QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
FOOTING
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION Thickness bedding (thk) BD SET
L W D
F1 1.3 1.3 1.5 0.3 0.1 1.2 8
F2 1.2 1.2 1.5 0.3 0.1 1.2 8
F3 0.8 0.8 1.5 0.3 0.1 1.2 4
0
0
0
0
0
0
0
0
0
0
0 Total
DEPTH
QUANTITY BACKFILL
QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
TIEBEAM
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION length SET QUANTITY
b h D
TB1 0.2 0.45 1.45 4.108 5 23.83
TB1 0.2 0.45 1.45 4.074 5 23.63
TB2 0.2 0.45 1.45 2.153 4 9.99
Grade beam
along the X 0.2 0.3 0.5 12.25 4 19.60
Grade beam
along the Y 0.2 0.3 0.5 13.283 4 21.25
0.87
67.917 CU.M
2-STOREY APARTMENT BUILDING
QUANTITY ESTIMATE
DIVISION: CIVIL WORKS
WALLFOOTING
WORK ITEM: Excavation
BOQ UNIT: cu.m
DIMENSION
LOCATION THK SET QUANTITY
W L D
WF1 0.4 3.15 1.5 0.25 2 9.45
WF2 1.35 3.15 1.5 0.25 2 18.43
WF3 0.4 3.5 1.5 0.25 3 15.75
7.6125
47.263 CU.M
EXCAVATION BACKFILL
FOOTING 100.22 0.00
TIEBEAM 98.30 67.92
WALLFOOTING 43.63 47.26
TOTAL 242.15 115.18 CU.M