INSPECTION AND TEST REPORT Projecto 177m
Ga 7. 0
ORGANIC COMPOSITE BUSHING
EV ssp oste: 25/01/19 rev No.:
Project PLTU BATANG 2 x 1000 MW_CENTRALIAVA PROIECT
Subcontractor | PT. BLACK @ VEACTH
Toeation GIs S008
Inspected tem | Organic Composite Bushing
BAY / FEEDER DIAMETER MI (B.3_UINE WA)
KAS Number = T2ABAOOGAAI
1 Nameplate data
Tengu Shenna Electie
806-550 /50004
Re SM17-SSOUNO6I 70057
seri Number ‘SeSMi7-Ssouco627O099
"Trswa7-SSoUK 96260100
[standard TEC 60089-4:2005
Manufacture year 2017-08
2, Equipment Required
Total naner
Wegpar WSIS Tormsbare
3 Genera nepecion
PHASER PASE Taser
zc napecon compliance with drovings ond lated doc OK OF OK
inspect te possible camaged ofthe ruber bushing OK OF OK
Grounding sysiem OK OF Ox
Winesed Review by Reviewed / Approved
= a BVI (SUEngineer)
Wan!
Ne
fame Wuhamad Chandra Name NUR Eom Ramie Ponda Plea
ate: 14-02 toy Date a Date pate: TW/o2/2019
PT. Graha Utsha Teknik 1.81.3 Comp using ine Page st2SE paar
7
oncanic compost aust
ae za
aR
fog votge + sm0 v0 aC
7 Tens
Tested Grounded (°c}_| tion PHASES eT
so aon | ass a
x fos{ an ao on en]
a malar i oe
‘Terminal exon Pesta art 60 sec] ‘59.20 Go 60.20 6a 39.10 6a
2 ime| se ea | wen | ee
| as a a
rae eee Tes
= = = Batata
Shu wane J
Name Muhamed Ghondra Name? URE [nane ame pat raves
[Date Wor [Date i [Date pate: 1/027 2el'
Pr. rata Ursha Teknik 01.813. Computing Ln #2 page 202