Professional Documents
Culture Documents
Sea Conquest-Daily Site Safety Review - 22th 24 HRS PTW Valid 22-01-23 To 04-02-2023
Sea Conquest-Daily Site Safety Review - 22th 24 HRS PTW Valid 22-01-23 To 04-02-2023
This does not authorize work. This daily review must be conducted by a SA project engineer, PMT
Superintendent and HSE site representative to review and confirm that all the required safety controls are in
place as required by the Job Safety Analysis, Method Statement, or Chemical Hazard Bulletin and that the site
toolbox talk has been conducted with all personnel associated with the activity. This review also verifies that
the required documents are in place and specific for the tasks being performed.
This form must be retained with the site work permit and signed on a daily basis
Division: SACPD
BI: BI-10-00506-0002
Main Contractor: NPCC
Sub-Contractors:
NA
Daily Activities
Control
High Risk Measures
Area Activities in Place
Yes No Yes No
JU’AYMAH General and critical Lifting Operation
Field & JU’AYMAH Field & BYPASS PL-04, √ √
BYPASS PL-
04
JU’AYMAH
Field &
Diving, Survey, Flooding, Hydro testing, Removal of
temporary supports, Removal of LDH & SUH,
√ √
BYPASS PL- grouting, JU’AYMAH Field & BYPASS PL-04,
04
JU’AYMAH General and critical Lifting Operation
Field & JU’AYMAH Field & BYPASS PL-01, √ √
BYPASS PL-
01
JU’AYMAH
Field &
Diving, Survey, Flooding, Hydro testing, Removal of
temporary supports, Removal of LDH & SUH,
√ √
BYPASS PL- grouting, JU’AYMAH Field & BYPASS PL-01,
01