Professional Documents
Culture Documents
0905JPEO JTRS MIDS C4ISR 2009 18pages
0905JPEO JTRS MIDS C4ISR 2009 18pages
6 May 09
CAPT Scott Krambeck
MIDS Program Manager
JPEO JTRS
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
MIDS Program Office
Program Manager
CAPT Krambeck
Deputy
MIDS IPO DPM
Program Manager
CDR Precetti
Ms. Kim
MIDS JTRS
MIDS LVT Division Director FMS
Division Director Division Director
Core Terminal
Acquisition (-1) Case Manager
w/Link-16
Link-16
CM/DM (-2) Case Manager
Waveform
Logistics (-4)
IP Airborne
Networking
LINK-16 &
MIDS-LVT
JTRS Link-16
JTIDS
Enhancements Enhancements Waveform
Link-16
Standardization
JSF
AMF
MIDS-LVT(3)
FDL MIL-STD 1553 Interface
MIDS-LVT Commonality
No Voice or TACAN Cards
50 Watt Transmitter
*
ViaSat DLS EuroMIDS** BAE MIDS IPO
Production SE&I Functional Baseline (FBL)
Functions the system must perform
Allocated Baseline (ABL)
Functions allocated to components
$581
$581 101 301 599 1037 1515 2059 2770 3197 3532
Cumulative Total
$565
70 MIDS-LVT(1)
11 MIDS-LVT(2)
20 Spares
Competitive Production
$465
$426
FY08 $K
135 MIDS-LVT(1) 207 MIDS-LVT(1) 253 MIDS-LVT(1) 260 MIDS-LVT(1) 271 MIDS-LVT(1) 279 MIDS-LVT(1) 269 MIDS-LVT(1) 103 MIDS-LVT(1)
27 MIDS-LVT(2) 13 MIDS-LVT(2) 25 MIDS-LVT(2) 30 MIDS-LVT(2) 119 MIDS-LVT(2) 96 MIDS-LVT(2) 90 MIDS-LVT(2) 150 MIDS-LVT(2)
32 Spares 50 Spares 46 Spares 45 Spares 8 Spares 4 Spares 10 Spares 20 Spares
Directed 6 FMS 28 FMS 114 FMS 143 FMS 146 FMS 332 FMS 58 FMS 62 FMS
50/50 Split
$365
$322
$297
$265
$265
$239
$220
$190
$179 $181
$165
FY98 EMD FY00 LRIP I FY01 LRIP II FY02 LRIP III FY03 FRP I / FY04 FRP II FY05 FRP III FY06 FRP IV FY07 FRP V FY08 FRP VI
Lot 1 Lot 2 Lot 3 LRIP IV Lot 5 Lot 6 Lot 7 Lot 8 Lot 9
Lot 4
• Mandates
– Frequency Remapping (FR)
– Information Assurance Modernization (IAM)
• U.S. and European Interest
– Enhanced Throughput (ET)
– Concurrent Multi-Netting (CMN) - Prototyping
– Extended 1553 (E1553) - Prototyping
Inverter
Finals
Exciter / IPF
RCVR / Synth
RCVR / Synth
TACAN
RTI
DP
TP
SMP
Voice
Discretes
Muxes
X.25 Mux
TP/GMUX
DP/AMUX
SMP/IA
P3I
MIDS On Ship
AN/URC-141(C)
LVT A/C Installation Radio Set
• New Construction
Ships
MIDS
Terminal RPS
MIDS
MIDS
• Army Air Defense
ARC-210 ARC-210
TDP
subcontracts subcontracts
ViaSat DLS
10 Terminals 10 Terminals
FAQT FAQT First Article Approval
Pass Contractor FAQT
Pass Government FAQT
IA Certification
Competitive Competitive EMC Features Certification
Air Worthiness Certification
Production Production SCA Certification
COOPETITION
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
Core Terminal Accomplishments
• Core Terminal Development
– 20 MIDS JTRS EDMs built undergoing First Article Qualification test (FAQT)
– Delivered four (4) Airworthiness Terminals to F/A-18 lead platform
– Conducted 15 flight tests on F/A-18 platform
• MIDS JTRS Certification
– Security Verification 97 % completed
• Acquisition Documentation
– CPD, TEMP, SEP, PPP, PESHE, MER, ISP - Approved
– IAS, DDL, PPP, SCG, NTSP, RMP, CDMP - Approved
– ILA completed with Green Rating
– Final TRA Report submitted to DDR&E for approval
– MS C planned for Summer 2009
• Production Transition Terminal contract awarded in April 2007
– First terminals off production line were available in September 2008
• MIDS JTRS Demonstration conducted at December 2007 BoD
– Demonstrated multi-channel (Link-16, TACAN and SINCGARS) operation
Statement A: Approved for public release, distribution is unlimited (5 May 2009)
Summary & Way Ahead
• Final Development & Qualification
– Completed final Integrated Builds and resolving remaining Problem Reports
– Security Verification test 97% complete
– JTel SCA Certification is on-going
– Completion of FAQT planned by Summer 2009
• Continue Platform Testing
– 15 F/A-18 DT Flights conducted to date
– Conduct OTRR in Late Summer/Early Fall 2009
– Achieve IOC by February 2010
• Deliver fully qualified core terminals to F/A-18, Rivet Joint & JSTARS
– AWT terminals are being used to perform DT on F/A-18
– T&E terminals already delivered to Rivet Joint & JSTARS
– Supporting flight tests & integration activities
• JAN-TE effort on hold pending AT&L approval of second waveform
Statement A: Approved for public release, distribution is unlimited (5 May 2009) 16
Questions?