Professional Documents
Culture Documents
1 (2) - Pdfplot14.hdi 14.00.072.000 - 002953
1 (2) - Pdfplot14.hdi 14.00.072.000 - 002953
00m
0.15m 0.15m 0.15m
0.90m 1.65m
INLET 3.00m
4"Ø PVC
0.15m 1.02m 0.15m 1.52m 0.15m
0.60m 0.60m
10mmØ TEMP. BARS
10mmØ TEMP. BARS SPCD @ 0.15m oc
CO MANHOLE CO MANHOLE
OUTLET CO SPCD @ 0.15m oc
CO 0.12m
10mmØ VERT. BARS
1.03m 10mmØ BARS SPCD @ 0.60 moc
4"Ø PVC INLET AIR SPACE
4"Ø PVC
150mm THK CHB
MANHOLE
OUTLET
0.60 0.60
1
0.40 4"x1"
FLAT BAR
STEEL COVER
N.G.L
OUTLET
INLET
use: 4" Ø PVCPIPE
0.60
0.40
PLAN SECTION
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
FD
WC
V
LA
WC V
FD LA
V
LA
FD
WC
V
LA
WC
FD
KS
IPE FD
U EP WC
BL V
Ø LA
mm WC
20 FD V
LA
CE
UR
SO
IN
MA
OM
FR
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
R
VT
R
VT
R
VT
CB
R
VT 4"Ø
FD PV
IPE
CP
IPE V
P LA
WC
P VC
S V1 4"Ø VT
R CO
FD
R WC
VT
AV
IPE L
CB WC V C
P
PV
4"Ø FD LA 4"Ø
PV
E CP
PIP IPE
P VC CO
4"Ø
CB
R
VT
4"
4"Ø Ø PV
E PV C
PI
C PIP C
PIP PE
PV E LA
V
4"Ø FD
WC
V
LA
WC
FD
CO
R CB
VT
CB VT
R IPE
CP
PV
4"Ø
IPE
CP
PV
4"Ø
CB
E KS
PIP PE
C PI
PVPVC
4"6Ø"Ø CB
KS
2 TR
SV 4"VØ
CB PV FD
E R C WC
PIP
SEW 4"Ø E LA
V
BLIC E
PV
CP FD WC
PU PIP IPE LA
V
TO PV
C E
PIP
4"Ø VC CO
P
4"Ø
R
WE
SE
IC
BL
PU
TO
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
FD
KS FD FD
WC WC
LAV
LAV
WC
LAV
FD FD
WC WC
LAV LAV
FD
LAV
WC
WC
LAV
FD
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
CB
SV1
4"Ø PVC PIPE
SV2
KS
TO PUBLIC SEWER
4"Ø PVC PIPE 4"Ø PVC PIPE 4"Ø PVC PIPE 4"Ø PVC PIPE 4"Ø PVC PIPE
CB CB CB CB CB CB
VTR VTR VTR VTR VTR
4"Ø PVC PIPE
LAV
FD FD
WC WC
CO
LAV LAV
FD
CO
LAV
WC
WC
LAV
FD
CO
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
THE CONTRACTOR SHALL VERIFY ALL EXISTING UTILITIES AT SITE AND COORDINATE
KS
HB
KITCHEN SINK
DS DOWN SPOUT
PLUMBING FIXTURES: USE SANIWARES OR EQUIVALENT.
VTR VENT THRU ROOF
KITCHEN SINK: USE DOUBLE WELL STAINLESS STEEL. USE 100 x 100 mm BRASS
4 SV SEPTIC VAULT
OR STAINLESS STEEL FLOOR DRAIN.
GV GATE VALVE
CV CHECK VALVE
USE MOLDEX OR EQUIVALENT FOR ALL SANITARY PIPES AND USE 20mm DIA.
5 M WATER METER
(3/4) AND 12.7mm (1/2in) DIA. UPVC BLUE PIPE FOR WATER SUPPLY.
SEWAGE PIPE
COLD WATER
VICINITY MAP
ALL SLOPES FOR HORIZONTAL DRAINAGE SHALL MAINTAIN 1%
UNLESS OTHERWISE SPECIFIED. USE 160MM DIA.
6 PVC DRAINAGE PIPE, 100mm DIA PVC FOR MAIN SEWER PIPE
AND 50mm DIA. PVC FOR WASTE AND VENT STACK PIPE.
