Report Bsr205 Assigment 2 (100%)
Report Bsr205 Assigment 2 (100%)
Topic:
QUALITY STANDARD FOR ARCHITECTURE WORKS (QLASSIC)
SURVEYING TOOLS AND EQUIPMENT
Prepared for:
PUAN NOORAZLINA BINTI KAMARULZAMAN
AND
TS. DR. SURIANI BINTI NGAH ABDUL WAHAB
Prepared by:
NUR BATRISYIA BINTI MUHAMMAD
(2020895504) AP1193H
Semester:
OCTOBER 2021 – FEBRUARY 2021
Submission date:
WEEK 14
1
TABLE OF CONTENTS
NO CONTENTS PAGES
2
CHAPTER 1.0: (INTRODUCTION)
Figure 1.1.1
Figure 1.1.2
The figure above shows the location plan of the house
3
• Outbuildings a. Masjid Bandar Universiti
b. Pasaraya 99 SpeedMart
c. Pasaraya Tesco
4
d. Perhentian Bas Seri Iskandar
e. Petronas
5
b. Parking Lot
5. • Year of built • This housing estate has been built for 6 years
• Cost since February 2016.
• The cost of RM225,000 and the rent of this house
is RM 900 per month.
6. • Maintenance • Renovation work on changing cement floor to
Information porcelain tile, extend at living room and kitchen
and adding 2 more bath room after 5 years of
completion.
6
• Weather • Day 1
conditions at Time and data of Wind Temp Humidity
time of survey survey (km/h) (c) (%)
Afternoon 10 km/h 32°c 25%
(1-2 p.m.)
(15 Dec 2021)
Evening 15 km/h 27°c 75%
(6-7 p.m)
(15 Dec 2021)
Night 13km/h 30°c 67%
(12-1 a.m)
(15 dec 2021)
• Day 2
Time and data of Wind Temp Humidity
survey (km/h) (c) (%)
Afternoon 6km/h 25°c 84%
(1-2 p.m)
(15 Dec 2021)
Evening 10km/h 32°c 55%
(6-7 p.m)
(15 Dec 2021)
Night 7km/h 30°c 50%
(12-1 a.m)
(15 dec 20
7
1.2 Purpose scope of work
The goal of this inspection is to provide information on visual inspection of the property in order
to identify serious flaws and from an opinion on the property’s general condition at the time of
inspection.
8
1.3 General Description
This house is located at Lakeville, Seri Iskandar, Perak. This is a Single Storey Terrace house.
This house is started to build at year of 2016 and fully finished at 2018 which took the
construction work for 2 years. Starting in 2019, this house has been rented up until now..
Renovation work begun in this house in July 2021 because of the occurrence of cracks due to
old material. This house is still in renovation work because of the leakage roof. There are a lot
of renovation has been done in this house. There are also a lot of changing space and adding
space in this original house floor plan. There are changing in window, cement floor to porcelain
floor, adding 1 bathroom at ultility space.
This residential at Lakeville, Seri Iskandar is strategically located near to Uitm Seri Iskandar,
Bus Station, Petrol station PETRONAS, and Bandar Universiti which have many supermarket
and restaurants there such as My Kori, Billion and Tesco. This house is a Single Storey
Terrace house
9
1.3.2 Accomodation
2.
Living room area is a space for family to
relaxing, gather. This area function as all the
family member gather to rest and watch
television together.
10
4.
Kitchen is a space used for cooking. When it
comes to an open kitchen, the dry area's look
should be integrated with the decor of the
living-dining area. This space equipped with
smaller heating devices like microwaves and
toaster ovens, the dry kitchen serves as the
breakfast and / or snacks cooking place
5.
Toilet were described as a room or cubicle
that contain sanitary ware such as bath,
shower, urinal or bidet. There were 3 bath
room in this house which is located at
bedroom 1, bedroom 2 and main bathroom
near to the living room.
11
1.3.3 Building Orientation
AFTERNOON SUN
EVENING SUN
MORNING SUN
The orientation of this house is facing the south side. The sun rises on the left side of the
house and sunset on the right side of the house. This house does not get the direct sunlight
from the sun due to the position of this house at centre of other house and after the renovation,
the post porch in front of house were built cause the sunlight do not enter much into the house.
For the afternoon sun, it was placed on top of the house which is not good because afternoon
sunlight gives more heat and therefore at this moment the occupant in this building may feel
hot due to the direct sunlight. For the evening sun, it was placed at the back of the house,
therefore the occupant may feel less hot than the afternoon sun. To be conclude, this building
has a bad orientation and bad ventilation for the bedroom 1 and living room area because
there were no windows and the sunlight cannot passes through that area due to post porch
that blocked sunlight and cause less sunlight can enter in this house, therefore it causes more
electrical energy to be used.
