Laot Manligas M 1
Laot Manligas M 1
Submitted by:
Lao, Thea Philline C.
Manligas, Maraiah Jonna B.
Submitted to:
Engr. Danny Mar T. Naipa
October 2021
PERSPECTIVE
Scale: NTS
A-1
YOUR DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA MANLIGAS PERSPECTIVE
LOGO
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
2
Su
2.
00
N b di
00
. 48 vis
3M °1 io
.7 5' n
, 22 0
0
0 W ,1
Ro
W 2.5 8. ad
°8' 34
52 M
.
S
2.
3
00
00
M .
S6
2°2 8.79
1 d
7' E E, a
,1 1' Ro
0
7.6 ° 1 n
00
6M 58 i s io
v
2.0
. N di
b
4 Su
PROPOSED TWO-STOREY RESIDENTIAL BLDG.
FLOOR AREA = 208 SQM
LOT AREA = 347.82 SQM
A-2
YOUR DANNY MAR T. NAIPA
LOGO ENGR. MARAIAH JONNA MANLIGAS SITE DEVELOPMENT PLAN
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
SITE
VICINITY MAP
Scale: NTS
A-3
YOUR DANNY MAR T. NAIPA
ENGR. MARAIAH JONNA MANLIGAS VICINITY MAP
LOGO
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
Y Y
A B C D A B C D
4.0000 5.0000 2.0000
4.0000 5.0000 2.0000
W W W W
W
0 3 0 1 0 3 0 3
0 1
1 1
LAUNDRY
D D
0 2
RESTROOM 2
0 2
W 4.5000
4.5000 0 1
BEDROOM RESTROOM 1 D
W 0 3
1 MASTER'S
0 1
BEDROOM
D
0 2
2 D D 2
W 0 2 0 3
D
W 0 3 0 1
0 1
D
0 4 W
X W W 3.0000
3.0000 X 0 1
0 1 0 1
D D
0 2 0 2
3
D 3 TERRACE
0 2 DOWN
W W
W
MAID'S 0 1 0 1
0 1
QUARTER
BEDROOM BEDROOM
2 3
5.5000
5.5000
4 4
W W
RAMP D W
0 1 0 1
0 1 PORCH 0 1 4.0000 2.5500 2.9500 1.5000
A-4
YOUR DANNY MAR T. NAIPA FLOOR PLANS
LOGO ENGR. MARAIAH JONNA MANLIGAS
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
A B C D
TOP OF RIDGE
COLORED GUTTER
1.9000
CEILING LINE
2.9000
CONCRETE HBW
WOODEN MOULDED DOOR
NARRA TYPE
1ST FFL
0.3000 FGL
TOP OF RIDGE
1.9000
1ST FFL
0.3000 FGL
TOP OF RIDGE
COLORED GUTTER
1.9000
CEILING LINE
2.9000
FGL
TOP OF RIDGE
COLORED GUTTER
1.9000
CEILING LINE
2.9000
FGL
TOP OF RIDGE
CEILING LINE
2.9000
CONCRETE HBW
3.1500
0.3000
1ST FFL
FGL
1.4500 0.5000
0.4000
0.5000
1.3000
0.8500
2.0000 1.6500
4.8000
4.0000
3.1500
0.9000 1.3000
0.5000
3.0000
3.1500
1.6500
1ST FFL 1ST FFL 1ST FFL 1ST FFL 1ST FFL
W WINDOW-2 W
WINDOW-2
W WINDOW-1 0 2
0 1 GLASS WINDOWS 0 3 AWNING WINDOW
GLASS WINDOWS
0.5X0.5M UPVC AWNING WINDOW,
1.3X1.45M UPVC SLIDING WINDOW, 2X0.5M GLASS WINDOW, ALUMINUM TINTED GLASS
ALUMINUM TINTED GLASS SOLID GLASS
0.9000 2.0000
0.9000
FFL
A-6
YOUR DANNY MAR T. NAIPA DETAILS OF DOORS
LOGO ENGR. MARAIAH JONNA MANLIGAS AND WINDOWS
CIVIL ENGINEER TORIL, DAVAO CITY OWNER
A B C D
TOP OF RIDGE
1.9000
CEILING LINE
MASTER'S
2.9000 BEDROOM RESTROOM 2
2ND FFL
RESTROOM 1
BEDROOM
3.1500
1 KITCHEN
0.3000
1ST FFL
FGL
CROSS SECTION
Scale: NTS
TOP OF RIDGE
1.9000
CEILING LINE
TOILET &
BATH
2.9000
BEDROOM
2
2ND FFL
0.3000
1ST FFL
FGL
LONGITUDINAL SECTION
Scale: NTS
A B C D
4.0000 5.0000 2.0000
C1 F1 F1 C1 F1
C1 C1 1
F1 FTB FTB
FTB
FTB
FTB
FTB
4.5000
FTB
F1
C1 FTB C1 C1
2
F1 FTB
F1
FTB
X 3.0000
F1 13.0000
C1 C1
3
F1
FTB
0.70m O.C.
FTB
FTB
5.5000
F1
C1 C1 FTB C1 C1
4
F1 F1 F1 FOUNDATION PLAN
11.0000
Scale: NTS
FFL
125mm SLAB
NGL
NATURAL FILL
300mm 1.80m
300mm
100mm
1.80m
1.80m
F1 - C1 DETAILS
SCALE:
B-1
C1 C1 C1
C1
S1
S1 S1 S1 4.5000
S1
C1
C1 C1
B-8
S1 S1 3.0000
S1 5.5000
S1 S1 OPEN
AREA
B-4
TRUSS
TRUSS TRUSS 10MM PLAIN ROUND BAR SAG ROD
RB-2
X RB-5 3.0000
5.5000
RB-4
10 MM DIAMETER PLAIN ROUND BAR
CROSS BRACING
TRUSS TRUSS
RB-3
DESIGNING PROFESSIONAL: PROPOSED TWO - STOREY SHEET N0.
SCHOOL BUILDING
ENGR. THEA PHILLINE LAO
S-5
DANNY MAR T. NAIPA ROOF FRAMING PLAN
ENGR. MARAIAH JONNA MANLIGAS
TORIL, DAVAO CITY OWNER
CIVIL ENGINEER
Y
12.6000
A B C D
4.0000 5.0000 2.0000
6.1000 4.5000
FLAT ROOF
X 4.0000 3.0000
14.6000
ROOF PLAN
3
Scale: NTS
FLAT ROOF
8.5000
5.5000
4 50 MM PLAIN COLORED
ROOF SHEET
TERRACE
MAID'S
QUARTER
BEDROOM BEDROOM
2 3 DOWN
UP
RAMP
PORCH
EA
AR
IN
G UP
LIV
H
RC
PO
E
R AG
GA
MP
RA
PLUMBING LINE
ISOMETRIC DETAIL
Scale: NTS
BEDROOM
RESTROOM 1 RESTROOM 2
1
MASTER'S
BEDROOM
TERRACE
MAID'S
QUARTER
BEDROOM BEDROOM
2 3 DOWN
UP M
RAMP
PORCH
GROUND FLOOR
CLEAN OUT DETAIL
Scale: NTS FLOOR DRAIN DETAIL
Scale: NTS
1
OM
RO
ST
RE
M DR
Y
UN
LA
'S ER
ID RT
MAQUA
M
OO M
DR 1
BE
EA
AR
NG UP
I
LIV
H
RC
PO
GA
RA
GE
WATER LINE
RA
MP
ISOMETRIC DETAIL
Scale: NTS
BEDROOM RESTROOM 2
RESTROOM 1
1 MASTER'S
BEDROOM
TERRACE
MAID'S
QUARTER
BEDROOM BEDROOM
2 3 DOWN
UP
RAMP
PORCH
Y
DR
UN
LA
'S ER
ID RT
MAQUA
M
OO
DR 1
BE
EA
AR
G UP
IN
LIV
RCH
PO
GA
RA
GE
STORM DRAIN
ISOMETRIC DETAIL
Scale: NTS
PLAN PLAN
Ø
Ø OUTLET INLET
AIR SPACE AIR SPACE
EARTH
DIGESTIVE LEACHING EARTH
Ø CHAMBER CHAMBER 2
Ø
Ø
AIR
SPACE
EARTH
EARTH
SLUDGE PIT
GRAVEL BASE
GRAVEL BASE
SPOT DETAIL
WALL FOOTING
AEXTERIOR = 0.60m x 0.25m = 0.15m2
1.80−0.30
X= 2
= 0.75m
300mm
@COLUMNS
Column Dimension:
300mm
12817.44 in3
No. of Lumber = 3 = 16.68 ≈ 17 pieces per column
768 in ⁄piece
144in3
2 sheets x 29.67 bd. ft.⁄sheet = 59.34 bd. ft. x 1bd.ft. = 8544.96 in3
8544.96 in3
No. of Lumber = 3 = 14.835 ≈ 15 pieces per column
576 in ⁄piece
BEAMS
P = 2d +b+ 0.10= 2 (0.30) +0.2+0.10= 0.9m
Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet
B-6:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
ROOF BEAM
P = 2d +b+ 0.10= 2 (0.3) +0.2+0.10= 0.9m
▪ Plywood: Use ¼” x 4’ x 8’
2
AreaPlywood = 1.2m x 2.4m = 2.88 m ⁄sheet
@RB-1:
4m + 5m + 2m + 0.30m + 0.35m = 11.65m > 6m (CONTINUOUS BEAM)
@RB-2:
4.5m + 3m + 5.5m + 0.30m + 0.35m = 13.65m > 6m (CONTINUOUS BEAM)
10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece
@RB-3:
5m + 2m + 0.30m + 0.35m = 7.65m > 6m (CONTINUOUS BEAM)
10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece
@RB-4:
3m + 5.5m + 0.30m + 0.35m = 9.15m > 6m (CONTINUOUS BEAM)
A= 0.9m x (3.7m + 4.7m + 1.7m) = 9.09 m2
9.09 𝑚2
# of Plywood = 2 = 3.156≈ 4 sheets
2.88 m ⁄sheet
▪ Framing: Use 2” x 2” x 14’ (4.20 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (14ft x 1ft ) = 672 in ⁄piece
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 21.48 ≈ 22 pieces
672 in ⁄piece
@RB-5:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
A= 0.9m x (4.2m + 2.7m + 5.2m) 10.89 m2
10.89 m2
No. of Plywood = 2 = 3.781 ≈ 4 sheets
2.88 m ⁄sheet
Framing: Use 2” x 2” x 10’ (3.0 m) Lumber
12in 3
Lumber Volume = 2in x 2in x (10ft x ) = 480 in ⁄piece
1ft
6mm thk. plywood multiplier = 25.06 bd. ft.⁄sheet
144in3
4 sheets x 25.06 bd. ft.⁄sheet = 100.24 bd. ft. x = 14434.56 in3
1bd.ft.
14434.56 in3
No. of Lumber = 3 = 30.072 ≈ 31 pieces
480 in ⁄piece
@RB-6:
4.5m + 0.30m + 0.35m = 5.15m < 6m (ONE SPAN BEAM)
FTB
P = 2d +b+ 0.10= 2 (0.30) +0.2+0.10= 0.9m
93824.64 in3
No. of Lumber = 3 = 139.62 ≈ 140 pieces
672 in ⁄piece
SUMMARY
1 bd.ft.
14’ (672 in3) = 22+22+22+66+44 +140= 316 pieces x (672 in3 x ) = 1475 bd.ft.
144 in3 .
1 bd.ft.
20’ (960 in3) = 8 = 8 pieces x (960 in3 x ) = 54 bd.ft.
144 in3.
@RB-4:
3m + 5.5m + 0.30m + 0.35m = 9.15m > 6m (CONTINUOUS BEAM)
1 (9.15)(6.6)
# of FLB req. = = 10.065 ≈ 11 lengths
6
@RB-5:
4m + 0.30m + 0.35m = 4.65m < 6m (ONE SPAN BEAM)
6𝑚
# of FLB req. = 4.65𝑚 = 1.290m ≈ 1pc. (6) = 6 lengths
@RB-6:
4.5m + 0.30m + 0.35m = 5.15m < 6m (ONE SPAN BEAM)
6𝑚
# of FLB req. = = 1.165m ≈ 1pc. (6) = 6 lengths
5.15𝑚
𝐿−2(𝑆1𝑛1+𝑠2𝑛2+𝑠3𝑛3)
N = 2 (n1 + 1) + 2n2 + 2n3 + [ ]
𝑠4
@B-1 & B-4: L1 = 3.7m; L2 = 4.7m; L3 = 1.7m
3.7−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 30
0.200
4.7−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 35
0.200
1.7−2(0.050(1)+0.100(6)+0.150(4))
NL3 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 20
0.200
Total # of Stirrups (B-1 & B-4) = 30 + 35 + 20 = 85 (2) = 170 pcs.
@B-2 & B-5: L1 = 4.2m; L2 = 2.7m; L3 = 5.2m
4.2−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 32.5 ≈ 33
0.200
2.7−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 25
0.200
5.2−2(0.050(1)+0.100(6)+0.150(4))
NL3 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 37.5 ≈ 38
0.200
Total # of Stirrups (B-2 & B-5) = 33 + 25 + 38 = 96 (2) = 192 pcs.
@B-3: L1 = 4.2m; L2 = 8.2m
4.2−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 32.5 ≈ 33
0.200
8.2−2(0.050(1)+0.100(6)+0.150(4))
NL2 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 52.5 ≈ 53
0.200
Total# of Stirrups (B-3) = 33 + 53 = 86 pcs.
@B-6: L = 3.7m
3.7−2(0.050(1)+0.100(6)+0.150(4))
NL = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 30 pcs.
0.200
@B-7 & B-8: L = 6.7m
6.7−2(0.050(1)+0.100(6)+0.150(4))
NL1 = 2 (1 + 1) + 2(6) + 2(4) + [ ] = 45
0.200
Total # of Stirrups (B-7 & B-8) = 45 (2) = 90 pcs.
SUMMARY
COLUMN REINFORCEMENT
• Lateral Ties
➢ Spacing of Ties:
Vertical Bar ⌀ = 16mm ⌀
Lateral Ties = 10mm ⌀
Column Width = 0.3m
a. 16 x 16 = 256mm ⌀
b. 48 x 10 = 480mm ⌀
c. 300mm
FOOTING REINFORCEMENT
Number of Footing = 13 Footings
L = 1.80 – 0.075 (2) = 1.65m
# of bed bars/footing = 5+5 = 10 pcs.
Total Number of Bed Bars = 10 (13) = 130 pcs.
*Using 12mm ⌀ x 6.0 m def. bars:
6
# of Cuts/ F.L.B. = 1.65 = 3.63 pcs ≈ 3 pcs/ F.L.B.
130 𝑝𝑐𝑠
# of Full-length bars = 3 𝑝𝑐𝑠 =43.33 ≈ 44 Full – Length bars
𝐹.𝐿.𝐵.
Number of Full-length bars= 44 – 12mm ⌀ x 6.0m full length bars
CHB REINFORCEMENT
Vertical Reinforcement
Spacing @ 60 cm – 2.13 per sq. m
Total Length of Vertical Reinforcement = 464.439 m2 (2.13m/m2 ) = 989.255m
Horizontal Reinforcement
At every 3 Layers – 2.15 per sq. m
Total Length of Horizontal Reinforcement = 464.439 m2 (2.15m/m2 ) = 998.5439m
SUMMARY:
CEMENT MORTAR:
For Exterior Walls: 6” CHB
Total AEXTERIOR = 322.315m2
@Cement: CLASS A (40kg)
# of bags = 322.315m2 (1.526) = 491.853 ≈ 492 bags
@Sand: CLASS A
VSAND = 322.315m2 (0.0844) = 27.203 ≈ 30m3 of sand
For Interior Walls: 4” CHB
Total AINTERIOR = 142.124m2
@Cement: CLASS A (40kg)
# of bags = 142.124m2 (0.792) = 112.562 ≈ 113 bags
@Sand: CLASS A
VSAND = 142.124m2 (0.0435) = 6.182 ≈ 10m3 of sand
PLASTERING:
Total Area (Exterior + Interior) = 322.315m2 + 142.124m2 = 464.439m2
@Cement: CLASS A (40kg) – 16mm thick (double side)
# of bags = 464.439m2 (0.288) (2) = 267.517 ≈ 268 bags
@Sand: CLASS A – 16mm thick (double side)
VSAND = 464.439m2 (0.016) (2) = 14.862 ≈ 15m3 of sand
SUMMARY:
CONCRETE WORKS
@COLUMNS
FIRST FLOOR:
H= 1.2 + 3.150 + = 4.35m
VOLUME = L x W x H = 0.30 x 0.30 x 4.35 = 0.3915𝑚3 x 13 = 5.0895 𝑚3
SECOND FLOOR:
H= 2.9m
VOLUME = L x W x H = 0.25 x 0.25 x 2.9 = 0.18125𝑚3 x 13 = 2.35625 𝑚3
@FOOTINGS
Volume = 1.80 m x 1.80 m x 0.30 m = 0.972 𝑚3
Total Volume = 0.972 𝑚3 x 13 = 12.636 𝑚3 ≈ 13𝑚3
FOUNDATION:
FOR CEMENT: (CLASS A- 40KG)
# of bags = 13𝑚3 x 9 = 117 bags
FOR SAND: (CLASS A- 40KG)
Volume of Sand= 13𝑚3 x 0.50 = 6.5 ≈ 7 𝒎𝟑
FOR GRAVEL: (CLASS A- 40KG)
Volume of Gravel = 13𝒎𝟑
COLUMNS 76 5 9
FOOTINGS/ 162 10 18
FOUNDATIONS
BEAMS AND 112 7 13
ROOF BEAMS
Total 12’ Roofing Sheets = 18 (5) = 90 sheets of 12’ Corrugated G.I. Roofing