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
1-10mmØ TB
0.15
1-10mmØ BB
0.30 10mmØ TIES SECTION
SPCD @ 0.15M OC
RAFTER & GIRT SPOT DETAIL
LINTEL BEAM 1 DETAIL
SCALE 1:20m FASCIA FRAME DETAIL SCALE=1:20M
SCALE 1:20
0.20 0.20
10mmØ TIES SPCD @ 1-0.50m, 10mmØ TIES SPCD @ 1-0.50m, 0.20
6-0.10m, REST-0.175m oc 6-0.10m, REST-0.175m oc 10mmØ TIES SPCD @ 1-0.50m,
6-0.10m, REST-0.175m oc
5-16mmØ DSB 2-16mmØ DSB 5-16mmØ DSB 2-16mmØ DSB 2-16mmØ DSB 2-16mmØ DSB 3-16mmØ DSB 2-16mmØ DSB 3-16mmØ DSB
0.30
0.30
0.40
2-16mmØ DSB 2-16mmØ DSB 2-16mmØ DSB 2-16mmØ DSB 3-16mmØ DSB 2-16mmØ DSB
2-16mmØ DSB 3-16mmØ DSB 2-16mmØ DSB RIGHT
LEFT @MIDSPAN LEFT RIGHT
@SUPPORT @SUPPORT @MIDSPAN @SUPPORT
LEFT @MIDSPAN RIGHT @SUPPORT
@SUPPORT @SUPPORT
RB2 DETAIL RB3 DETAIL
RB1 DETAIL SCALE 1:20m SCALE 1:20m
SCALE 1:20m
L1 L2
L1/4 L1/4 L2/4
2D 2D 2D
BEAM ELEVATION
SCALE 1:30m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
15"
12.15
2"
0.40mm THK BENDED FASCIA
1"
1 1.50
2"
1"
1"
FASCIA DETAIL
NTS
5.00 5.00
RAFTER 1 DETAIL
SCALE 1:40m
0.50
0.40
2.00 1.00
1.00 6.70 1.00
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
0.30
VERTICAL BARS
FFL
Ø10 VERT. BARS
0.30
C1 PLAN NGL @ 400 MM O.C.
Ø10 HOR. BARS
NGL @ EVERY 3RD COURSE
100MM THK.
CHB WALL
FINISH FLOOR LINE
0.60
4-16mmØ VERTICAL BARS Ø12 @ 250 MM O.C.
10mmØ TIES SPCD Ø10 @ 250 MM O.C.
0.60
0.30
@ 4-0.05m, 6-0.10m,
3-Ø12 BARS
0.15
GRADE LINE THE REST @ 0.15m OC 2-Ø10 BARS
0.20
100MM THK. 100MM THK.
WELL-COMPACTED WELL-COMPACTED
GRAVEL BASE GRAVEL BASE
1.00
0.30
0.40
WF2 DETAIL
0.30
SCALE 1:20m
SECTION
1.00
0.35 0.30 0.35 0.30
10mmØ BARS
@ 0.30m OC
0.16
2 21"Ø G.I. PIPE
0.35
GRADE LN
6-10mmØ BARS
0.30
1.00
EQUAL SPACED
0.80 0.90
0.25
0.35
0.80
F1 PLAN
0.10 RAILING DETAIL
C1/F1 DETAIL TYP. STEP DETAIL SCALE 1:50m
SCALE=1:20m
SCALE 1:25m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
63.20 1.00
1.00
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1
5.00
RB1
RB1
RB1
RB1
RB1
RB1
RB1
10.00
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RB1
RB1
RB1
RB1
RB1
RB1
RB1
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RB2
RB2
RB2
RB2
RB2
RB2
RB2
2.00
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1
1.00
7.00 8.00 4.00 9.00 4.00 1.00
(right)
ROOF FRAMING PLAN
SCALE 1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
1.00 63.20
20.00 11.20
1.00 5.00 1.00
1.00
RB3
6
RB3
2.20
2.20
RB3
GIRT 1
5
6.70
RB3
RB3
4.50
4.50
1.00
RB1
RB1
RB1
RB1
10.00
3
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
RAFTER 1
5.00
RB1
RB1
RB1
RB1
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1
2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RAFTER 2
RB2
RB2
RB2
RB2
RB2
RB2
2.00
1
RB1 RB1 RB1 RB1 RB1 RB1 RB1 RB1
1.00
(right)
ROOF FRAMING PLAN 4.20 7.00
SCALE 1:110m 20.00 11.20
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
63.20
WF1
WF1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
WF1
3.00
WF1
WF1 WF1
5.00
WF1
WF1
WF1
WF1
WF1
WF1
WF1 WF1
WF1
WF1
WF1 WF1 WF1
WF1
F-1 F-1 F-1 F-1 F-1 F-1 F-1
7.00
WF1
WF1
WF1
WF1
WF1
WF1
WF1
WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
WF2
2.00
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
2.00
(right)
FOUNDATION PLAN
SCALE 1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
20.00 11.20
2.70 5.00 3.50
WF1
6
C-1 C-1
WF1
WF1
2.20
2.20
F-1 F-1
C-1 C-1
F-1 F-1
6.70
4.50
