INSPECTION AND TEST REPORT
FOR INTERLOCKING AT
DIAMETER 01.
Project CENTRALJAVA2 X 1000MW COAL FIRE POWER PLANT.
Subcontractor PT. Graha Usaha Teknik TTRNo. BAT FEED
Location S5OKV Switchyard REINO. BAYA
inspected fem Ref DWG No, | _1HZC223955 Sh.No: ABIA & A820 __|KKSNo 42AsA00GHOOL
1 OPERATE FROM LOCAL CONTROL CENTRE =B1.15
~~ SSDKVSS
BAY. Ltaihad
RESULT bac
mc /scu ps-ca | €5-as1 | ce-Go | €-as2 | os-q? | os-a9 | e-ass | FeS-ce | ts-ais
Glosmepsai J locas ‘OPEN | OPEN | OPEN OPEN POSSIRLE ox
‘Glosmé sai J|_ tocar cioseo_[ Pen | OPEN ‘OPEN |_noT posse | ow
‘lose psa J|_ toca ‘open | closed | oPEW ‘OPEN [NOT possiae | ow
Glosmepsaa || toca “OPEN [Open | close ‘OPEN [NOT posite | __oK
Glosine ps a1 J[_LocaL ‘OPEN [OPEN | OPEN Ciose0 [Nor posite | _oK
CLOSING DS a2.
LOSING DS a2
CLOSING DS 02.
CLOSING DS az
CLOSING DS. C2
CLOSING ES O51
CLOSING ES 051
CLOSING ES 051
OPEN
‘OPEN
Lose
‘OPEN
‘OPEN
‘OPEN
‘PEN | closed
OPEN
‘OPEN
OPEN
‘OPEN
“OPEN
“OPEN
CLoseD.
POSSILE
NOT POSSIBLE
NOT POSSIBLE
NOT POSSIBLE
NOT POSSIBLE
POSSIBLE
NOT POSSIBLE
"NOT POSSIBLE
Inspected by Subcontractor BY. SC BPI
Signature div A wart
M chande te Hery Tanrporto NUR_PITRIAWAN
Date G72 Jat for [poio”
PT. Graha Usaha Teknik
a eae
Page of| _finl
INSPECTION AND TEST REPORT
FOR INTERLOCKING AT
DIAMETER 01
Project ‘CENTRAL JAVA 2 X 1000MW COAL FIRE POWER PLANT
Subcontractor PT. Graha Usaha Teknik ITR No, BAY [Feet
Location S5OkV Switchyard FINO. BAY 1.1.
Inspected tem RefDWGNo, | 1H2C223955 Sh.No: ABIA &AB20___|KKS No 12asao0GHOOL
‘CONTROL MODE SWITCH
“eww EOUE,
SSDKV SS
Bay 1
RESULT
5-09 | e5-a53 | FeS-a8 | e5-ai5 |
EXPECTED
toc) et Go lea ose
Goane sas] 10cm om on [esa a
Gloswo ts as2 loca Tose ‘ore [nor rosea [or
Glosworsas2 tocar ‘FE CoseD Linorrossece [or
{CLOSING cB 00.
CLOSING C8. 00
{CLOSING cB 00
CLOSING CB.O0
e
POSSIBLE
TROT POSSIELE”
NOT POSSIBLE”
TNOT POSSTELE
‘CONTROL
jODE SWITCH
TESTTO
‘OPERATE,
inc
‘ecu rane|
‘SSD KV SS
ae]
Gosnersais J Toca ‘ore Passat
Gosncesais | tocar Tose Nor Posse
GOSNGESaIS | Local ‘Pet TOT POSSELE
Note: EP ~End Postion (Open or Closed ) Not EP (Not Open or Not Close}
inspected by ‘Subcontractor v x or
Signature ji want
mm chase 1799 “tea 0 NUR_ETRAWAy
Date wt [el a 2.
PT Grahe Usahe Tek
Page 2015INSPECTION AND TEST REPORT
FOR INTERLOCKING AT
DIAMETER 01
Project ‘CENTRALJAVA 2 x 1OGOMW COAL FIRE POWER PLANT Mar
Subcontractor PT. Graha Usaha Teknik TTR No
location S5OKV Switchyard RFINo. BAYLI
Inspected tem Ref DWGNo. | 1HZC223055 ShiNo: ABI & ABO [ks No 12ASA00GHOOL
CONTROL MODE swircH || SSOKVSS SSOKVSS
=a ao a | =r [=|
orenaTe __|[ toc nem unacy ctf cb-a0 | e-a52 | bs@ | bs-w | Boss Fes-a@ J e5-ais | 5-ai | 4
CLOSING ESO53 | LOCAL — ‘OPEN | OPEN [= ‘OPEN POSSIBLE a
Closing es.053 | tocar “0st5 | OPEN OPEN norposswie || or
‘CLOSINGESaS3 | LOCAL ‘OPEN | close : OPEN ‘norPoss@te | ox
sre beet mE =e
CONTROL MODE SWITCH ‘SSO KVSS 550 kVSS MVSG ES “T
ao Pomeae [encima] Bayi BAY12 esutuniTa earecren | ce
[ OPERATE toc/nem |wnac/scuf ce -0 | os-a2 | 06-09 | Fes-a8 | oss J[es-ai1 [cacao [es ciose | es onen
CLOSING DS.09.
CLosiNG DS 09)
‘CLOSING DS a9
CLOSING D5 a5
LOSING D5 09
CLOSING DS 05.
TOCAL
TOCAL
LOCAL
TOCAL
TOCAL
TOCAL
‘OPEN
close.
