ू ी/AGENDA
काययसच
8.2 CGS/IPP Units under Maintenance from previous months (as on 30.09.2022):
Availed No. of
Station Unit MW Till date Remarks
From Days
IL & FS, IPP 1 600 29.08.2022 05.10.2022 38 COH
KGS 2 220 04.09.2022 18.10.2022 45 Biennial shutdown
(b) NTPC RSTPS vide letter dated 27.09.2022 (Annexure-8) has requested
preponement of OH of Unit-6 from 15.10.2022 for 35 days in view of Reliability and
safety of unit
(c) NTPC Simhadri STPS vide email dated 28.09.2022 informed that unit -2 AOH OCC
approved schedule is from 10th November to 14th December 2022 ( 35 days ).
Recently there is a shift in TG bearing vibration and maintaining at higher levels. In
view of this it is proposed to prepone Unit-2 AOH tentatively from 28th October
2022 to 1st December 2022 (35 days). This is for your kind information and
necessary concurrence.
It may please be noted that the many units are planned for maintenance during
the month of November 2022.
Utilities are requested to consider shifting of some of the unit so that revival of
the unit by 14th January 2023.
This may be deliberated.
ii. The list of outages of Transmission Lines and Elements, proposed for November 2022, will be
mailed to OCC Google Group after closing the outage submission window on 03.10..2022
(24:00 hr) in the outage Portal.
iii. All the entities including generators are requested to ensure participation of their repre-
sentatives in the Outage Coordination Meeting scheduled on 11.10.2022 through VC.
(iii) Each SLDC shall submit LGBR for its control area, for peak as well as off-peak
scenario, by 31st October 2022 for the financial year 2022-23 to SRPC Secretariat..
The utilities to furnish the required data in the prescribed format circulated
by SRPC for the financial year 2022-23 by 31.10.2022.
(ii) SRPC vide letters dated 17.08.2022 had requested the utilities concerned that needful may
please be done to put the elements into operation immediately for smooth and secure grid
operation. If any further delay is anticipated, the likely date for taking into service of the
elements may please be communicated with the reason for delay etc.
(iii) The prolonged outage of the elements is a matter of serious concern as the outage of elements
likely to cause danger to optimal operation of the grid operation.
(iv) The following had been noted in the 194th Meeting of OCC (12.09.2022):
(b) TANTRANSCO:
Estimate
400/110kV Salem_TN- 08th June 2018 R Phase
1 sanctioned and
ICT-4 10:00 Hrs Bushing Burst
allotment awaited
Put back in to
400/110kV Salem_TN- 16th September Buchholz
4 service on
ICT-5 2021 22:50Hrs Alarm
12.08.2022
Tanking of coil
th R Phase
400/230kV Alamathy- 05 November assembly at
5 Transformer
ICT-3 2021 07:27Hrs factory premises
Blasted
within one week
(c) KPTCL:
SRPC has arranged spare transformer from PGCIL but the arrangement was not accepted
by KPCL higher management and they opted for restoration by repairing the ICT.
KPTCL had convened a meeting on 16.08.2022 (Minutes of the Meeting , wherein the fol-
lowing had been concluded in respect of ICT at RTPS:
KPCL to explore the option of seeking spare ICT from PGCIL to restore normalcy, consi-
dering the repairs to ICT will take 8 months on finalization of the tender by KPCL.
KPCL can look in to the option of moving an under loaded ICT at BTPS also if feasible.
TCC had advised NPCIL to expedite restoration of ICT and also to maintain spare ICT at KGS in com-
pliance of CEA Regulations.
(iv) MS, SRPC vide letter dated 26.09.2022(Annexure-10a) has taken up the issue with ACE
(Trans &Elec), NPCIL.
15. NLDC Operation feedback on Transmission Constraints for the quarter April
to June 2022
In the NLDC Operational Feedback on Transmission Constraints (Apr-June 2022), available on
NLDC website, the following constraints in import of states and remedial action to mitigate the
constraints were mentioned:
(a) Constraints in Import of States:
APTRANSCO had agreed to take up with planner for augmentation of 315 MVA to
500 MVA.
vanhalli S/s
400/220 kV 2X500 3rd 500 MVA ICT Kolar is 3rd ICT commission to be
MVA ICTs at Kolar SS approved expedited by PGCIL.
PGCIL : By June 2023
400/220 kV 3X500 3rd 500 MVA ICT at Devan-
MVA ICTs at Hoody halli S/s under implementa-
SS tion. This will help in reduc-
ing loadings on Hoody ICTs
400/220 kV 3X500 400/220 kV (3x500 MVA) Domasandra S/s is under
MVA ICTs at Somana- Mylasandra SS commis- implementation and with
halli sioned. Presently Somanahalli commissioning of Domma-
ICT loadings are reduced. sandra would further re-
400/220 kV Domasandra S/s duce loading on Somanahal-
is under implementation and li ICTs
with commissioning of
Dommasandra would further
reduce loading on Somanahal-
li ICT's
MS, SRPC requested further that comprehensive plan may be framed and issue related
to state network can be communicated to CEA and related to ISTS network to CTUIL for
necessary action. KPTCL informed that in co-ordination with higher management all
the issues are being addressed and necessary action taken up shortly.
