PROPOSED TWO-STOREY RESIDENTIAL BUILDING

A Project Proposal Presented to


The College of Engineering Department
University of Mindanao
Matina, Davao City

In Partial Fulfillment of the Requirements in


BCE 413D – 4825

Submitted by:
Lao, Thea Philline C.
Manligas, Maraiah Jonna B.

Submitted to:
Engr. Danny Mar T. Naipa

October 2021
PERSPECTIVE
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


ENGR. THEA PHILLINE LAO RESIDENTIAL HOUSE

A-1
YOUR DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA MANLIGAS PERSPECTIVE
LOGO
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
2

Su

2.
00
N b di

00
. 48 vis
3M °1 io
.7 5' n
, 22 0
0
0 W ,1
Ro
W 2.5 8. ad
°8' 34
52 M
.
S

2.
3

00
00
M .
S6
2°2 8.79
1 d
7' E E, a
,1 1' Ro
0

7.6 ° 1 n
00

6M 58 i s io
v
2.0

. N di
b
4 Su
PROPOSED TWO-STOREY RESIDENTIAL BLDG.
FLOOR AREA = 208 SQM
LOT AREA = 347.82 SQM

SITE DEVELOPMENT PLAN


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


ENGR. THEA PHILLINE LAO RESIDENTIAL HOUSE

A-2
YOUR DANNY MAR T. NAIPA
LOGO ENGR. MARAIAH JONNA MANLIGAS SITE DEVELOPMENT PLAN
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
SITE

VICINITY MAP
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


ENGR. THEA PHILLINE LAO RESIDENTIAL HOUSE

A-3
YOUR DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA MANLIGAS VICINITY MAP
LOGO
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
Y Y

A B C D A B C D
4.0000 5.0000 2.0000
4.0000 5.0000 2.0000

W W W W
W
0 3 0 1 0 3 0 3
0 1
1 1

LAUNDRY
D D
0 2
RESTROOM 2
0 2

W 4.5000
4.5000 0 1
BEDROOM RESTROOM 1 D
W 0 3
1 MASTER'S
0 1
BEDROOM
D
0 2

2 D D 2
W 0 2 0 3
D
W 0 3 0 1
0 1
D
0 4 W
X W W 3.0000
3.0000 X 0 1
0 1 0 1

D D
0 2 0 2
3
D 3 TERRACE
0 2 DOWN

W W
W
MAID'S 0 1 0 1
0 1
QUARTER
BEDROOM BEDROOM
2 3
5.5000
5.5000

GARAGE LIVING AREA W


W
0 1
0 1
W
UP 0 2

4 4
W W
RAMP D W
0 1 0 1
0 1 PORCH 0 1 4.0000 2.5500 2.9500 1.5000

GROUND FLOOR PLAN SECOND FLOOR PLAN


Scale: 1:1 Scale: 1:1

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


ENGR. THEA PHILLINE LAO RESIDENTIAL HOUSE

A-4
YOUR DANNY MAR T. NAIPA FLOOR PLANS
LOGO ENGR. MARAIAH JONNA MANLIGAS
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
A B C D

TOP OF RIDGE

COLORED GUTTER
1.9000

CEILING LINE
2.9000

UPVC SLIDING WINDOW


ALUMINUM TINTED GLASS
2ND FFL
GLASS WINDOW
SOLID GLASS
3.1500

CONCRETE HBW
WOODEN MOULDED DOOR
NARRA TYPE
1ST FFL

0.3000 FGL

FRONT SIDE ELEVATION


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO ELEVATIONS
A-5
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
D C B A

TOP OF RIDGE

1.9000

CEILING LINE COLORED GUTTER


2.9000

UPVC SLIDING WINDOW


ALUMINUM TINTED GLASS
2ND FFL

WOODEN PLAIN DOOR


3.1500

UPVC AWNING WINDOW

1ST FFL

0.3000 FGL

REAR SIDE ELEVATION


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO ELEVATIONS
A-5
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
1 2 3 4

TOP OF RIDGE

COLORED GUTTER
1.9000

CEILING LINE
2.9000

2ND FFL TINTED GLASS


3.1500

UPVC SLIDING WINDOW


ALUMINUM TINTED GLASS
0.3000
1ST FFL

FGL

LEFT SIDE ELEVATION


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO ELEVATIONS
A-5
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
1 2 3 4

TOP OF RIDGE

COLORED GUTTER
1.9000

CEILING LINE
2.9000

2ND FFL TINTED GLASS


3.1500

UPVC SLIDING WINDOW


ALUMINUM TINTED GLASS
0.3000
1ST FFL

FGL

LEFT SIDE ELEVATION


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO ELEVATIONS
A-5
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
4 3 2 1

TOP OF RIDGE

1.9000 COLORED GUTTER

CEILING LINE
2.9000

UPVC SLIDING WINDOW


ALUMINUM TINTED GLASS
2ND FFL

CONCRETE HBW
3.1500

0.3000
1ST FFL

FGL

RIGHT SIDE ELEVATION


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO ELEVATIONS
A-5
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
0.5000

1.4500 0.5000

0.4000
0.5000

1.3000

0.8500
2.0000 1.6500

2ND FFL 2ND FFL


1.4500

4.8000

4.0000

3.1500
0.9000 1.3000
0.5000

3.0000
3.1500

1.6500

1ST FFL 1ST FFL 1ST FFL 1ST FFL 1ST FFL

W WINDOW-2 W
WINDOW-2
W WINDOW-1 0 2
0 1 GLASS WINDOWS 0 3 AWNING WINDOW
GLASS WINDOWS
0.5X0.5M UPVC AWNING WINDOW,
1.3X1.45M UPVC SLIDING WINDOW, 2X0.5M GLASS WINDOW, ALUMINUM TINTED GLASS
ALUMINUM TINTED GLASS SOLID GLASS

0.9000 2.0000
0.9000

0.8000 8.0000 1.8000


0.8000
0.7000

2.20012.1491 2.1914 2.1000


1.900 1.800 2.0000
1.9000

FFL

FFL FFL FFL


D
0 1
DOOR-1 DOOR-2 DOOR-4
D D
MAIN PANEL DOOR 0 2
D DOOR-3 0 4 TERRACE DOOR
EXIT AND ROOM DOOR 0 3
T&B DOOR
0.9x2.2M WOODEN
0.9X1.9M WOODEN 2X2.5M UPVC SLIDING
MOULDED DOOR 0.8X2.0M PVC DOOR
PLAIN DOOR DOOR GLASS TYPE
NARRA TYPE WITH LOUVER

DETAILS OF DOORS AND WINDOWS


Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


ENGR. THEA PHILLINE LAO RESIDENTIAL HOUSE

A-6
YOUR DANNY MAR T. NAIPA DETAILS OF DOORS
LOGO ENGR. MARAIAH JONNA MANLIGAS AND WINDOWS
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
A B C D

TOP OF RIDGE

1.9000
CEILING LINE
MASTER'S
2.9000 BEDROOM RESTROOM 2

2ND FFL

RESTROOM 1
BEDROOM
3.1500

1 KITCHEN

0.3000
1ST FFL

FGL

CROSS SECTION
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO CUT SECTIONS
A-7
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
1 2 3 4

TOP OF RIDGE

1.9000
CEILING LINE

TOILET &
BATH
2.9000

BEDROOM
2

2ND FFL

KITCHEN LIVING ROOM


3.1500

0.3000
1ST FFL

FGL

LONGITUDINAL SECTION
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE C. LAO CUT SECTIONS
A-7
..\..\..\Users\User\Desktop\4th yr 1st sem 2021\BCE 314- HYDRAULICS (2246)\University_of_Mindanao_Logo.png
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
TORIL , DAVAO CITY OWNER
CIVIL ENGINEER
Y

A B C D
4.0000 5.0000 2.0000

C1 F1 F1 C1 F1
C1 C1 1
F1 FTB FTB

FTB

FTB

FTB
FTB
4.5000

FTB
F1
C1 FTB C1 C1
2

F1 FTB
F1

FTB
X 3.0000
F1 13.0000

C1 C1
3

F1
FTB

10mm dia Rebars spaced @


FTB

0.70m O.C.

