Professional Documents
Culture Documents
11102021MHK Comp Spe Ep Cor 0354 (Eng)
11102021MHK Comp Spe Ep Cor 0354 (Eng)
11102021MHK Comp Spe Ep Cor 0354 (Eng)
It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
CORROSION
Revision No – 1
SPECIFICATION
REVISION LOG
TABLE OF CONTENTS
I. SCOPE ........................................................................................................................... 6
II. REFERENCE DOCUMENTS ......................................................................................... 6
A. CORPORATE REFERENCES ................................................................................ 6
B. INTERNAL REFERENCES ..................................................................................... 6
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
C. EXTERNAL REFERENCES.................................................................................... 6
III. DEFINITIONS................................................................................................................. 7
IV. SURFACES TO BE PAINTED ....................................................................................... 8
A. ITEMS NOT TO BE PAINTED ................................................................................ 8
B. CASE OF STAINLESS STEELS ............................................................................. 8
C. PAINTING OF FASTENERS................................................................................... 8
D. PAINTING UNDER PERSONAL PROTECTION (PERFORATED
GUARDS/SHEETS) ................................................................................................ 8
V. PAINTING SYSTEMS .................................................................................................... 9
A. APPROVED SYSTEMS .......................................................................................... 9
B. SUBSTITUTION RULE ........................................................................................... 9
C. COLOUR CODING ................................................................................................. 9
VI. CERTIFICATION OF PERSONNEL............................................................................... 9
A. OPERATORS ......................................................................................................... 9
B. INSPECTORS ........................................................................................................ 9
VII. QUALIFICATION OF THE APPLICATION PROCEDURES .......................................... 9
A. APPLICATION PROCEDURE ................................................................................ 9
B. APPLICATION PROCEDURES TESTS................................................................ 10
VIII. KICK OFF MEETING ................................................................................................... 10
IX. TECHNICAL CONTENT OF TENDERS ...................................................................... 11
X. SURFACE PREPARATION ......................................................................................... 11
A. DESIGN AND PREPARATION BEFORE BLASTING OF SURFACES TO BE
PAINTED .............................................................................................................. 11
B. QUALITY OF ABRASIVES ................................................................................... 12
C. BLAST CLEANING ............................................................................................... 12
D. SURFACE PREPARATION OF GALVANIZED STEEL ........................................ 12
E. SURFACE PREPARATION OF FASTENERS ...................................................... 13
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :5 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
A. CHECKS ............................................................................................................... 15
B. INSPECTION TEST PLAN.................................................................................... 15
C. COMPANY INSPECTION ..................................................................................... 15
D. PROVISIONAL ACCEPTANCE ............................................................................ 15
E. GUARANTEE ....................................................................................................... 15
F. INSPECTION AT END OF GUARANTEE PERIOD .............................................. 16
XIII. TECHNICAL FILE ........................................................................................................ 16
XIV. APPENDIX ................................................................................................................... 17
A. APPENDIX I: SUMMARY OF TESTS AND INSPECTIONS.................................. 17
B. APPENDIX II: LIST OF SYSTEMS ....................................................................... 19
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :6 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
I. SCOPE
This standard specification defines the technical requirements for the execution of coating
operations for the high durability external corrosion protection (as defined in ISO 12944-1) of on
shore structures and equipment, which are not located within coastal areas. For equipments
and structure located within coastal areas, MHK-COMP-SPE-EP-COR-0350 shall be used.
A. CORPORATE REFERENCES
Document Document Number
Document Title
Type PHM No. Prev. No.
N/A
B. INTERNAL REFERENCES
Unless otherwise stipulated, the applicable version of these documents, including relevant
appendices and supplements, is the latest revision published in the applicable yearly
collection.
Document Document Number
Document Title
Type PHM No. Prev. No.
SPE MHK-COMP-SPE- Corrosion control on production
EP-COR-0001 facilities: Design and construction
SPE MHK-COMP-SPE- External protection of offshore and
EP-COR-0350 coastal structures and equipment by
painting
SPE MHK-COMP-SPE- External protection of piping and
EP-COR-0355 equipment by thermal spray coating
SPE MHK-COMP-SPE- Corrosion Protection of Fasteners
EP-COR-0356
C. EXTERNAL REFERENCES
Unless otherwise stipulated, the applicable version of these documents, including relevant
appendices and supplements, is the latest revision published at the effective date of this
document.
Document Type Document Number Document Title
ASTM A380 Standard Practice for Cleaning, Descaling, and
Passivation of Stainless Steel Parts,
Equipment, and Systems
ASTM D4285 Standard Test Method for Indicating Oil or
Water in Compressed Air
ASTM D4752 Standard Practice for Measuring MEK
Resistance of Ethyl Silicate (Inorganic) Zinc-
Rich Primers by Solvent Rub
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :7 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
III. DEFINITIONS
Term Definition
N/A
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :8 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
Plastic and plastic coated materials, provided their resistance to UV has been
demonstrated, and colour coding is not necessary
Non ferrous materials such as 90-10 and 70-30 copper nickel alloys, monel, aluminium
bronze, and nickel alloys when not thermally insulated
Machined surfaces
Stainless steel instrument tubing.
C. PAINTING OF FASTENERS
Fasteners (bolts and nuts) shall be painted according MHK-COMP-SPE-EP-COR-0356.
V. PAINTING SYSTEMS
A. APPROVED SYSTEMS
The list and application area of all painting systems are given APPENDIX II: LIST OF
SYSTEMS.
For structures and equipments in areas classified as corrosivity category C5-M/CX the
approved systems shall be selected from the MHK-COMP-SPE-EP-COR-0350 Appendix III.
Corrosivity categories are given in accordance with MHK-COMP-SPE-EP-COR-0001.
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
B. SUBSTITUTION RULE
For any given paint system, a system designed to withstand a high aggressivity can always
be applicable in a lower aggressivity environment.
C. COLOUR CODING
Colour coding shall be according to the schedule defined by the project. Generally, colours
will be chosen to match those of installations already present in the same country.
If the project has no specific requirements, the colour coding shall be according to MHK-
COMP-SPE-EP-COR-0350 Appendix IV.
In any case, the painting works carried out by Contractor shall include all colour coding and
markings required for service identification.
B. INSPECTORS
The Inspectors following day-to-day painting activities shall be individually certified Coating
Inspector level II (FROSIO NS 476, NACE) at the minimum.
The painting checks, inspections, and acceptance shall be approved and validated by
Coating Inspector level III (FROSIO NS 476, NACE).
The application procedude shall follow ISO 12944-8 and will include at the minimum the
following information:
Equipment/structure/piping to be coated
Operating temperature of the equipement
Type of substrate to be coated
Surface preparation
Methods of application and application requirements
Painting cycle
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
Supplier shall provide Contractor with technical assistance. All recommendations made by
Supplier other than these outlined in datasheets or in the present specification shall be supported
by a written statement from the Supplier head office.
X. SURFACE PREPARATION
A. DESIGN AND PREPARATION BEFORE BLASTING OF SURFACES TO BE PAINTED
All structures and equipment shall be designed according to ISO 12944-3 international
standard for high durability painting systems.
All sharp edges shall be rounded (minimum radius > 2 mm).
Preparation grades of welds and other areas with surface imperfections shall be grade P3
according ISO 8501-3.
The design of the item to be painted shall be such that it creates no interstice and
inaccessible area.
All oil or grease shall be removed by washing the item to be treated with appropriate
solvents or any other suitable means before beginning of blast-cleaning operations
according to ISO 12944-4 or SSPC SP1. This includes bolt holes in piping assemblies.
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :12 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
Weld spatter and remains of temporary welds, deposits or surface defects shall be
eliminated by appropriate means; removal by deep grinding is subject to Company approval.
All mating surfaces of equipment subject to outdoor exposure shall be coated with the full
coating system prior to assembly (saddles, skirts, base plates, olted components, flanges,
etc.).
Contractor shall protect all equipment that is not to be painted or may be affected by the
presence of abrasives or paint. Opening in vessels, piping and other appurtenances shall be
properly protected against entry of abrasive material.
Special attention shall be paid to avoid splashes of zinc paint on equipment made of
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
austenitic steels.
B. QUALITY OF ABRASIVES
Abrasives shall be:
Sealed in watertight packaging. Any product delivered in defective packaging shall be
rejected
Stored sheltered from the elements
Dry, clean and Conductivity shall be less than 150.10-6 Siemens/cm as per ASTM D4940
Non-ferrous and chloride-free when used on stainless steel surfaces.
Abrasives containing more than 1% crystalline silica are strictly prohibited.
The use of copper slag or silica sand is strictly prohibited.
C. BLAST CLEANING
All surfaces to be coated shall be blast-cleaned to grade of cleanliness and surface profile
specified for each system in Appendix III of MHK-COMP-SPE-EP-COR-0350.
The air supply for blast cleaning shall be shall be free of oil and water and in accordance
with ASTM D4285.
After blast-cleaning, all dust must be removed using a vacuum cleaner before application of
the paint in order to achieve the maximum dust level 2 (quantity rating 2 max, particle size
class 2 max ) according ISO 8502-3. All blast-cleaned surfaces shall be coated before the
deterioration of the "grade of cleanliness". In any case, any surface that has been blast-
cleaned shall be coated on the same day.
Before painting works commence, checks for the contamination of the surface by salts shall
be carried out (ISO 8502-6 & ISO 8502-9) plus ferrous contamination for stainless steel
surfaces.
For blast cleaning on automatic production line, Contractor shall ensure that the grit selected
can achieve the required surface profile. This requirement includes determination of grit mix,
as well as quantity and frequency of grit renewal.
Stainless steels shall be segregated, carbon steel supports for storage shall be
systematically painted, and lifting equipment shall prevent iron contamination.
Stainless steel surfaces to be coated shall be etched or degreased and blasted.
The blast cleaning procedure shall be submitted to Company for approval.