‘OPEN
OPEN
“OPEN
‘OPEN
‘OPEN
‘OPEN
CLOSED.
‘OPEN
‘OPEN
‘OPEN
‘OPEN
‘OPEN
‘OPEN,
CLOSED
OPEN
‘OPEN
Note: MVSG ES ~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1
Simulate the signal by Open the jumper at terminal side due to external cable is not connected yet
‘OPEN
‘OPEN
‘OPEN
‘OPEN
CLOSED.
‘OPEN
75 OPEN
ES OPEN
ESOPEN
ES OPEN
ES OPEN
close,
POSSIOLE
NOT POSSIBLE
NOT POSSIBLE
NOT POSSIBLE’
NOT POSSIBLE
NOT POSSIBLE
Inspected by
Subcontractor
BV.
SC
oo
Signature
PT. Gaha Usaha Tek
t m chanéce_| fe Be HUA FrTapwAd
Date 08 [02 Jaoty L AU Zatiae Pag
Page 3015,INSPECTION AND TEST REPORT
FOR INTERLOCKING AT
DIAMETER 01
Project (CENTRALJAVA 2x 1000MW COAL FIRE POWER PLANT vireo
Subcontractor | PT. Grana Usaha Teknik TR No.
Teocation SBOKV Switchyard RFINo BAYA
Inspected em Ref DWG No. | H2C223065 Sho: Abii & ABO |S No 12asa00GHooL
[[eonrnot wove swine ‘550 kV SS ssoKVSS | CMVSGES
TET | ewsaur. [oxcuran Bava Bavi2 sur unira rece Tec
OPERATE. soci rem _jmmuic/ecu[ cB-Qo | ps-a2 | ps-a9 | Fés-qs | es-a53 | s-qil | ca-ao | ESclOsE ESOPEN .
{Lctosins osas—_JT_tocar ‘OPEN | ‘OPEN | oven Jf ‘OPEN ESOPEN || POSSIBLE +
close 0s 09] tocar GLOSED. = ‘Oren | OPEN OPEN BOneN ||_norrossmie [on
close ps0 —|-locaL Oren GioseD [OPEN ‘ore E50peN | _norPossmle [ok
comes] ont sabes a soar pera |e
Saeee ee a Sat ep som preset
‘CLOSING DS 08
CLOSING DS a8
CLOSING DS.09)
CLOSING DS 05
‘CLOSING DS 09
CLOSING DS 09.
TOCAL
TOCAL
TOCAL
LOCAL
TOCAL
ToCat
OPEN
‘Lose.
‘OPEN
OPEN
OPEN
“OPEN
OPER
‘OPEN
CLOSED
‘OPEN
‘OPEN
‘OPEN
OPEN,
‘OPEN,
“OPEN
GloseD,
OPEN
‘OPEN
“OPEN
‘OPEN
‘OPEN.
OPEN
CLOSED
‘OPEN
Note : MVSGES~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1
‘Simulate the signal by Open the jumper at terminal side due to external cable Is not connected yet
7S OPEN
ES OPEN
ESOPEN
ESOP
ES OPEN
és close
POSSIBLE
NOT POSSIBLE
NOT POSSILE
WoT POSSIALE
NOT POSSIBLE.
NOT POSSIBLE
or
OK
Or
On
on
"OK
7 Graha Usaha Teknik Lis on
inspected by Subcontractor Ww 3 wi
won Ne
Signature pie
zone NUR PITRWA Wa
Date By
Page dofINSPECTION AND TEST REPORT
FOR INTERLOCKING AT
PT Grana Usaha Tel
DIAMETER 01
Project CENTRAL JAVA? X 1000MIW COAL FIRE POWER PLANT ae
Subcontractor | PT. Graha Usaha Teknik TRNO.
Location 50K Switchyard RFINo. BAYA
Inspected item Ref DWGNo. | 4H2C223955 Sh No: ABI & ABZ |kKs No -2asAo0GHOOL
[ommotweneawnar Seonwss ows WG ES
‘TESTTO e@ Hw equ, | @ acu Pane] ‘BAVLL BAY1.2 GSUT UNIT 1 Eyeere CHECK
| ornate] oc/nem |ne/sed)-ea-00 [oar os Le [earl ew [acol som)
Gimeno = a Bon] eee]
CLOSING DS 09 LOCAL ‘CLOSED ‘OPEN OPEN T OPEN ES OPEN. ‘NOT POSSIELE OK
closwepsae tocar ren ‘Oren | close | ~onew ore [_norrossice [or]
close ps09— | loca OneN ‘oven | _onen | cioseo ESOREN ||_norrossme [or
closes] locas crew | _ ‘omen | one [omen 5 close ‘or possmte Jf or
Note MVSG ES ~ Medium Voltage Switchgear Earthing Switch at GSUT Unit 1
‘Simulate the signal by Open the jumper at terminal side due to external cable is not connected yet
CONTROL MODE SWITCH S50KVSS SSOKVSS 1MVSG GOB TT
Teta ewraur.[o scum saya sava2 sur unr aareces | cece
orenate | vocynem |mnc/ecd cs-a0 | ps-aa | os-as | res-ae | es-ass | os-am | co-go | osciost | os oren
[Tictesncresos—Jroear rT ont ‘Ds 07eN |__Possiue OF
close FeSae || tocar Close I ‘2s 07eN ||_norrossint | or
Note: MVSG GCB~ Medium Voltage Switchgear GCB DS status, simulate the signal by remove the jumper due to external cable not connected yet
inspected by Subcontractor wy % PL
Signature wage
fareana NUR FITRIAW AN
Date BY
Page Sof