland
MARTHA), FREGATE HORIZON, TCD NG, Belgium
COUGAR RESCO Netherlands
Norway
Denmark
GERMANY EF2000, A400M Australia
ACCS PLATFORMS Japan
FREGATTE F-123 Taiwan
Finland
NATO AGS
ITALY EF2000 NACMA ACCS
GROUND C2 (AIR FORCE & ARMY, ACCS) Australia RAN
TORNADO FBX/SEAD, AMX Singapore
FREGATE HORIZON Greece
Canada
Saudi Arabia
SPAIN EF2000, A400M Turkey
FRAGATA F-100 Thailand
EF-18 S. Korea
ACCS PLATFORMS (AIR FORCE)

U.S. F/A-18, EA-6B, MIDS ON SHIP,


PATRIOT, SHORAD, THAAD, JLENS, MEADS
ABL, F-16, F-15, B-2

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT Variants
MIDS-LVT(1)  Open and Modular Design
 SEM-E Cards/VME Bus
Also variants (4,5,6,7,8,9,10)  TADIL J/IJMS
without Voice/TACAN or for  3810/1553/Ethernet/X.25 Interfaces
MIDS on Ship  Voice and TACAN
 200 Watt Transmitter

MIDS-LVT(2)  Full MIDS-LVT Commonality


 ADDSI X.25 Interface
 Voice/TACAN/1 R-S/Mux Cards
Also variant (11) with
Voice Removed
 Unique Blower and PS Added
 200 Watt Transmitter

MIDS-LVT(3)
 FDL MIL-STD 1553 Interface
 MIDS-LVT Commonality
 No Voice or TACAN Cards
 50 Watt Transmitter

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT Contracting
MIDS International *DLS = LLC of BAE Systems & Rockwell Collins
Program Office **EuroMIDS: MIDS European Nations’ Industry
Thales (FR), EADS (GE), SELEX (IT), INDRA (SP)

*
ViaSat DLS EuroMIDS** BAE MIDS IPO
Production SE&I Functional Baseline (FBL)
Functions the system must perform
Allocated Baseline (ABL)
Functions allocated to components

Contractor Product Baseline


Components improvement Configuration Control Board (CCB)
MIDS 5 Nation Approval
Manages FBL & ABL
Requirements Authorizes Software Block Cycle
& Hardware Block Upgrades
Competitive Directed Software
User Requirements
Production Source Deliveries Interface Control Working Groups
Problem Report Review Boards
Technical Working Groups
MIDS International Review Board
Internet Accessible Tools:
Problem Tracking Database
Configuration Management System

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


Affordability of MIDS LVT
• Continuous Competition
– IDIQ contracts (FY00-FY09) with Data Link Solutions (DLS) & ViaSat
– Terminal requirements are consolidated and competed annually
• Three qualified MIDS LVT vendors
– DLS, ViaSat, EuroMIDS
$665
112 EMD

$581
$581 101 301 599 1037 1515 2059 2770 3197 3532

Cumulative Total
$565
70 MIDS-LVT(1)
11 MIDS-LVT(2)
20 Spares
Competitive Production

$465
$426
FY08 $K

135 MIDS-LVT(1) 207 MIDS-LVT(1) 253 MIDS-LVT(1) 260 MIDS-LVT(1) 271 MIDS-LVT(1) 279 MIDS-LVT(1) 269 MIDS-LVT(1) 103 MIDS-LVT(1)
27 MIDS-LVT(2) 13 MIDS-LVT(2) 25 MIDS-LVT(2) 30 MIDS-LVT(2) 119 MIDS-LVT(2) 96 MIDS-LVT(2) 90 MIDS-LVT(2) 150 MIDS-LVT(2)
32 Spares 50 Spares 46 Spares 45 Spares 8 Spares 4 Spares 10 Spares 20 Spares
Directed 6 FMS 28 FMS 114 FMS 143 FMS 146 FMS 332 FMS 58 FMS 62 FMS
50/50 Split
$365
$322
$297
$265
$265
$239
$220
$190
$179 $181
$165
FY98 EMD FY00 LRIP I FY01 LRIP II FY02 LRIP III FY03 FRP I / FY04 FRP II FY05 FRP III FY06 FRP IV FY07 FRP V FY08 FRP VI
Lot 1 Lot 2 Lot 3 LRIP IV Lot 5 Lot 6 Lot 7 Lot 8 Lot 9
Lot 4

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT Enhancements

• Mandates
– Frequency Remapping (FR)
– Information Assurance Modernization (IAM)
• U.S. and European Interest
– Enhanced Throughput (ET)
– Concurrent Multi-Netting (CMN) - Prototyping
– Extended 1553 (E1553) - Prototyping

