Date Test Description

Insertion Test

12/24/2021

Retention Test

12/24/2021
Torque Test
12/24/2021

Impact Resistance
12/24/2021

Remarks:
Part Payment Term: 100% upon completion
Test Requirement
Use a testing machine speed of 50 millimeters per minute at 25 ± 3°C, unless otherwise
specified, and measure the force required to engage and / or disengage each connection
system.
Insertion force: Shall be 6kgf or smaller.

Use a testing machine speed of 50 millimeters per minute at 25 ± 3°C, unless otherwise
specified, and measure the force required to engage and / or disengage each connection
system.
Seperation force: shall be 11kgf or larger
There shall be no crack,or damage occured at a strength lower than the connecting strength
1.2kgf.

Part shall be allowed to fall on a concrete floor from a distance of 1M,on each plane of the
specimen (six planes). Part shall critically checked after every fall.

upon completion
Test Estimated Cost

RM4,000

RM4,000

RM4,000

RM4,000