FTB
FTB
5.5000

F1
C1 C1 FTB C1 C1
4

F1 F1 F1 FOUNDATION PLAN
11.0000
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE LAO
S-1
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA MANLIGAS FOUNDATION PLAN
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
BEAM SCHEDULE

TYPICAL INTERIOR WALL FTG DETAIL


Scale: NTS

TYPICAL BEAM DETAIL


A
Scale: NTS

TYPICAL EXTERIOR WALL FTG DETAIL


TYPICAL FOOTING TIE-BEAM DETAIL Scale: NTS
Scale: NTS

DESIGNING PROFESSIONAL: TYPICAL BEAM DETAIL


PROPOSED TWO - STOREY SHEET N0.
TYPICAL FTB DETAIL
SCHOOL BUILDING TYPICAL INTERIOR WALL
ENGR. THEA PHILLINE LAO
S-2
DANNY MAR T. NAIPA FTG DETAIL
ENGR. MARAIAH JONNA MANLIGAS TYPICAL EXTERIOR WALL
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER FTG DETAIL
300mm

4-16MM Ø DEF. VERTICAL BARS


2 SETS - 10MM Ø TIES
8 @ 100, REST @ 150 TO MIDHT

FFL

125mm SLAB

NGL
NATURAL FILL
300mm 1.80m

1.50m 16 - 16MM Ø BED BARS SPACED EQUALLY BOTHWAYS

300mm

100mm
1.80m

1.80m

F1 - C1 DETAILS
SCALE:

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE LAO
S-3
DANNY MAR T. NAIPA F1-C1 DETAIL
ENGR. MARAIAH JONNA MANLIGAS
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
Y

B-1

4.0000 5.0000 2.0000

C1 C1 C1
C1

S1
S1 S1 S1 4.5000

S1
C1
C1 C1
B-8
S1 S1 3.0000

B-3 B-5 B-2


X B-7
C1
C1
S1

S1 5.5000
S1 S1 OPEN
AREA

SECOND FLOOR FRAMING PLAN


C1
C1 C1 C1 Scale: NTS
4.0000 2.5500 2.9500 1.5000

B-4

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING SECOND FLOOR
ENGR. THEA PHILLINE LAO
S-4
DANNY MAR T. NAIPA FRAMING PLAN
ENGR. MARAIAH JONNA MANLIGAS
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
Y
A B RB-1 C D
4.0000 5.0000 2.0000

TRUSS TRUSS TRUSS


ROOF FRAMING PLAN
Scale: NTS
RB-6 4.5000

TRUSS
TRUSS TRUSS 10MM PLAIN ROUND BAR SAG ROD

RB-2
X RB-5 3.0000

TRUSS TRUSS 50MM X 100MM CEE PURLINS

5.5000

RB-4
10 MM DIAMETER PLAIN ROUND BAR
CROSS BRACING

TRUSS TRUSS

RB-3
DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.
SCHOOL BUILDING
ENGR. THEA PHILLINE LAO
S-5
DANNY MAR T. NAIPA ROOF FRAMING PLAN
ENGR. MARAIAH JONNA MANLIGAS
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
Y
12.6000
A B C D
4.0000 5.0000 2.0000

6.1000 4.5000
FLAT ROOF

X 4.0000 3.0000
14.6000
ROOF PLAN
3
Scale: NTS

FLAT ROOF
8.5000

5.5000

4 50 MM PLAIN COLORED
ROOF SHEET

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING
ENGR. THEA PHILLINE LAO
S-6
DANNY MAR T. NAIPA ROOF PLAN
ENGR. MARAIAH JONNA MANLIGAS
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
LAUNDRY

BEDROOM RESTROOM 1 RESTROOM 2


1 MASTER'S
BEDROOM

TERRACE

MAID'S
QUARTER
BEDROOM BEDROOM
2 3 DOWN

GARAGE LIVING AREA

UP

RAMP
PORCH

GROUND FLOOR SECOND FLOOR


PLUMBING LAY-OUT PLUMBING LAY-OUT
Scale: NTS Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


GROUND FLOOR
SCHOOL BUILDING PLUMBING LAY-OUT
ENGR. THEA PHILLINE C. LAO
P-1
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS SECOND FLOOR
TORIL, DAVAO CITY OWNER PLUMBING LAY-OUT
CIVIL ENGINEER
PIPE JOINT DETAILS M
1
ROO
ST
RE
Scale: NTS
Y
DR
UN
LA S ER
ID' RT
MAQUA
M
OO
EDR 1
B

EA
AR
IN
G UP
LIV

H
RC
PO
E
R AG
GA

MP
RA

PLUMBING LINE
ISOMETRIC DETAIL
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING PIPE JOINT DETAILS
ENGR. THEA PHILLINE C. LAO
P-1A
DANNY MAR T. NAIPA PLUMBING LINE
ENGR. MARAIAH JONNA B. MANLIGAS ISOMETRIC DETAIL
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
LAUNDRY

BEDROOM
RESTROOM 1 RESTROOM 2
1
MASTER'S
BEDROOM

TERRACE

MAID'S
QUARTER

BEDROOM BEDROOM
2 3 DOWN

GARAGE LIVING AREA

UP M

RAMP
PORCH

GROUND FLOOR SECOND FLOOR


WATER LINE LAY-OUT WATER LINE LAY-OUT
Scale: NTS Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


GROUND FLOOR
SCHOOL BUILDING WATER LINE LAY-OUT
ENGR. THEA PHILLINE C. LAO
P-2
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS SECOND FLOOR
TORIL, DAVAO CITY OWNER WATER LINE LAY-OUT
CIVIL ENGINEER
FINISHED GRADE

GROUND FLOOR
CLEAN OUT DETAIL
Scale: NTS FLOOR DRAIN DETAIL
Scale: NTS

1
OM
RO
ST
RE

M DR
Y
UN
LA
'S ER
ID RT
MAQUA
M
OO M
DR 1
BE

EA
AR
NG UP
I
LIV

H
RC
PO

GA
RA
GE
WATER LINE
RA
MP
ISOMETRIC DETAIL
Scale: NTS

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY GROUND FLOOR SHEET N0.