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :13 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
The Contractor shall take two samples from each batch of products used during the work
and keep them available for Company.
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :15 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
C. APPLICATION CONDITIONS
GENERAL
Paint shall always be applied to surfaces that are dry, clean and degreased, for both
coating on substrate and previous coat.
Painting works shall not proceed if:
Temperature of the substrate is less than 3°C above the dew point
The relative humidity is more than 85% RH (90% RH for inorganic zinc silicates)
The weather is rainy or foggy, except under shelter, and subject to verification of
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
D. REPAIRS
Any defect shall be repaired before the application of further coats. Subject to the agreement
of Company, and after determining the type and size of the defects, the following methods of
repair shall be applied:
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :16 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
by localized blast-cleaning, the edges of the sound coating shall be feathered back
about 50 mm, and the repair system shall be applied.
When open abrasive blasting is not permitted, vacuum blasting machine shall be used
for spot repair.
C. COMPANY INSPECTION
Company Inspector shall have free access to storage areas, workshops, yards where the
works will be performed. Contractor shall also provide Company Inspector with all office
facilities necessary for the execution of his work (telephone, fax, handling equipment,
measuring instruments with valid calibration certificates, etc.).
Upon arrival of Company Inspector on site, Contractor shall supply him with all relevant
documentation regarding the works to be carried out.
D. PROVISIONAL ACCEPTANCE
For provisional acceptance, Company shall check that all inspections set out in APPENDIX I:
Summary of tests and inspections have been carried out and that all results are satisfactory.
E. GUARANTEE
Contractor guarantees that the Work shall be covered by performance warranties in
accordance with the following requirements of the Contract:
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :17 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
XIII.TECHNICAL FILE
Contractor shall hand over a technical file to Company at the end of the works which shall
include:
All inspection reports
Provisional acceptance reports
Guarantee certificates
Insurance certificates for the guarantee.
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :18 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
XIV. APPENDIX
A. APPENDIX I: SUMMARY OF TESTS AND INSPECTIONS
Test description Method Frequency Requirements
Storage of coating
Visual 100% See § XI.A
materials
Shelf life Visual 100% See § XI.A
Compressed air ASTM D4285 Every shift No oil, no humidity
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
Grade P3
Steel and welding
ISO 8501-3 100% of item Rounding of corners, sharp edges
imperfections
to 2 mm radius minimum
ISO 12944-4 or Free of oil and grease or other
Pre-cleaning of surfaces 100% of item
SSPC SP1 contaminants
Surface preparation
Before start
and twice per
shift
Temperature of substrate at
Climatic conditions - When the least 3°C above dew point
ambient
Maximum humidity 85% RH
conditions are
obviously
changing
Conductivity of abrasives ASTM D4940 Every shift < 150.10-6 Siemens/cm
According system sheet in
Grade of cleanliness ISO 8501-1 100% of surface Appendix III of MHK-COMP-SPE-
EP-COR-0350
Operating Corrosivity
temperature categories as per
(°C) System No. Remarks
MHK-COMP-SPE-EP-
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
C3 / C4 Not painted
- 40 +80
C5-M / CX P05
C3 / C4 Not painted
+81 +200
C5-M/ CX P13
C3 / C4 Not painted
+201 +400
C5-M/CX P11²nd
Not painted
-40 +50 C3 / C4 / C5-M/CX
Not painted
C3 / C4 Not painted
-50 +80
C5-M/CX P05
C3 / C4 Not painted
+81 +200
C5-M/CX P13
C3 / C4 Not painted
+201 +400
C5-M/CX P11²nd
SPECIFICATION
DOC OWNER :RPE DOC NUMBER :MHK-COMP-SPE-EP-COR-0354
REVISION NO :1
EFFECTIVE DATE :31-10-2018
TITLE :EXTERNAL PROTECTION OF
ONSHORE STRUCTURES AND EXPIRED DATE :31-10-2024
EQUIPMENT BY PAINTING PAGE :21 of 22
This document is the property of PT PERTAMINA HULU MAHAKAM (PHM). It must not be stored, reproduced or disclosed to others without written authorisation from PT PHM.
Operating Corrosivity
temperature categories as per
(°C) System No. Remarks
MHK-COMP-SPE-EP-
Mini Maxi COR-0001
Stainless steel, Uninsulated, type AISI 904, duplex and super duplex
C3 / C4 Not painted
+101 +200
19250517 - Achmad-Rizal ZAMRONI | Uncontrolled Paper Copy | CMS | 11-10-2021 8:34 AM
C5-M/CX P13
C3 / C4 Not painted
+201 +400
C5-M/CX P11²nd
Galvanized surfaces
OTHER
Buried items
Chassis/skid of package
Operating Corrosivity
temperature categories as per
(°C) System No. Remarks
MHK-COMP-SPE-EP-
Mini Maxi COR-0001
Visible parts
-40 +80 C3 / C4 / C5-M/CX P16 Walls, ceilings: e.g.: insulated wall and ceiling
Floors