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT Enhancements
Considerations
• Terminal Modification effort — Not a change to Link-16
– Proposed enhancements do not affect Link-16
• This effort is like upgrading a 5-10 year-old computer
– There should be a logical break point – Block Upgrade 2?
– MIDS new terminal cost is <$200k — Buy new … or Retrofit?
– ROI? How many platforms will buy upgraded SRUs?
• ~5500 MIDS-LVT orders

• MIDS IPO position is to minimize # of modified SRUs


– SMP & GMUX SRU Upgrade - FR and IAM
– ET, CMN, E1553 – Require additional SRU Upgrades

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT (1)
• Open and Modular Design
• VME Bus
• TADIL J/IJMS
• 1553/Ethernet/X.25 Interfaces
• Voice and TACAN
Preamp/Driver
Control

Inverter
Finals

Exciter / IPF

RCVR / Synth

RCVR / Synth
TACAN

RTI

DP

TP
SMP

Voice
Discretes

Muxes

X.25 Mux

TP/GMUX
DP/AMUX
SMP/IA

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS JTRS

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS JTRS Migration Objectives

P3I

MIDS-LVT MIDS JTRS


1. Single Channel non-JTRS compliant radio 1. 4 Channel JTRS compliant radio
 1 Channel for Link-16, J-Voice, and TACAN  1 Channel for Link-16, J-Voice, and TACAN
 No programmable channels  3 programmable channels (JTRS waveforms)
2. Successful cross warfighting domain product 2. Cross warfighting domain
 Aircraft, ships, and ground  Aircraft, ships, and ground
3. Proven affordability via continuous competition 3. Planned affordability via continuous competition
 ViaSat, DLS, & EUROMIDS  ViaSat & DLS
4. Cornerstone of tactical interoperability 4. Capability to host additional airborne networking
 Joint & Coalition  Joint & Coalition
5. Crypto Modification needed 5. Crypto Modification ready
6. Frequency Remap under development 6. Frequency Remapping included
7. Does not Include Link-16 Enhanced Throughput 7. Link-16 Enhanced Throughput included

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


MIDS-LVT to MIDS JTRS
MIDS Form Fit Replacement to Minimize Platform Integration Impact

MIDS On Ship
AN/URC-141(C)
LVT A/C Installation Radio Set

• New Construction
Ships
MIDS
Terminal RPS

MIDS

MIDS
• Army Air Defense

ARC-210 ARC-210

MIDS LVT2 with self-


contained power & cooling

Statement A: Approved for public release, distribution is unlimited (5 May 2009)


Acquisition Strategy
*DLS = LLC of BAE Systems
MIDS IPO & Rockwell Collins
Jointly developed:
subcontracts subcontracts Functional Baseline
ViaSat DLS Allocated Baseline
Product Baseline
IPT Design for Common
Product Baseline

TDP
subcontracts subcontracts
ViaSat DLS

10 Terminals 10 Terminals
FAQT FAQT First Article Approval
Pass Contractor FAQT
Pass Government FAQT
IA Certification
Competitive Competitive EMC Features Certification
Air Worthiness Certification
Production Production SCA Certification

COOPETITION
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
Core Terminal Accomplishments
• Core Terminal Development
– 20 MIDS JTRS EDMs built undergoing First Article Qualification test (FAQT)
– Delivered four (4) Airworthiness Terminals to F/A-18 lead platform
– Conducted 15 flight tests on F/A-18 platform
• MIDS JTRS Certification
– Security Verification 97 % completed
• Acquisition Documentation
– CPD, TEMP, SEP, PPP, PESHE, MER, ISP - Approved
– IAS, DDL, PPP, SCG, NTSP, RMP, CDMP - Approved
– ILA completed with Green Rating
– Final TRA Report submitted to DDR&E for approval
– MS C planned for Summer 2009
• Production Transition Terminal contract awarded in April 2007
– First terminals off production line were available in September 2008
• MIDS JTRS Demonstration conducted at December 2007 BoD
– Demonstrated multi-channel (Link-16, TACAN and SINCGARS) operation
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
Summary & Way Ahead
• Final Development & Qualification
– Completed final Integrated Builds and resolving remaining Problem Reports
– Security Verification test 97% complete
– JTel SCA Certification is on-going
– Completion of FAQT planned by Summer 2009
• Continue Platform Testing
– 15 F/A-18 DT Flights conducted to date
– Conduct OTRR in Late Summer/Early Fall 2009
– Achieve IOC by February 2010
• Deliver fully qualified core terminals to F/A-18, Rivet Joint & JSTARS
– AWT terminals are being used to perform DT on F/A-18
– T&E terminals already delivered to Rivet Joint & JSTARS
– Supporting flight tests & integration activities
• JAN-TE effort on hold pending AT&L approval of second waveform
Statement A: Approved for public release, distribution is unlimited (5 May 2009) 16
Questions?