2-STOREY APARTMENT BUILDING

QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
FOOTING
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION Thickness bedding (thk) BD SET
L W D
F1 1.3 1.3 1.5 0.3 0.1 1.2 8
F2 1.2 1.2 1.5 0.3 0.1 1.2 8
F3 0.8 0.8 1.5 0.3 0.1 1.2 4
0
0
0
0
0
0
0
0
0
0

0 Total
DEPTH
QUANTITY BACKFILL

46.21 NO NEED BACKFILL


REQUIREMENT (pls
41.47 refer to structulan
12.54 plan)

100.22 CU.M 0 CU.M


2-STOREY APARTMENT BUILDING

QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
TIEBEAM
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION length SET QUANTITY
b h D
TB1 0.2 0.45 1.45 4.108 5 23.83
TB1 0.2 0.45 1.45 4.074 5 23.63
TB2 0.2 0.45 1.45 2.153 4 9.99
Grade beam
along the X 0.2 0.3 0.5 12.25 4 19.60
Grade beam
along the Y 0.2 0.3 0.5 13.283 4 21.25

Total 98.30 CU.M


BACKFILL DEPTH

0.225 14.953 0.7


0.225 14.829 0.7
0.18 6.270 0.7

0.12 15.288 0.3

0.12 16.577 0.3

0.87

67.917 CU.M
2-STOREY APARTMENT BUILDING

QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
WALLFOOTING
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION THK SET QUANTITY
W L D
WF1 0.4 3.15 1.5 0.25 2 9.45
WF2 1.35 3.15 1.5 0.25 2 18.43
WF3 0.4 3.5 1.5 0.25 3 15.75

Total 43.63 CU.M


BACKFILL BD

1.26 10.24 1.25


4.2525 19.96 1.25
2.1 17.06 1.25

7.6125

47.263 CU.M
EXCAVATION BACKFILL
FOOTING 100.22 0.00
TIEBEAM 98.30 67.92
WALLFOOTING 43.63 47.26
TOTAL 242.15 115.18 CU.M