SCHOOL BUILDING CLEAN OUT DETAIL
ENGR. THEA PHILLINE C. LAO
P-2A
DANNY MAR T. NAIPA FLOOR DRAIN DETAIL
ENGR. MARAIAH JONNA B. MANLIGAS WATER LINE ISOMETRIC
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER DETAIL
LAUNDRY

BEDROOM RESTROOM 2
RESTROOM 1
1 MASTER'S
BEDROOM

TERRACE

MAID'S
QUARTER
BEDROOM BEDROOM
2 3 DOWN

GARAGE LIVING AREA

UP

RAMP
PORCH

GROUND FLOOR SECOND FLOOR


STORM DRAIN STORM DRAIN
Scale: NTS
Scale: NTS
1
OM
RO
ST
RE

Y
DR
UN
LA
'S ER
ID RT
MAQUA
M
OO
DR 1
BE

EA
AR
G UP
IN
LIV

RCH
PO

GA
RA
GE
STORM DRAIN
ISOMETRIC DETAIL
Scale: NTS

DESIGNING PROFESSIONAL: GROUND FLOOR STORM


PROPOSED TWO - STOREY SHEET N0.
DRAIN
SCHOOL BUILDING SECOND FLOOR STORM
ENGR. THEA PHILLINE C. LAO
P-3
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS DRAIN
TORIL, DAVAO CITY OWNER STORM DRAIN ISOMETRIC
CIVIL ENGINEER DETAIL
ALL PLUMBING WORKS & INSTALLATIONS TO BE UNDERTAKEN HEREIN
"WAVEN" EKOPLASTIK PPR PIPE FUSION TYPE PN 10 FOR COLD WATER LINES
SHALL CONFORM WITH THE LATEST PROVISIONS OF THE NATIONAL PLUMBING
AND PN 16 FOR HOT WATER LINES. 12 MMO FOR BRANCH LINES & 19 MMO
CODE, RULES & REGULATIONS & THE CITY ORDINACES.
FOR MAIN SUPPLY LINES. (DISTRIBUTED BY THREE G BLDG. APPLICATIONS INC.)

FOR SANITARY LINES: USE PVC PIPE S-1000


A. 50mmØ PVC FOR VENT FIXTURES. 50mmØ TO 100mmØ "NELTEX" PVC PIPES SERIES
/ 1000, 150mmO & ABOVE
B. 100mmØ PVC PIPE FOR MAIN & WATER CLOSET. "NELTEX" PVC PIPES CLASS 35 CONCRETE DRAIN PIPE (CDP) IF OUTSIDE
THE BLDG. OR EQUIVALENT E.G. POLYETHYLENE PIPE (PE).
FOR WATER LINES: USE G.I. PIPE SCHED. 40
A. 9mmØ FOR FIXTURES "KITZ" OR "CRANE" BRAND OR APPROVED EQUAL.
B. 12mmØ FOR BRANCHES 50mmØ TO 100mmØ "NELTEX" PVC PIPES SERIES
/ 1000, 150mmO & ABOVE
C. 19mmØ FOR MAIN LINE "NELTEX" PVC PIPES CLASS 35, OR APPROVED EQUAL. E.G. POLYETHYLENE
PIPE. "EVER" OR "ASAHI" MWSS BRAND OR EQUAL.
ALL WORKS & INSTALLATIONS SHALL BE DONE OR LAID UNDER CLOSE
SUPERVISION OF A DULY LICENSED MASTER PLUMBER.
/
DOWN SPOUTS 50mmO TO
/ 100mmO "NELTEX" PVC PIPES SERIES 1000
OR APPROVED EQUAL. METMA ROUND SUPER TOP MODEL M-332 OR EQUAL.

50mmØ TO 100mmØ "NELTEX" PVC PIPES SERIES 1000 OR APPROVED EQUAL.

PLAN PLAN

TYPICAL GREASE TRAP SECTION DETAIL SECTION

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING TYPICAL GREASE TRAP
ENGR. THEA PHILLINE C. LAO
P-4
DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS SECTION DETAIL
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
SECTION
PLAN

TYPICAL CATCH BASIN SECTION DETAIL

WATER METER CONNECTION DETAIL

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


TYPICAL CATCH BASIN
SCHOOL BUILDING SECTION DETAIL
ENGR. THEA PHILLINE C. LAO DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA B. MANLIGAS
CIVIL ENGINEER
TORIL, DAVAO CITY OWNER
WATER METER
CONNECTION DETAIL P-4A
Ø

SEPTIC VAULT 01 PLAN


Ø

Ø
Ø OUTLET INLET
AIR SPACE AIR SPACE

EARTH
DIGESTIVE LEACHING EARTH
Ø CHAMBER CHAMBER 2

Ø
Ø

SEPTIC VAULT 01 SECTION DETAIL


SLUDGE PIT SLUDGE PIT
Ø
Ø

GRAVEL BASE GRAVEL BASE

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING SEPTIC VAULT 01 PLAN
ENGR. THEA PHILLINE C. LAO DANNY MAR T. NAIPA SEPTIC VAULT 01 SECTION
ENGR. MARAIAH JONNA B. MANLIGAS
CIVIL ENGINEER
TORIL, DAVAO CITY OWNER
DETAIL P-4B
EARTH

AIR
SPACE

DIGESTIVE LEACHING LEACHING LEACHING


DIGESTIVE CHAMBER CHAMBER 2 CHAMBER 2 CHAMBER 1
CHAMBER

EARTH

GRAVEL GRAVEL GRAVEL GRAVEL


BASE BASE BASE BASE

GRAVEL BASE GRAVEL BASE

EARTH

SLUDGE PIT

SPOT DETAIL WALL FOOTING SECTION DETAIL

GRAVEL BASE

GRAVEL BASE

SPOT DETAIL

DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.


SCHOOL BUILDING SPOT DETAIL
ENGR. THEA PHILLINE C. LAO DANNY MAR T. NAIPA WALL FOOTING SECTION
ENGR. MARAIAH JONNA B. MANLIGAS
CIVIL ENGINEER
TORIL, DAVAO CITY OWNER
DETAIL P-4C
EARTHWORKS
❖ Excavation
FOUNDATION FOOTING
# of Column Footings = 13
A = 1.80m x 1.80m = 3.24m2
V = 3.24m2 x 1.60m = 5.184m3
VT = 5.184 (13) = 67.392m3