18. Conversion of fixed line reactor at Raichur TPS end of Veltoor–Raichur 400
kV S/c line into switchable line reactor with inter trip scheme
(i) In the 3rd meeting of Southern Regional Power Committee (Transmission Planning)
[SRPC(TP)] held on 24.08.20201, it was agreed that KPTCL will take up the matter with
KPCL for converting 50 MVAR fixed line reactor installed at Raichur TPS end of Veltoor
- Raichur 400 kV S/c line into switchable line reactor with inter -trip scheme in view of the
resonance phenomena reported by SRLDC during tripping of the line.
(ii) In the 194th Meeting of OCC (12.09.2022) the following had been noted:
KPTCL had informed that they had sent a proposal to KPTCL protection wing to verify
the PSDF funding. Some queries are raised by protection wing which is yet to be clari-
fied by KPCL.
KPTCL had informed that KPCL have requested for appraisal from KPTCL and during
last week a discussion had taken place with concerned KPTCL wing and office note is
being arranged by them. It is expected that within 10 day’s appraisal will be received
from KPTCL. Accordingly (after STU approval) NLDC will be approached for funding
through PSDF.
KPCL/KPTCL may update the status.
22. Status of Bus and line reactors of State utilities and CGS
APTRANSCO
Sl. Substation MVAR No. Total Type Approved Update
No Capacity MVAR in (194thOCC)
(400kV)
1 Talapalayam 125 1 125 39th SC By September 2022
GIS (VJA)
2 Hindupur 125 1 125 Bus 1st SRSCT Adm. approval issued
on 01.06.22 and
tender will be called
soon.
3 Gudigudem 125 1 125 Bus 2nd SRSCT LI S/S . Under
process. Details are
sought from field
APGENCO
Sl. Substation MVAR No. Total Type Approved in Update
No Capacity MVAR (194th OCC)
(400kV)
PSDF funding
1 VTPS Stage IV 125 1 125 Bus 39th SC is sought, not
sanctioned yet.
Polavaram Included in
2 125 2 250 Bus 42nd SC
HEP EPC contract
KPCL
Sl. Substation MVAR No. Total Type Approved Update
No Capacity MVAR in (194th OCC)
(400kV)
KPCL informed that DPR and estimate had been approved by HO and the same had been
submitted for appraisal from STU-KPTCL. KPTCL had sought some clarifications which are
being furnished. Accordingly (after STU approval) NLDC will be approached for PSDF
funding. SRPC requested KPTCL to facilitate the same. KPTCL ensured that they will
coordinate with KPCL and approval will be accorded shortly.
TANTRANSCO
SI.No. Substation MVAR Type Approved in Status
(letter dated 3.9.22/194th OCC)
1 Alamathv 1x125 Bus 39thSC Commissionedon11.02.2022
Proposed to be commissioned
2 Kayathar 1x125 Bus 39thSC
before 31.08.2022
1 No. commissioned on
3 Kamuthi 2x80 Bus 39thSC 07.05.2022. and another
commissioned on 29.07.2022
4 2X330 Bus 42ndSC Work under progress. Expected
Virudhunagar
to be
5 (765 kV) 2X330 Line 42ndSC commissionedduring2023-24.
14 Proposedtobechargedduring20
Korattur 2x125 Bus 2ndSRSCT
23-24
15 1 No. Commissioned on
Manali 2x125 Bus 2ndSRSCT 31.01.22 &another on
02.02.22
Unitcommissionedon19.12.20
16 Guindy 2x125 Bus 2ndSRSCT
20
17 Ottiyambakka Tobetaken up.
m
2x125 Bus 2ndSRSCT
18 Programmedtobecommiss
Pulianthope lx125 Bus 2ndSRSCT ionedduring September,
2022.
19 Status maybeobtained
nd
Alamathy 1x125 Bus 2 SRSCT fromO/o the SE/System
Studies
1x80MVAR under
nd implementation. Proposed
20 Vellalaviduthi 1x125 Line 2 SRSCT
tobe commissioned during
2022-23
Note:1.Items:6,7,8,10,11,17,19-Constructionworkyettobestarted
2.Items: 2,4,5,13,14,18,20-work under process (Item 12to beremove from the
list replaced by the item 20)
TANGEDCO
Sl. Substation MVAR No. Total Type Approved Update
No Capacity MVAR in (194 OCC)
(400kV)
Proposed to be
1 Mettur 125 1 125 Bus 39th SC
commissioned
before 30.09.2022
LoA issued on
4 Vettam 125 1 125 Bus 1st SRPC (TP) 01.12.2021
KGS had placed Purchase Order to a party in Gujarat with a delivery period of one year. No
bidders are coming up with proposals for erection and commissioning. They requested PGCIL to
help in this regard.
In the 193rd meeting of OCC, SRPC had suggested KGS to appropriately take up with PGCIL
SR-II/KPTCL and requested SR-II/KPTCL to extend possible assistance in this regard to get the
works expedited.
(ii) At any point of time injection of MVAR shall be strictly avoided if voltages are higher
than rated voltages. Tap position to be relooked wherever found feasible.
(iii) All the generators to analyze MVAR interchange on monthly basis and address the issues,
if any, with intimation to SRLDC/SRPC.
(iv) SLDCs/state generators to submit the MVAR analysis promptly and to present in the
performance analysis Meetings.
(v) In the 194th Meeting of OCC, all the SLDCs agreed to present MVAR performance
analysis of the generators in their control area in the special meeting to be convened
during October 2022.
ii. The following units’ reports submitted by the generators will be analyzed in a separate
meeting:
iii. The following units due for PSS Tuning/ returning may please be carried out and the
report to be submitted to SRPC/SRLDC at the earliest:
13.01.2016
AP
Unit-1 13.01.2019
O
Unit-7 17.12.2015
02.08.2022
02.08.2019
Unit-8 19.11.2015
15.03.2019 15.03.2022
Yeramarus TPS Unit-1
(2x800MW) Unit-2
23.10.2016
Unit-1 17.10.2022
17.10.2019
23.10.2016
Unit-2 17.10.2022
Varahi UGPH 17.10.2019
(4x115 MW) 24.07.2017
Unit-3 18.10.2022
18.10.2019
23.10.2016
Unit-4 18.10.2022
KPCL
18.10.2019
Unit-1 4/5.01.201 04.01.2020
7
Unit-6 23.12.2016
available for
June 2021
comparison )
Unit-7 23.12.2016
17.06.2021
TPS-IExpn. Unit-1 12.10.2015 12.10.2018
(2x210 MW) Unit-2 05.11.2015 05.11.2018
TPS-IIExpn. Unit-1 19.04.2017 19.04.2020
(2x250 MW) Unit-2 19.04.2017 19.04.2020
NNTPS Unit-1 03.12.2021 Report submitted for
(2x500 MW) Analysis
NTPL NLC&TNJV(2x500MW) Unit-1 24.05.2017 24.05.2020
Unit-2 02.08.2017 02.08.2020
N PCIL
20.11.2018
22.02.2019
KGS Unit-1 22.02.2022
22.09.2019
(4x220 MW) Unit-2 12.03.2017 12.03.2020
KKNPP 01.02.2016
(2x1000 MW) Unit-1 22.05.2022
22.05.2019
SEILP-I(TPCIL) Unit-1 23.12.2016 23.12.2019
Unit-2 30.11.2017 30.11.2020
(2x660 MW)
SEILP–II(SGPL) Unit-1 14.06.2018
02/03.08.2022 Report submitted
(2x660 MW) Unit-2 14.06.2018 for Analysis
02/03.08.2022
ISTS-IPPs
The Utilities may update the action taken for PSS Tuning.
iv. The following had been noted in the 194th Meeting of OCC:
(a) APGENCO had informed that offers have been received from Solvino(SDSTPS, RTPS
and VTPS-500/800 MW units) and the same have been submitted to Higher Management
for approval.
(d) TS SLDC had informed that a work shop is planned at KTPS and accordingly action will
be taken up to carry out the testing.
Andhra Pradesh/ Two bids have been received. Technical analysis is being taken up.
APTRANSCO Price bid to be opened within 10 days.
Karnataka/ Work under progress. Will go live in other three to four months.
KPTCL
Kerala/ Energy meters have been ordered. DLMS test is awaited from
CPRI. Tender floated for software part and would be opened
KSEBL by 15.06.2022.
(ii) The entities to furnish information in the prescribed format by first week of every
month on regular basis to Member Convener, PSDF Project Monitoring Group
(AGM, NLDC,POSOCO) with a copy to NPC Division, CEA.
7) Capacitor Installation:
Details of capacitors installed by all the states needed to be submitted on monthly basis to
SRPC Secretariat.
8) U/F&df/dt Relays Schemes
Utilities are requested to update the status on regular basis.
All the SLDCs are requested to update the status on RE SCADA availability on monthly
basis. All the states/STUs should adhere to the Grid Connectivity Regulations as amended.
10) Certification of Healthiness of Islanding Scheme(CEA/MoP requirement):
Participating Generator Utilities /transmission utilities/SLDCs/SRLDC may confirm the
healthiness of the Islanding Schemes. This is a monthly requirement and all the utilities
In view of above, it is requested that the data for the Monthly Operating Report/ Monthly
Generation Report should be submitted by 7thof the month to the
emailid: mgrceaopm@gmail.com
The monthly generation data w.r.t SR generators are being furnished to CEA by SRPC
Secretariat. It is requested to all SLDCs and Generators to submit the generation data by
5th of every month(irrespective of date of OCC Meeting) to enable SRPC to consolidate
the same and furnish to CEA by 5thof every month.
*****