Download as pdf
Download as pdf
You are on page 1of 5
INSPECTION AND TEST REPORT FOR INTERLOCKING AT DIAMETER 01. Project CENTRALJAVA2 X 1000MW COAL FIRE POWER PLANT. Subcontractor PT. Graha Usaha Teknik TTRNo. BAT FEED Location S5OKV Switchyard REINO. BAYA inspected fem Ref DWG No, | _1HZC223955 Sh.No: ABIA & A820 __|KKSNo 42AsA00GHOOL 1 OPERATE FROM LOCAL CONTROL CENTRE =B1.15 ~~ SSDKVSS BAY. Ltaihad RESULT bac mc /scu ps-ca | €5-as1 | ce-Go | €-as2 | os-q? | os-a9 | e-ass | FeS-ce | ts-ais Glosmepsai J locas ‘OPEN | OPEN | OPEN OPEN POSSIRLE ox ‘Glosmé sai J|_ tocar cioseo_[ Pen | OPEN ‘OPEN |_noT posse | ow ‘lose psa J|_ toca ‘open | closed | oPEW ‘OPEN [NOT possiae | ow Glosmepsaa || toca “OPEN [Open | close ‘OPEN [NOT posite | __oK Glosine ps a1 J[_LocaL ‘OPEN [OPEN | OPEN Ciose0 [Nor posite | _oK CLOSING DS a2. LOSING DS a2 CLOSING DS 02. CLOSING DS az CLOSING DS. C2 CLOSING ES O51 CLOSING ES 051 CLOSING ES 051 OPEN ‘OPEN Lose ‘OPEN ‘OPEN ‘OPEN ‘PEN | closed OPEN ‘OPEN OPEN ‘OPEN “OPEN “OPEN CLoseD. POSSILE NOT POSSIBLE NOT POSSIBLE NOT POSSIBLE NOT POSSIBLE POSSIBLE NOT POSSIBLE "NOT POSSIBLE Inspected by Subcontractor BY. SC BPI Signature div A wart M chande te Hery Tanrporto NUR_PITRIAWAN Date G72 Jat for [poio” PT. Graha Usaha Teknik a eae Page of | _finl INSPECTION AND TEST REPORT FOR INTERLOCKING AT DIAMETER 01 Project ‘CENTRAL JAVA 2 X 1000MW COAL FIRE POWER PLANT Subcontractor PT. Graha Usaha Teknik ITR No, BAY [Feet Location S5OkV Switchyard FINO. BAY 1.1. Inspected tem RefDWGNo, | 1H2C223955 Sh.No: ABIA &AB20___|KKS No 12asao0GHOOL ‘CONTROL MODE SWITCH “eww EOUE, SSDKV SS Bay 1 RESULT 5-09 | e5-a53 | FeS-a8 | e5-ai5 | EXPECTED toc) et Go lea ose Goane sas] 10cm om on [esa a Gloswo ts as2 loca Tose ‘ore [nor rosea [or Glosworsas2 tocar ‘FE CoseD Linorrossece [or {CLOSING cB 00. CLOSING C8. 00 {CLOSING cB 00 CLOSING CB.O0 e POSSIBLE TROT POSSIELE” NOT POSSIBLE” TNOT POSSTELE ‘CONTROL jODE SWITCH TESTTO ‘OPERATE, inc ‘ecu rane| ‘SSD KV SS ae] Gosnersais J Toca ‘ore Passat Gosncesais | tocar Tose Nor Posse GOSNGESaIS | Local ‘Pet TOT POSSELE Note: EP ~End Postion (Open or Closed ) Not EP (Not Open or Not Close} inspected by ‘Subcontractor v x or Signature ji want mm chase 1799 “tea 0 NUR_ETRAWAy Date wt [el a 2. PT Grahe Usahe Tek Page 2015 INSPECTION AND TEST REPORT FOR INTERLOCKING AT DIAMETER 01 Project ‘CENTRALJAVA 2 x 1OGOMW COAL FIRE POWER PLANT Mar Subcontractor PT. Graha Usaha Teknik TTR No location S5OKV Switchyard RFINo. BAYLI Inspected tem Ref DWGNo. | 1HZC223055 ShiNo: ABI & ABO [ks No 12ASA00GHOOL CONTROL MODE swircH || SSOKVSS SSOKVSS =a ao a | =r [=| orenaTe __|[ toc nem unacy ctf cb-a0 | e-a52 | bs@ | bs-w | Boss Fes-a@ J e5-ais | 5-ai | 4 CLOSING ESO53 | LOCAL — ‘OPEN | OPEN [= ‘OPEN POSSIBLE a Closing es.053 | tocar “0st5 | OPEN OPEN norposswie || or ‘CLOSINGESaS3 | LOCAL ‘OPEN | close : OPEN ‘norPoss@te | ox sre beet mE =e CONTROL MODE SWITCH ‘SSO KVSS 550 kVSS MVSG ES “T ao Pomeae [encima] Bayi BAY12 esutuniTa earecren | ce [ OPERATE toc/nem |wnac/scuf ce -0 | os-a2 | 06-09 | Fes-a8 | oss J[es-ai1 [cacao [es ciose | es onen CLOSING DS.09. CLosiNG DS 09) ‘CLOSING DS a9 CLOSING D5 a5 LOSING D5 09 CLOSING DS 05. TOCAL TOCAL LOCAL TOCAL TOCAL TOCAL ‘OPEN close. ‘OPEN OPEN “OPEN ‘OPEN ‘OPEN ‘OPEN CLOSED. ‘OPEN ‘OPEN ‘OPEN ‘OPEN ‘OPEN ‘OPEN, CLOSED OPEN ‘OPEN Note: MVSG ES ~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1 Simulate the signal by Open the jumper at terminal side due to external cable is not connected yet ‘OPEN ‘OPEN ‘OPEN ‘OPEN CLOSED. ‘OPEN 75 OPEN ES OPEN ESOPEN ES OPEN ES OPEN close, POSSIOLE NOT POSSIBLE NOT POSSIBLE NOT POSSIBLE’ NOT POSSIBLE NOT POSSIBLE Inspected by Subcontractor BV. SC oo Signature PT. Gaha Usaha Tek t m chanéce_| fe Be HUA FrTapwAd Date 08 [02 Jaoty L AU Zatiae Pag Page 3015, INSPECTION AND TEST REPORT FOR INTERLOCKING AT DIAMETER 01 Project (CENTRALJAVA 2x 1000MW COAL FIRE POWER PLANT vireo Subcontractor | PT. Grana Usaha Teknik TR No. Teocation SBOKV Switchyard RFINo BAYA Inspected em Ref DWG No. | H2C223065 Sho: Abii & ABO |S No 12asa00GHooL [[eonrnot wove swine ‘550 kV SS ssoKVSS | CMVSGES TET | ewsaur. [oxcuran Bava Bavi2 sur unira rece Tec OPERATE. soci rem _jmmuic/ecu[ cB-Qo | ps-a2 | ps-a9 | Fés-qs | es-a53 | s-qil | ca-ao | ESclOsE ESOPEN . {Lctosins osas—_JT_tocar ‘OPEN | ‘OPEN | oven Jf ‘OPEN ESOPEN || POSSIBLE + close 0s 09] tocar GLOSED. = ‘Oren | OPEN OPEN BOneN ||_norrossmie [on close ps0 —|-locaL Oren GioseD [OPEN ‘ore E50peN | _norPossmle [ok comes] ont sabes a soar pera |e Saeee ee a Sat ep som preset ‘CLOSING DS 08 CLOSING DS a8 CLOSING DS.09) CLOSING DS 05 ‘CLOSING DS 09 CLOSING DS 09. TOCAL TOCAL TOCAL LOCAL TOCAL ToCat OPEN ‘Lose. ‘OPEN OPEN OPEN “OPEN OPER ‘OPEN CLOSED ‘OPEN ‘OPEN ‘OPEN OPEN, ‘OPEN, “OPEN GloseD, OPEN ‘OPEN “OPEN ‘OPEN ‘OPEN. OPEN CLOSED ‘OPEN Note : MVSGES~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1 ‘Simulate the signal by Open the jumper at terminal side due to external cable Is not connected yet 7S OPEN ES OPEN ESOPEN ESOP ES OPEN és close POSSIBLE NOT POSSIBLE NOT POSSILE WoT POSSIALE NOT POSSIBLE. NOT POSSIBLE or OK Or On on "OK 7 Graha Usaha Teknik Lis on inspected by Subcontractor Ww 3 wi won Ne Signature pie zone NUR PITRWA Wa Date By Page dof INSPECTION AND TEST REPORT FOR INTERLOCKING AT PT Grana Usaha Tel DIAMETER 01 Project CENTRAL JAVA? X 1000MIW COAL FIRE POWER PLANT ae Subcontractor | PT. Graha Usaha Teknik TRNO. Location 50K Switchyard RFINo. BAYA Inspected item Ref DWGNo. | 4H2C223955 Sh No: ABI & ABZ |kKs No -2asAo0GHOOL [ommotweneawnar Seonwss ows WG ES ‘TESTTO e@ Hw equ, | @ acu Pane] ‘BAVLL BAY1.2 GSUT UNIT 1 Eyeere CHECK | ornate] oc/nem |ne/sed)-ea-00 [oar os Le [earl ew [acol som) Gimeno = a Bon] eee] CLOSING DS 09 LOCAL ‘CLOSED ‘OPEN OPEN T OPEN ES OPEN. ‘NOT POSSIELE OK closwepsae tocar ren ‘Oren | close | ~onew ore [_norrossice [or] close ps09— | loca OneN ‘oven | _onen | cioseo ESOREN ||_norrossme [or closes] locas crew | _ ‘omen | one [omen 5 close ‘or possmte Jf or Note MVSG ES ~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1 ‘Simulate the signal by Open the jumper at terminal side due to external cable is not connected yet CONTROL MODE SWITCH S50KVSS SSOKVSS 1MVSG GOB TT Teta ewraur.[o scum saya sava2 sur unr aareces | cece orenate | vocynem |mnc/ecd cs-a0 | ps-aa | os-as | res-ae | es-ass | os-am | co-go | osciost | os oren [Tictesncresos—Jroear rT ont ‘Ds 07eN |__Possiue OF close FeSae || tocar Close I ‘2s 07eN ||_norrossint | or Note: MVSG GCB~ Medium Voltage Switchgear GCB DS status, simulate the signal by remove the jumper due to external cable not connected yet inspected by Subcontractor wy % PL Signature wage fareana NUR FITRIAW AN Date BY Page Sof

You might also like