Gutter
12.6𝑚
# of Plain G.I. sheets = (1.5) = 9 pcs. of Gutter
2.10
Flashing
33.3
# of Plain G.I. sheets = 2.10 (1.5) = 23.786 ≈ 24 pcs. of Flashing
TRUSS
@TOP CHORDS:
L= √(0.4 − 0.3)2 + (5.90)2 = 5.90m
5.90(2)(10)
# of Full-Length Bar Required = = 19.67
6.0
𝟏
# of Full-Length Bar Required = 20 - " x 4" x 4" x 6m Angle Bars
𝟒
@ BOTTOM CHORDS:
L= √(0.4 − 0.3)2 + (5.90)2 = 5.90m
5.90(2)(10)
# of Full-Length Bar Required = = 19.67
6.0
𝟏
# of Full-Length Bar Required = 20 - " x 4" x 4" x 6m Angle Bars
𝟒
@Web members
𝑋1 = 1.993 𝑚 𝑌1 = 0.367𝑚 𝑌4 = 0.4𝑚
𝑋2 = 1.998 𝑚 𝑌2 = 0.333 𝑚
𝑋3 = 2 𝑚 𝑌3 = 0.3 𝑚
PURLIN CLEATS:
Cleats = ¼’’ x 2’’ x 2’’ x 6m Angle Bar
# of purlins cleats = 17 purlins (10 trusses) = 170 purlin cleats
170(0.1) 𝟏
# of Full-Length Bar Required = = 2.833 ≈ 3- " x 2" x 2" x 6m Angle Bars
6 𝟒
SUMMARY:
1 1 𝟏
20 - 4" x 4" x 4" x 6m Angle Bars + 20 - 4" x 4" x 4" x 6m Angle Bars = 40 - 𝟒" x 4" x 4" x 6m Angle
Bars
1 1 𝟏
24 - 4" x 2" x 2" x 6m Angle Bars + 3- 4" x 2" x 2" x 6m Angle Bars = 27- 𝟒" x 2" x 2" x 6m Angle
Bars
EARTHWORKS ₱ 12,472.00
EXCAVATION 73 CU.M. 64.00 4,672.00
GRAVEL BASE 70 CU.M. 60.00 4,200.00
BACKFILL 60 CU.M. 60.00 3,600.00
₱ 12,472.00
COLUMNS
PORTLAND CEMENT 76 BAGS 248.00 18,848.00
WASHED SAND 5 CU.M. 850.00 4,250.00
WASHED GRAVEL 9 CU.M. 700.00 6,300.00
10 MM Ø X 6 M DEF. ROUND BAR 82 LGTHS. 110.00 9,020.00
12 MM Ø X 6 M DEF. ROUND BAR 52 LGTHS. 200.00 10,400.00
BEAMS
PORTLAND CEMENT 112 BAGS 248.00 27,776.00
WASHED SAND 7 CU.M. 850.00 5,950.00
WASHED GRAVEL 13 CU.M. 700.00 9,100.00
10 MM Ø X 6 M DEF. ROUND BAR 137 LGTHS. 110.00 15,070.00
16 MM Ø X 6 M DEF. ROUND BAR 156 LGTHS. 400.00 62,400.00
CHB WALL
4" CHB (machine made) 1,955 PCS. 14.00 27,370.00
PORTLAND CEMENT 873 BAGS 248.00 216,504.00
WASHED SAND 55 CU.M. 1,600.00 88,000.00
10 MM Ø X 6 M DEF. ROUND BAR 414 LGTHS. 110.00 45,540.00
6" CHB 4,432 PCS. 18.00 79,776.00
16 MM Ø X 6 M DEF. ROUND BAR 52 PCS. 400.00 20,800.00
FORMWORKS
COCO LUMBER 1,859 BD.FT. 19.00 35,321.00
1/4"X4'X8' PLYWOOD 108 SHTS. 300.00 32,400.00
₱ 782,901.00
1/4" X 2" X 2" X 6 M ANGLE BAR - PURLIN CLEATS 3 LGTHS. 870.00 2,610.00
ROOFING
0.40 MM THICK PREPAINTED RIB-TYPE ROOF PANELS 90 LM 200.00 18,000.00
0.50 MM THICK X 2.40 M PREPAINTED GUTTTER 9 PCS. 547.00 4,923.00
0.50 MM THICK X 2.40 M PREPAINTED APRON FLASHING 24 PCS. 547.00 13,128.00
₱ 117,741.00
TOTAL= ₱ 913,114.00
SUMMARY
PROPOSED TWO-STOREY RESIDENTIAL BUILDING @ TORIL, DAVAO CITY
GENERAL
X. REQUIREMENTS ₱ 50,000.00
₱ 1,237,048.20
ADD: 15% PROFIT …... ₱ 185,557.23