4.50
WF1
WF1
WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1
4
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
WF1 WF1
WF2
5.00
WF1
WF1
WF1
C-1 C-1
WF1
F-1 F-1
WF1
WF1
WF1
10.00
3
WF2
SLAB ON FILL
ELEV.±0.30m
C-1 C-1 C-1 C-1 C-1
F-1 0.10m THK SLAB ON FILL F-1 F-1 F-1 F-1
10mmØ DSB TEMP. BARS
SPCD @ 0.40moc
WF1
5.00
WF1
WF1
WF1
WF1
WF2
2
WF1 WF1 WF1 WF1 WF1 WF1 WF1 WF1
C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1 C-1
WF2
2.00
F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1 F-1
(left)
FOUNDATION PLAN 20.00
1.20 3.00
11.20
7.00
SCALE 1:110m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
1.60 F F
2.10 2.10 2.10 2.10 2.10
0.90 0.90
1.30 F F F F
1.60 F F F
2.10 2.10 2.10 2.10
1.20 1.20
0.80
0.50
W1 W2 W3 W4
FIXED GLASS WINDOW FIXED GLASS WINDOW SLIDING GLASS WINDOW FIXED GLASS WINDOW
6mm THK FIXED CLEAR GLASS ON 6mm THK CLEAR GLASS ON ALUMINUM 6mm THK CLEAR GLASS ON ALUMINUM 6mm THK CLEAR GLASS ON ALUMINUM
ALUMINUM FRAMING COMPLETE W/ FRAMING COMPLETE W/ HARDWARE & FRAMING COMPLETE W/ HARDWARE & FRAMING COMPLETE W/ HARDWARE &
HARDWARE & ACCESSORIES. ACCESSORIES. ACCESSORIES. ACCESSORIES.
SET/S: 8 SETS SET/S: 2 SETS SET/S: 14 SET/S SET/S: 1 SET/S
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
1.00
6.70
1.00
ROOF PLAN
SCALE 1:200m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
EARTH FILL
(left)
LONGITUDINAL SECTION
SCALE 1:100m
RECEPTION
EARTH FILL
(right)
LONGITUDINAL SECTION
SCALE 1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
BAR ROOM
F F F F F F F F
CORRIDOR CORRIDOR
CROSS
SCALE 1:100m
SECTION 1 CROSS SECTION 2
SCALE 1:100m
4.25 1.95
1.42 1.42 1.42 0.98 0.98
2.10 2.10
RECEPTION
0.80 0.80
CORRIDOR
FFL
EARTH FILL
GRILL (G1) GRILL 2 (G2)
2" HOLE MESH WIRE WELDED ON 2" HOLE MESH WIRE WELDED ON
1 21"X1 21" ANGLE BAR FRAMING 1 21"X1 21" ANGLE BAR FRAMING
CROSS
SCALE 1:100m
SECTION 3 SET/S: 2 SETS SET/S: SET/S
SCHEDULE GRILLS
SCALE=1:50m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
REAR ELEVATION
SCALE 1:100m
J I H G F E D C B A
REAR ELEVATION
SCALE 1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
1.50
0.50
TOP OF ROOF BEAM 1
3.00
6 5 4 3 2 1
2.20 4.50 5.00 5.00 2.00
F F F F F F F F
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
FRONT ELEVATION
SCALE 1:100m
I J K L M N O P Q
FRONT ELEVATION
SCALE 1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
2 3
W3 W3 W3 W3 W3 W3 W3
D4
2.00
3.00
T&B JACUZZI
D5 D5
STOCK ROOM
HR
D4 D4 D4
TOILET TOILET
1.55 4.44
2.00
D4
D5
RECEPTION
2.85
7.00
TOILET MASTER BEDROOM
TOILET
CBM W3
OFFICE
D4
D3 D3
W3 W3 W3 D2 W3 W3
2.00
C O R R I D O R
2.00
7.00 8.00 4.00 9.00 4.00
FLOOR PLAN(right)
SCALE=1:100m
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
2.20
D4
G2
COMMERCIAL
KITCHEN
6.70
4.50
G1
G1
1.20 1.10 1.20
W1 W1 W1 W1 W1 W4
D4
D4 D4
D4
W2
1.80
3.00
D5 D5
1.20
D4
10.00
5.00
W2 STORAGE
STEP-UP
D4
W1 D1 W1 D1 W1 W3 W3
2.00
C O R R I D O R
(left)
FLOOR PLAN 1.20 3.00 7.00
SCALE=1:100m 20.00 11.20
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE:
Building Official
PERSPECTIVE ARCHITECTURAL
GRAD. S
CHL. BLD
G. STRUCTURAL
THE
STRUCTURE
SANITARY
STAGE THE
SITE
.C
BUILDG
ELECTRICAL
MECHANICAL
VICINITY MAP
SITE DEVELOPMENT PLAN
SCALE: NTS
ELECTRONICS &
COMMUNICATION
PREPARED BY THE OFFICE OF: CERTIFIED BY: PROJECT TITLE: APPROVED BY: CHECKED BY: SHEET NO.
PROPOSED: DATE: