Professional Documents
Culture Documents
Aqfanisa, Journal Manager, 10592-37563-1-RV
Aqfanisa, Journal Manager, 10592-37563-1-RV
ABSTRACT
Production wells have to be evaluated periodically, one of the problems that can occur is early
water problems. Using X-Plot, Chan’s Diagnostic Plot, Decline Curve Analysis and Hall Plot analysis
be able to detect RN-01 and RN-02 wells experienced multilayer channeling and RN-03 experienced
normal displacement with high WOR.
Keywords: Water Chaneling, X-Plot, Chan’s Plot, Hall Plot, Decline Curve Analysis
WOR/WOR'
analyze the injection performance in the 10
1
injection well and analyze the problems that
0,1
occur in the well and conclude whether the
0,01 Positive Slope
injection well is efficient or not. Hall's analysis 0,001
of the plot was done by plotting the injection Sep-11 Apr-12 Oct-12 May-13
Time
Nov-13 Jun-14 Dec-14
This analysis also supported by the Figure 14. Chan’s Diagnostic Plot RN-03
results of Hall Plot analysis which showed that
the well have negative skin or injecting above X-Plot analysis of the RN-03 well
parting pressure. shows that the well has no slope that indicates
that there is no layering as shown in Figure 15.
X-Plot RN-03
33,5
Cum. Oil Prod (STB) x 10000
33
32,5
32
-2,04 -2,05 -2,05 -2,10
X
production so that conclude that RN-03 wells 2. To find out the problems that occur in a
can be convert to injection wells. production well that has high water
production problems we can analyze by
plotting between production rate vs. time to
find out the production capabilities of the
well. X Plot can be used to evaluate
waterflood performance and diagnose
layering in multilayered systems, Chan’s
Water Diagnostic Plot is also used to analyze
water behavior problems in wells, otherwise
Decline Curve Analysis is used to determine
the production age of the well until reach its
Figure 16. Qo vs Time RN-03
economic limit rate and Hall plot method is
After being converted into an injection used to analyze injection performance at
well, an analysis of the rate of water injection and injection wells.
well pressure in the RN-03 well showed that the 3. The RN-01 and RN-02 wells has Multilayer
improvement of the well was normal. Channeling and RN-03 is Normal
Displacement with High WOR.
DAFTAR PUSTAKA
Alexis, E.-A. O. (2010). Diagnostic Plots
for Analysis of Water Production and
Reservoir Performance. Abuja-
Nigeria: African University of Science and
Technology.
Chan Chan, K. (1995). Water Contol
Diagnostic
Data Perhitungan Kinerja Produksi Minyak
Figure 17. Water injection rate and pressure vs dengan Metode Decline Curve Analysis.
Time RN-03 (n.d.). Retrieved from Repository Trisakti.
Do, N. V. (2020). Applications of the Hall
This analysis is supported by the results Plot Method For Monitoring and Prediction
of Hall Plot analysis which showed that the well of PWRI Performance. Retrieved from
was stable. Applications of the Hall Plot Method For
Monitoring and Prediction of PWRI
Performance
I. Ershaghi, L. H. (1988). Application of
the x-Plot Technique to the Study of Water
Influx in the Sidi EI-Itayem Reservoir,
Tunisia. Journal of Petroleum Technology.
Irwin, R. W. (2015). PENENTUAN ISI
AWAL MINYAK DAN PERAMALAN
PRODUKSI NYA DENGAN DECLINE
CURVE ANALYSIS DI LAPANGAN
“R”. Seminar Nasional Cendekiawa
Yang, Z. (2009). A New Diagnostic Analysis
Figure 18. Hall Plot RN-03 Method forWaterflood Performance. SPE,
V. Aera Energy LLC.
Yang, Z. (2017). Clarifying and Improving
CONCLUSION the Application of Waterflood Analytical
Methods in X-plot Conditions – from
1. By using only production data, monitoring and
Empirical Approach to Analytical
evaluating wells can be done effectively.
Approach. California: SPE International.