WALL FOOTING
AEXTERIOR = 0.60m x 0.25m = 0.15m2
1.80−0.30
X= 2
= 0.75m

L1 = [4 – 0.15 (2) – 0.75 (2)] (2) = 4.4m


L2 = [5 – 0.15 (2) – 0.75 (2)] (2) = 6.4m
L3 = [2 – 0.15 (2) – 0.75 (2)] (2) = 0.4m
L4 = [4.5 – 0.15 (2) – 0.75 (2)] (2) = 5.4m
L5 = [3 – 0.15 (2) – 0.75 (2)] (2) = 2.4m
L6 = [5.50 – 0.15 (2) – 0.75 (2)] (2) = 7.4m
Total Length = 26.4m
VT = 0.15m2 x 26.4m = 3.96m3
VGRAVEL = (0.10) (0.60) (26.4) = 1.584m3
Total EXCAVATION = 67.392m3 + 3.96m3
+ 1.584m3
= 72.936m3 ≈ 73m3
❖ Gravel Base
FOUNDATION FOOTING
V = 1.80m x 1.80m X 0.10m = 3.7m3
VT = 3.7m3 (13) = 48.1m3
WALL FOOTING
L = [11 – 4 (0.30)] (2) + [13 – 4 (0.30)] (2) = 43.2m
V = 0.60m (0.1m) (43.2m) = 2.592m3
FLOORING
A = 11 (13) – 0.3 (0.3) (13) – 0.150m (43.2m)
= 135.35m2 (Floor Area)
V = 135.35 (0.1) = 13.535m3
Total GRAVEL BASE = 48.1m3 + 2.592m3
+13.535m3
= 64.227m3 ≈ 70m3
❖ Backfill
FOUNDATION FOOTING
V = 1.25m (3.24m2 – 0.09m2) = 3.9375m3
VDEDUCTION = 0.35m (0.60m) (1.60m) = 0.336m3
VT = 3.9375m3 + 12 [3.9375m3 – 0.336m3 (2)]
= 43.1235m3
WALL FOOTING
V = 26.4m (1.25m) (0.60m – 0.15m) = 14.85m3
Total BACKFILL = 43.1235m3 + 14.85m3
= 57.97m3 ≈ 60m3
❖ Fill Material
Excess = 73m3 – 60m3 = 13m3
V = 135.35m (0.069) = 9.339m3 ≈ 9.5m3
Since, fill material can be deducted to the excess, there’s no need to buy for it.
FORMWORKS

300mm
@COLUMNS
Column Dimension:
300mm

P = 2 (a + b) + 0.20 = 2(0.30m + 0.30m) + 0.20m = 1.4 m

• For First Floor:


A = 1.4m x 4.65m = 6.51 m2
• Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet
6.51 𝑚2
# Of Plywood = 2 = 2.260≈ 3 sheets per column
2.88 m ⁄sheet

▪ Framing: Use 2” x 2” x 16’ (4.8 m) Lumber


12in 3
Lumber Volume = 2in x 2in x (16ft x ) = 768 in ⁄piece
1ft

6mm thk. plywood multiplier = 29.67 bd. ft.⁄sheet


144in3
3 sheets x 29.67 bd. ft.⁄sheet = 89.01 bd. ft. x 1bd.ft. = 12817.44 in3

12817.44 in3
No. of Lumber = 3 = 16.68 ≈ 17 pieces per column
768 in ⁄piece

• For Second Floor:

P = 2 (a + b) + 0.20 = 2 (0.25m + 0.25m) + 0.20m = 1.2m


A = 1.2m x 3.15m = 3.78 m2
▪ Plywood: Use ¼” x 4’ x 12’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet
3.78 m2
# of Plywood = 2 = 1.3125 ≈ 2 sheets per column
2.88 m ⁄sheet

▪ Framing: Use 2” x 2” x 12’ (3.6 m) Lumber


12in 3
Lumber Volume = 2in x 2in x (12ft x ) = 576 in ⁄piece
1ft

6mm thk. plywood multiplier = 29.67 bd. ft.⁄sheet

144in3
2 sheets x 29.67 bd. ft.⁄sheet = 59.34 bd. ft. x 1bd.ft. = 8544.96 in3

8544.96 in3
No. of Lumber = 3 = 14.835 ≈ 15 pieces per column
576 in ⁄piece

BEAMS
P = 2d +b+ 0.10= 2 (0.30) +0.2+0.10= 0.9m
Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet

B-1 & B-4:


4m + 5m + 2m + 0.30m + 0.35m = 11.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (3.7m + 4.7m + 1.7m) = 9.09 m2


9.09 m2
No. of Plywood = 2 = 3.156 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x ) = 672 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 21.48 ≈ 22 pieces
672 in ⁄piece

B-2 & B-3 & B-5:


4.5m + 3m + 5.5m + 0.30m + 0.35m = 13.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (4.2m + 2.7m + 5.2m) 10.89 m2


10.89 m2
No. of Plywood = 2 = 3.781=4 x 3 ≈ 12 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x ) = 672 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x 1bd.ft.
= 14434.56 in3
14434.56 in3
No. of Lumber = 3 = 21.48 =22(3) ≈ 22 pieces
672 in ⁄piece

B-6:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)

A= 0.9m x (3.7m) =3.33 m2


3.33 m2
No. of Plywood = 2 = 1.156 ≈ 2 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.00 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
2 sheets x 25.06 bd. ft.⁄sheet = 50.12 bd. ft. x = 7217.28 in3
1bd.ft.
7217.28 in3
No. of Lumber = 3 = 15.036 ≈ 16 pieces
480in ⁄piece

B-7 & B-8:


5m + 2m + 0.30m + 0.35m = 7.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (4.7m +1.7m) = 5.76 m2


5.76 m2
No. of Plywood = 2 = 2 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x ) = 672 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
2 sheets x 25.06 bd. ft.⁄sheet = 50.12 bd. ft. x = 7217.28 in3
1bd.ft.
7217.28 in3
No. of Lumber = 3 = 10.74 ≈ 11 pieces
672 in ⁄piece

ROOF BEAM
P = 2d +b+ 0.10= 2 (0.3) +0.2+0.10= 0.9m
▪ Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet

@RB-1:
4m + 5m + 2m + 0.30m + 0.35m = 11.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (3.7m + 4.7m + 1.7m) = 9.09 m2


9.09 𝑚2
# of Plywood = 2 = 3.156≈ 4 sheets
2.88 m ⁄sheet
▪ Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x 1ft ) = 672 in ⁄piece
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 21.48 ≈ 22 pieces
672 in ⁄piece

@RB-2:
4.5m + 3m + 5.5m + 0.30m + 0.35m = 13.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (4.2m + 2.7m + 5.2m) 10.89 m2

10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece

@RB-3:
5m + 2m + 0.30m + 0.35m = 7.65m > 6m (CONTINUOUS BEAM)

A= 0.9m x (4.2m + 2.7m + 5.2m) 10.89 m2

10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece

@RB-4:
3m + 5.5m + 0.30m + 0.35m = 9.15m > 6m (CONTINUOUS BEAM)
A= 0.9m x (3.7m + 4.7m + 1.7m) = 9.09 m2
9.09 𝑚2
# of Plywood = 2 = 3.156≈ 4 sheets
2.88 m ⁄sheet
▪ Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x 1ft ) = 672 in ⁄piece
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 21.48 ≈ 22 pieces
672 in ⁄piece

@RB-5:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
A= 0.9m x (4.2m + 2.7m + 5.2m) 10.89 m2

10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece

@RB-6:
4.5m + 0.30m + 0.35m = 5.15m < 6m (ONE SPAN BEAM)

A= 0.9m x (3.7m) =3.33 m2


3.33 m2
No. of Plywood = 2 = 1.156 ≈ 2 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 20’ (6.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (20ft x ) = 960 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
2 sheets x 25.06 bd. ft.⁄sheet = 50.12 bd. ft. x = 7217.28 in3
1bd.ft.
7217.28 in3
No. of Lumber = 3 = 7.518 ≈ 8 sheets
960 in ⁄piece

FTB
P = 2d +b+ 0.10= 2 (0.30) +0.2+0.10= 0.9m

A = 0.9m x 83m = 74.7 m2


▪ Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet
74.7 𝑚2
# of Plywood = 2 = 25.9375≈ 26 sheets
2.88 m ⁄sheet

▪ Framing: Use 2” x 2” x 14’ (4.20 m) Lumber


12in 3
Lumber Volume = 2in x 2in x (14ft x ) = 672 in ⁄piece
1ft

6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet


144in3
26 sheets x 25.06 bd. ft.⁄sheet = 651.56 bd. ft. x = 93824.64 in3
1bd.ft.

93824.64 in3
No. of Lumber = 3 = 139.62 ≈ 140 pieces
672 in ⁄piece

SUMMARY

Total #of Plywood = 2+24+2+36+18 + 26 =108 - ¼” x 4’ x 8’ Plywood

Total No. of Lumber (in bd.ft.):


1 bd.ft.
10’ (480 in3) = 31+31+31+6 = 99 pieces x (480 in3 x ) = 330 bd.ft.
144 in3 .

1 bd.ft.
14’ (672 in3) = 22+22+22+66+44 +140= 316 pieces x (672 in3 x ) = 1475 bd.ft.
144 in3 .

1 bd.ft.
20’ (960 in3) = 8 = 8 pieces x (960 in3 x ) = 54 bd.ft.
144 in3.

Total # of lumber = 1859 bd.ft.


STEEL REINFORCEMENTS
Longitudinal Beams – 16mm Ø (Grade 40) Reinforcement Bars
2nd Floor Framing Plan
@B-1 & B-4:
4m + 5m + 2m + 0.30m + 0.35m = 11.65m > 6m (CONTINUOUS BEAM)
2 (11.65)(6.6)
# of FLB req. = = 25.63 ≈ 26 lengths
6
@B-2, B-3 & B-5:
4.5m + 3m + 5.5m + 0.30m + 0.35m = 13.65m > 6m (CONTINUOUS BEAM)
3 (13.65)(6.6)
# of FLB req. = = 45.045 ≈ 46 lengths
6
@B-6:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
6𝑚
# of FLB req. = 4.65𝑚 = 1.290m ≈ 1pc. (6) = 6 lengths
@B-7 & B-8:
5m + 2m + 0.30m + 0.35m = 7.65m > 6m (CONTINUOUS BEAM)
2 (7.65)(6.6)
# of FLB req. = 6
= 16.83 ≈ 17 lengths

Roof Framing Plan


@RB-1:
4m + 5m + 2m + 0.30m + 0.35m = 11.65m > 6m (CONTINUOUS BEAM)
1(11.65)(6.6)
# of FLB req. = = 12.815 ≈ 13 lengths
6
@RB-2:
4.5m + 3m + 5.5m + 0.30m + 0.35m = 13.65m > 6m (CONTINUOUS BEAM)
1 (13.65)(6.6)
# of FLB req. = = 15.015 ≈ 16 lengths
6
@RB-3:
5m + 2m + 0.30m + 0.35m = 7.65m > 6m (CONTINUOUS BEAM)
1 (7.65)(6.6)
# of FLB req. = = 8.415 ≈ 9 lengths
6

@RB-4:
3m + 5.5m + 0.30m + 0.35m = 9.15m > 6m (CONTINUOUS BEAM)
1 (9.15)(6.6)
# of FLB req. = = 10.065 ≈ 11 lengths
6
@RB-5:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
6𝑚
# of FLB req. = 4.65𝑚 = 1.290m ≈ 1pc. (6) = 6 lengths
@RB-6:
4.5m + 0.30m + 0.35m = 5.15m < 6m (ONE SPAN BEAM)
6𝑚
# of FLB req. = = 1.165m ≈ 1pc. (6) = 6 lengths
5.15𝑚

Total # of FLB required = 26 + 46 + 6 + 17 + 13 + 16 + 9 + 11 + 6 + 6


= 156 – 16mm Ø x 6m Full Length Bars
Stirrups – 10mm Ø (Grade 40) Reinforcement Bars
Stirrup length = 0.85m; # of stirrups/FLB = 7pcs; FLB = 6m
2 Floor Framing plan – 1@50mm, 6@100mm, 4@150mm & the rest @200mm
nd

𝐿−2(𝑆1𝑛1+𝑠2𝑛2+𝑠3𝑛3)
N = 2 (n1 + 1) + 2n2 + 2n3 + [ ]
𝑠4
@B-1 & B-4: L1 = 3.7m; L2 = 4.7m; L3 = 1.7m
3.7−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 30
0.200
4.7−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 35
0.200
1.7−2(0.050(1)+0.100(6)+0.150(4))
NL3 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 20
0.200
Total # of Stirrups (B-1 & B-4) = 30 + 35 + 20 = 85 (2) = 170 pcs.
@B-2 & B-5: L1 = 4.2m; L2 = 2.7m; L3 = 5.2m
4.2−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 32.5 ≈ 33
0.200
2.7−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 25
0.200
5.2−2(0.050(1)+0.100(6)+0.150(4))
NL3 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 37.5 ≈ 38
0.200
Total # of Stirrups (B-2 & B-5) = 33 + 25 + 38 = 96 (2) = 192 pcs.
@B-3: L1 = 4.2m; L2 = 8.2m
4.2−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 32.5 ≈ 33
0.200
8.2−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 52.5 ≈ 53
0.200
Total# of Stirrups (B-3) = 33 + 53 = 86 pcs.
@B-6: L = 3.7m
3.7−2(0.050(1)+0.100(6)+0.150(4))
NL = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 30 pcs.
0.200
@B-7 & B-8: L = 6.7m
6.7−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 45
0.200
Total # of Stirrups (B-7 & B-8) = 45 (2) = 90 pcs.

Roof Framing Plan – 1@50mm, 6@100mm & the rest @150mm


𝐿−2(𝑆1𝑛1+𝑠2𝑛2)
N = 2 (n1 + 1) + 2n2 + [ ]
𝑆3
@RB-1: L1 = 3.7m; L2 = 4.7m; L3 = 1.7m
3.7−2(0.050(1)+0.100(6))
NL1 = 2 (1 + 1) + 2(6) + [ ] = 32
0.150
4.7−2(0.050(1)+0.100(6))
NL2 = 2 (1 + 1) + 2(6) + [ ] = 38.667 ≈ 39
0.150
1.7−2(0.050(1)+0.100(6))
NL3 = 2 (1 + 1) + 2(6) + [ ] = 18.667 ≈ 19
0.150
Total # of Stirrups (RB-1) = 32 + 39 + 19 = 90 pcs.
@RB-2: L1 = 4.2m; L2 = 2.7m; L3 = 5.2m
4.2−2(0.050(1)+0.100(6))
NL1 = 2 (1 + 1) + 2(6) + [ ] = 35.333 ≈ 36
0.150
2.7−2(0.050(1)+0.100(6))
NL2 = 2 (1 + 1) + 2(6) + [ ] = 25.333 ≈ 26
0.150
5.2−2(0.050(1)+0.100(6))
NL3 = 2 (1 + 1) + 2(6) + [ ] = 42
0.150
Total # of Stirrups (RB-2) = 36 + 26 + 42 = 104 pcs.
@RB-3: L1 = 4.7m; L2 = 1.7m
4.7−2(0.050(1)+0.100(6))
NL1 = 2 (1 + 1) + 2(6) + [ ] = 38.667 ≈ 39
0.150
1.7−2(0.050(1)+0.100(6))
NL2 = 2 (1 + 1) + 2(6) + [ ] = 18.667 ≈ 19
0.150
Total # of Stirrups (RB-3) = 39 + 19 = 58 pcs.
@RB-4: L1 = 2.7m; L2 = 5.2m
2.7−2(0.050(1)+0.100(6))
NL1 = 2 (1 + 1) + 2(6) + [ ] = 25.333 ≈ 26
0.150
5.2−2(0.050(1)+0.100(6))
NL2 = 2 (1 + 1) + 2(6) + [ ] = 42
0.150
Total # of Stirrups (RB-4) = 26 + 42 = 68 pcs.
@RB-5: L = 3.7m
3.7−2(0.050(1)+0.100(6))
NL = 2 (1 + 1) + 2(6) + [ ] = 32 pcs.
0.150
@RB-6: L = 4.2m
4.2−2(0.050(1)+0.100(6))
NL = 2 (1 + 1) + 2(6) + [ ] = 35.333 ≈ 36 pcs.
0.150

Total # of Stirrups = 170 + 192 + 86 + 30 + 90 + 90 + 104 + 58 + 68 + 32 + 36


= 956 pcs.
956
Total # of FLB required = = 136.571 ≈ 137 – 10mm Ø (Grade 40) x 6m FLB
7𝑝𝑐𝑠./𝐹𝐿𝐵

SUMMARY

Total # of FLB required for Longitudinal Bars:


= 156 – 16mm Ø (Grade 40) x 6m Full Length Bars

Total # of FLB required for Stirrups:


= 137 – 10mm Ø (Grade 40) x 6m Full Length Bars

COLUMN REINFORCEMENT

• For Vertical Bars


Total Length per Vertical Bar = 3.15 + 2.9 + 1.2 +(13 x 0.016m) = 7.458 ≈ 9 m
*Use 16mmø x 9m Full-Length Bars
No. of full-length bars = 4 x 13columns = 52 pieces
Total = 52 -16mmø x 9m Full-Length Bars

• Lateral Ties

➢ Spacing of Ties:
Vertical Bar ⌀ = 16mm ⌀
Lateral Ties = 10mm ⌀
Column Width = 0.3m
a. 16 x 16 = 256mm ⌀
b. 48 x 10 = 480mm ⌀
c. 300mm

Tie Spacing = 256mm ⌀ = 0.256m

➢ Number of Column ties (Ground to Second Floor)


6.05
+1 = 24.63 ≈ 25 ties
0.256

Number of columns = 13 columns

Number of Column Ties = 25 x 13 = 325pcs

➢ Length of Lateral Ties:


L = 0.30(4) = 1.2m
H = 9d = 9(10mm) = 90mm ≈ 0.09m
Lateral Ties Length = 1.2+ 2(0.09) = 1.38 m ≈ 1.4 m
Consider: 6.0 m
6.0𝑚
Number of Ties = 1.4 = 4.28 pcs ≈ 4
Consider: 7.50m
7.5𝑚
Number of Ties = = 5.36 pcs ≈ 5
1.4
Consider: 9.50m
9.0𝑚
Number of Ties = = 6.42 pcs ≈ 6
1.4

* Use: 10 mm ⌀ x 6.0m def. bars

➢ Number of Full-length bars:


325
= 81.25 ≈ 82
4
Number of Full-length bars = 82 – 10mm ⌀ x 6m full length bars

FOOTING REINFORCEMENT
Number of Footing = 13 Footings
L = 1.80 – 0.075 (2) = 1.65m
# of bed bars/footing = 5+5 = 10 pcs.
Total Number of Bed Bars = 10 (13) = 130 pcs.
*Using 12mm ⌀ x 6.0 m def. bars:
6
# of Cuts/ F.L.B. = 1.65 = 3.63 pcs ≈ 3 pcs/ F.L.B.
130 𝑝𝑐𝑠
# of Full-length bars = 3 𝑝𝑐𝑠 =43.33 ≈ 44 Full – Length bars
𝐹.𝐿.𝐵.
Number of Full-length bars= 44 – 12mm ⌀ x 6.0m full length bars
CHB REINFORCEMENT

Exterior Walls: 6” CHB (Front + Rear + Right + Left)


AEXTERIOR = (1.25m + 0.30m + 3.15m +2.90m) (5m + 2m) + (1.25m +0.30m + 3.15m
+2.90m) (4m + 5m + 2m) + (1.25m + 0.30m + 3.15m +2.90m) (4.5m + 3m + 5.5m) +
(1.25m + 0.30m + 3.15m +2.90m) (4.5m + 3m + 5.5m) = 364.8m 2
Total ADEDUCTION = (0.9m x 2.2m) + 17 (1.3m x 1.45m) + (2m x 0.5m) + 3 (0.5m x 0.5m)
+ (0.9m x 1.9m) + (2m x 2.5m) = 42.485m2

Total AEXTERIOR = 364.8m2 - 42.485m2 = 322.315m2

Interior Walls: 4” CHB (1st Floor + 2nd Floor)


AINTERIOR = 2 (4.5m – 0.30m – 0.15m) (3.025) + 2 (2m – 0.15m) (3.025m) +
(4m)(3.025m) + (5.5m – 0.75m)(3.025m) + (4.5m – 0.15m)(2.9) + (4.5m)(2.9m) + (2.55m +
2.95m + 1.5m – 2(0.15m))(2.9m) + (2.55m + 2.95m – 0.15m)(2.9m) + 2 (5.50m)(2.9m) =
154.67375m2
ADEDUCTION = 2 (0.9m x 0.9m) + 3 (0.8m x 2m) + (2m x 0.5m) + 3 (0.9m x 1.9m)
= 12.55m2
Total AINTERIOR = 154.67375m2 - 12.55m2 = 142.12375m2

Total net area = 322.315m2 + 142.12375m2 =464.439 m2

Vertical Reinforcement
Spacing @ 60 cm – 2.13 per sq. m
Total Length of Vertical Reinforcement = 464.439 m2 (2.13m/m2 ) = 989.255m

Horizontal Reinforcement
At every 3 Layers – 2.15 per sq. m
Total Length of Horizontal Reinforcement = 464.439 m2 (2.15m/m2 ) = 998.5439m

Total Wall Reinforcement Length= 989.255m + 998.5439m = 1987.7989

*Use: 6.0m Full – Length:


1987.7989
Total = 6m/bar = 331.299 bars ≈ 332 - 10mmø x 6m full length bars

SUMMARY:

82 – 10mm ⌀ x 6m full length bars + 332 - 10mmø x 6m full length bars


= 414 pcs- 10mmø x 6m full length bars

52pcs -16mmø x 9m Full-Length Bars


MASONRY WORKS
CHB:
Exterior Walls: 6” CHB (Front + Rear + Right + Left)
AEXTERIOR = (1.25m + 0.30m + 3.15m +2.90m) (4m + 5m + 2m) + (1.25m +
0.30m + 3.15m +2.90m) (4m + 5m + 2m) + (1.25m + 0.30m + 3.15m +2.90m) (4.5m +
3m + 5.5m) + (1.25m + 0.30m + 3.15m +2.90m) (4.5m + 3m + 5.5m) = 364.8m 2
Total ADEDUCTION = (0.9m x 2.2m) + 17 (1.3m x 1.45m) + (2m x 0.5m) + 3 (0.5m x 0.5m)
+ (0.9m x 1.9m) + (2m x 2.5m) = 42.485m2
Total AEXTERIOR = 364.8m2 - 42.485m2 = 322.315m2
# of 6” CHB = 322.315m2 (12.5 pcs/m2) = 4028.9375 ≈ 4029 pcs
Add: 10% allowance
Total # of 6” CHB = 4029 + 10% (4029) = 4431.9 ≈ 4432 pcs.
Interior Walls: 4” CHB (1st Floor + 2nd Floor)
AINTERIOR = 2 (4.5m – 0.30m – 0.15m) (3.025) + 2 (2m – 0.15m) (3.025m) +
(4m)(3.025m) + (5.5m – 0.75m)(3.025m) + (4.5m – 0.15m)(2.9) + (4.5m)(2.9m) + (2.55m +
2.95m + 1.5m – 2(0.15m))(2.9m) + (2.55m + 2.95m – 0.15m)(2.9m) + 2 (5.50m)(2.9m) =
154.67375m2
ADEDUCTION = 2 (0.9m x 0.9m) + 3 (0.8m x 2m) + (2m x 0.5m) + 3 (0.9m x 1.9m)
= 12.55m2
Total AINTERIOR = 154.67375m2 - 12.55m2 = 142.12375m2
# of 4” CHB = 142.12375m2 (12.5 pcs/m2) = 1776.547 ≈ 1777 pcs
Add: 10% allowance
Total # of 4” CHB = 1777 + 10% (1777) = 1954.7 ≈ 1955 pcs.

CEMENT MORTAR:
For Exterior Walls: 6” CHB
Total AEXTERIOR = 322.315m2
@Cement: CLASS A (40kg)
# of bags = 322.315m2 (1.526) = 491.853 ≈ 492 bags

@Sand: CLASS A
VSAND = 322.315m2 (0.0844) = 27.203 ≈ 30m3 of sand
For Interior Walls: 4” CHB
Total AINTERIOR = 142.124m2
@Cement: CLASS A (40kg)
# of bags = 142.124m2 (0.792) = 112.562 ≈ 113 bags
@Sand: CLASS A
VSAND = 142.124m2 (0.0435) = 6.182 ≈ 10m3 of sand

PLASTERING:
Total Area (Exterior + Interior) = 322.315m2 + 142.124m2 = 464.439m2
@Cement: CLASS A (40kg) – 16mm thick (double side)
# of bags = 464.439m2 (0.288) (2) = 267.517 ≈ 268 bags
@Sand: CLASS A – 16mm thick (double side)
VSAND = 464.439m2 (0.016) (2) = 14.862 ≈ 15m3 of sand

SUMMARY:

Cement = 492 + 113 + 268 = 873 bags (40kg)

Sand = 30m3 + 10m3 + 15m3 = 55m3 of Sand

CONCRETE WORKS
@COLUMNS
FIRST FLOOR:
H= 1.2 + 3.150 + = 4.35m
VOLUME = L x W x H = 0.30 x 0.30 x 4.35 = 0.3915𝑚3 x 13 = 5.0895 𝑚3

FOR CEMENT: (CLASS A- 40KG)


# of bags = 5.0895 𝑚3 x 9 = 53.055 ≈ 54 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 5.0895 𝑚3 x 0.50 = 2.54475 ≈ 3 𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel = 5.0895 𝑚3 ≈ 6𝒎𝟑

SECOND FLOOR:
H= 2.9m
VOLUME = L x W x H = 0.25 x 0.25 x 2.9 = 0.18125𝑚3 x 13 = 2.35625 𝑚3

FOR CEMENT: (CLASS A- 40KG)


# of bags = 2.35625 𝑚3 x 9 = 21.206 ≈ 22 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 2.35625 𝑚3 x 0.50 = 1.178125 ≈ 2 𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel = 2.35625 𝑚3 ≈ 3𝒎𝟑

@FOOTINGS
Volume = 1.80 m x 1.80 m x 0.30 m = 0.972 𝑚3
Total Volume = 0.972 𝑚3 x 13 = 12.636 𝑚3 ≈ 13𝑚3

FOUNDATION:
FOR CEMENT: (CLASS A- 40KG)
# of bags = 13𝑚3 x 9 = 117 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 13𝑚3 x 0.50 = 6.5 ≈ 7 𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel = 13𝒎𝟑

FOOTING TIE BEAM:


Total Length = 13(3) + 4.5 +5.5 +11(2) +12= 83m
Volume= 83m x 0.20m x 0.30m = 4.98𝑚3
FOR CEMENT: (CLASS A- 40KG)
# of bags = 4.98𝑚3 x 9 = 44.82 bags ≈ 45 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 4.98𝑚3 x 0.50 = 2.49 ≈ 3 𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel =4.98𝑚3 ≈ 5𝒎𝟑

@BEAMS AND ROOF BEAMS


Total Length = 13(3) +5.5(2) +4.5(2) + 11(4) = 103m x 2= 206m
Volume= 206m x 0.2 x 0.3 = 12.36 𝑚3

FOR CEMENT: (CLASS A- 40KG)


# of bags = 12.36 𝑚3 x 9 = 111.24 bags ≈ 112 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 12.36 𝑚3 x 0.50 = 6.18 ≈ 7𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel =12.36𝑚3 ≈ 13𝒎𝟑
SUMMARY: CONCRETE WORKS ESTIMATE

CONCRETE (bags) SAND (𝑚3 ) GRAVEL (𝑚3 )

COLUMNS 76 5 9
FOOTINGS/ 162 10 18
FOUNDATIONS
BEAMS AND 112 7 13
ROOF BEAMS

STEEL AND TINSMITHRY WORKS


Roofing
Roofing Sheets – Corrugated G.I. Sheets
12.6𝑚
# of Pieces = = 17.746 ≈ 18 Sheets
0.71

Total 12’ Roofing Sheets = 18 (5) = 90 sheets of 12’ Corrugated G.I. Roofing
Gutter
12.6𝑚
# of Plain G.I. sheets = (1.5) = 9 pcs. of Gutter
2.10

Flashing
33.3
# of Plain G.I. sheets = 2.10 (1.5) = 23.786 ≈ 24 pcs. of Flashing

TRUSS

@TOP CHORDS:
L= √(0.4 − 0.3)2 + (5.90)2 = 5.90m
5.90(2)(10)
# of Full-Length Bar Required = = 19.67
6.0
𝟏
# of Full-Length Bar Required = 20 - " x 4" x 4" x 6m Angle Bars
𝟒
@ BOTTOM CHORDS:
L= √(0.4 − 0.3)2 + (5.90)2 = 5.90m
5.90(2)(10)
# of Full-Length Bar Required = = 19.67
6.0
𝟏
# of Full-Length Bar Required = 20 - " x 4" x 4" x 6m Angle Bars
𝟒
@Web members
𝑋1 = 1.993 𝑚 𝑌1 = 0.367𝑚 𝑌4 = 0.4𝑚
𝑋2 = 1.998 𝑚 𝑌2 = 0.333 𝑚
𝑋3 = 2 𝑚 𝑌3 = 0.3 𝑚

Total Length = 1.993m + 1.998m + 2m + 0.367m + 0.333m + 0.4m = 7.091m


7.091(2)(10) 𝟏
# of Full-Length Bar Required = = 23.637 ≈ 24 - " x 2" x 2" x 6m Angle Bars
6.0 𝟒
PURLINS
L= 12.6m [ Single Purlin Length]
12.6
# of purlins = +1 = 16.75 m ≈ 17 pcs
0.8
12.6(17)
# of Full-Length Bar Required = = 35.7 ≈ 36- 1.5mm x 2" x 4" x 6m Cee Purlins
6

PURLIN CLEATS:
Cleats = ¼’’ x 2’’ x 2’’ x 6m Angle Bar
# of purlins cleats = 17 purlins (10 trusses) = 170 purlin cleats
170(0.1) 𝟏
# of Full-Length Bar Required = = 2.833 ≈ 3- " x 2" x 2" x 6m Angle Bars
6 𝟒

SUMMARY:
1 1 𝟏
20 - 4" x 4" x 4" x 6m Angle Bars + 20 - 4" x 4" x 4" x 6m Angle Bars = 40 - 𝟒" x 4" x 4" x 6m Angle
Bars

1 1 𝟏
24 - 4" x 2" x 2" x 6m Angle Bars + 3- 4" x 2" x 2" x 6m Angle Bars = 27- 𝟒" x 2" x 2" x 6m Angle
Bars

36- 1.5mm x 2" x 4" x 6m Cee Purlins


PROJECT NAME: PROPOSED TWO-STOREY RESIDENTIAL BUILDING
OWNER: ENGR. DANNY MAR NAIPA
LOCATION: TORIL, DAVAO CITY
UNIT TOTAL
DESCRIPTION QTY. UNIT COST COST

EARTHWORKS ₱ 12,472.00
EXCAVATION 73 CU.M. 64.00 4,672.00
GRAVEL BASE 70 CU.M. 60.00 4,200.00
BACKFILL 60 CU.M. 60.00 3,600.00
₱ 12,472.00

MASONRY AND CONCRETE WORKS ₱ 782,901.00


FOUNDATIONS
PORTLAND CEMENT 162 BAGS 248.00 40,176.00
WASHED SAND 10 CU.M. 650.00 6,500.00

GRAVEL BASE 18 CU.M. 700.00 12,600.00


12 MM Ø X 6 M DEF. ROUND BAR 44 LGTHS. 200.00 8,800.00

COLUMNS
PORTLAND CEMENT 76 BAGS 248.00 18,848.00
WASHED SAND 5 CU.M. 850.00 4,250.00
WASHED GRAVEL 9 CU.M. 700.00 6,300.00
10 MM Ø X 6 M DEF. ROUND BAR 82 LGTHS. 110.00 9,020.00
12 MM Ø X 6 M DEF. ROUND BAR 52 LGTHS. 200.00 10,400.00

BEAMS
PORTLAND CEMENT 112 BAGS 248.00 27,776.00
WASHED SAND 7 CU.M. 850.00 5,950.00
WASHED GRAVEL 13 CU.M. 700.00 9,100.00
10 MM Ø X 6 M DEF. ROUND BAR 137 LGTHS. 110.00 15,070.00
16 MM Ø X 6 M DEF. ROUND BAR 156 LGTHS. 400.00 62,400.00

CHB WALL
4" CHB (machine made) 1,955 PCS. 14.00 27,370.00
PORTLAND CEMENT 873 BAGS 248.00 216,504.00
WASHED SAND 55 CU.M. 1,600.00 88,000.00
10 MM Ø X 6 M DEF. ROUND BAR 414 LGTHS. 110.00 45,540.00
6" CHB 4,432 PCS. 18.00 79,776.00
16 MM Ø X 6 M DEF. ROUND BAR 52 PCS. 400.00 20,800.00

FORMWORKS
COCO LUMBER 1,859 BD.FT. 19.00 35,321.00
1/4"X4'X8' PLYWOOD 108 SHTS. 300.00 32,400.00

₱ 782,901.00

STEEL AND TINSMITHRY WORKS ₱ 117,741.00


TOP MEMBERS
1/4" X 2" X 2" X 6 M ANGLE BARS 20 LGTHS. 870.00 17,400.00
BOTTOM MEMBERS
1/4" X 2" X 2" X 6 M ANGLE BARS 20 LGTHS. 870.00 17,400.00
WEB MEMBERS
1/4" X 2" X 2" X 6 M ANGLE BARS 24 LGTHS. 870.00 20,880.00
PURLINS
1.50 MM THICK X 2" X 4" X 6 M G.I. CEE PURLIINS 36 LGTHS. 650.00 23,400.00

1/4" X 2" X 2" X 6 M ANGLE BAR - PURLIN CLEATS 3 LGTHS. 870.00 2,610.00
ROOFING
0.40 MM THICK PREPAINTED RIB-TYPE ROOF PANELS 90 LM 200.00 18,000.00
0.50 MM THICK X 2.40 M PREPAINTED GUTTTER 9 PCS. 547.00 4,923.00
0.50 MM THICK X 2.40 M PREPAINTED APRON FLASHING 24 PCS. 547.00 13,128.00
₱ 117,741.00

TOTAL= ₱ 913,114.00
SUMMARY
PROPOSED TWO-STOREY RESIDENTIAL BUILDING @ TORIL, DAVAO CITY

DESCRIPTION TOTAL COST


A. CIVIL WORKS

I. EARTHWORKS ….... ₱ 12,472.00

MASONRY AND CONCRETE


II. WORKS …..... ₱ 782,901.00

III. STEEL AND TINSMITHRY WORKS ….... ₱ 117,741.00

TOTAL MATERIAL COST …..... ₱ 913,114.00

IX. LABOR COST ₱ 273,934.20


TOTAL DIRECT COST ….... ₱ 1,187,048.20

GENERAL
X. REQUIREMENTS ₱ 50,000.00
₱ 1,237,048.20
ADD: 15% PROFIT …... ₱ 185,557.23

ADD: 2% CONTRACTOR'S TAX ….... ₱ 24,740.96

ADD:5% CONTINGENCIES …..... ₱ 61,852.41

ADD:12% VAT …..... ₱ 148,445.78


TOTAL COST ….... ₱ 1,657,644.59

SAY …...... ₱ 1,658,000.00

PREPARED BY: CHECKED & APPROVED BY:

LAO, THEA PHILLINE C. ENGR. DANNY MAR NAIPA


MANLIGAS, MARAIAH JONNA B.