12
CHAPTER 2.0 LIMITATION OF INSPECTION
PHOTOS DESCRIPTION
1. Roof A roof is the top covering of a structure, and it consists
of the materials and construction necessary to support
it on the building's walls or uprights and protect it from
rain, snow, sunlight, temperature extremes, and wind.
Roof area is limited which means it can be reach using
a ladder. In my case, I don’t have a long ladder that
can reach my roof, so because of that it will prevent
me from making an inspection. According to my rough
vision, my roof has a defect that it will leak when it rains
and it will make the ceiling look wet.
Location: Ceiling
13
3. Foundation This is because the foundation is located under the
building and cannot be access. Thus, it should be
under special instructor if want to do the inspection.
Location: Underground
4. Internal wall Inspection cannot see inside the internal wall since it
is covered by huge furniture such as a kitchen cabinet
or electrical wiring.
Location: kitchen
14
CHAPTER 3.0 SCOPE OF WORKS
A building inspection should be carried out by a building inspector. A building inspector is often
employed by a city, township, or county and is qualified in one or more areas, allowing them
to make expert judgments regarding whether a facility complies with building code standards.
A building inspector can be licensed as a residential or commercial building inspector, a
plumbing, electrical, or mechanical inspector, or any other specialty-focused inspector capable
of examining structures at various phases of construction.
Based on this case study, confirmation of the client's instructions is required before the
inspection may begin. The Building Condition Survey and Assessment (BCSA) was used as
a reference by the clients, Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani Binti Ngah
Abdul Wahab, who required a detailed assessment of this single Storey terrace house from
the beginning to the end. A building surveyor's job is to understand the building problems and
possible causes of the problems and defects in terms of symptoms, causes, and treatments,
and then to suggest suitable solutions to the problems while following the client's instructions.
This home was constructed in the year 8 February 2015 and will be completed in the year 10
October 2016. The construction work took almost 20 months. Puan Rabiaton is the owner of
the building, which has been in use since 20 February 2017.
Tools and equipment are insufficient for this inspection because everyone in this online
distance learning system had to inspect their own home, so tools became a limitation. In this
residence, there are only a few instruments and tools, such as a spirit level and a measuring
tape.
15
iv. A study of the roof structure and coverings from the ground level, using binoculars, if
necessary, as well as from ladders or roof voids when available.
v. The elevation is checked, as well as the building finishes. Inspect the site's
boundaries, outbuildings, and surroundings.
The client, Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani Binti Ngah Abdul Wahab, will
make a complete report with all of the data from the building inspection.
16
3.1.2 Inspection Procedure
Based on this case study, confirmation needed on the client instruction before start the
inspection. Based on the client which are Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani
Binti Ngah Abdul Wahab, The Building Condition Survey and Assessment (BCSA) and refer
Code of Practice off Building Surveying (CPBS101) as a reference that needs a detail of this
single storey terrace house from the first until finish the inspection. For a building, it is important
for a building surveyor to understand the building defects and the possible causes of the
problems and defects in relation to the symptoms, causes, and treatments, and then to
propose appropriate solutions to the problems in terms of following the client's instructions.
2. A detail inspection of main roof and subsidiary roof which are accessible.
Because there is no access door to the roof, this house's roof has a restricted amount of
space.
• Sagging ceiling
The water is soaking from leaking roof piled
onto ceiling plasterboard and pushing it
further towards breaking point.
17
4. Doors • Rusty door grill
The grill has rusted due to the fact that the
owner has not changed since the house was
built, but it is still usable.
4. An examination of the roof structure and coverings from ground level using
binoculars if necessary, and ladders or through roof voids where accessible.
The house is too height and I do not have any ladders so the inspection cannot be continued.
18
3.1.3 TOOLS & EQUIPMENT
There are 4 tools that has been used to start the inspection towards this house. The tools and
equipment that has been used are spirit level, l-square, tapping rod and measuring tape.
19
3.1.4 TOOLS & EQUIPMENT LIMITATION
FIGURE 3.1.4.1
4-in-1 meter
2. Moisture metres are used to determine the
amount of water in a given substance. This
information can be used to evaluate if the material
is ready to use, if it is especially wet or dry, or if
additional inspection is required. The amount of
moisture in wood and paper goods is critical.
FIGURE 3.1.4.2
Digital moisture meter
20
3. The Digital Caliper (also known as the Digital
Vernier Caliper) is a precision measuring
equipment that may be used to measure both
interior and external lengths. The
distances/measurements are read from a digital
caliper's LCD display in the example below
FIGURE 3.1.4.3
Digital caliper
21
3.2 Measured Drawing Plan
22
3.3 Asset and Space Tagging
23
CHAPTER 4.0 BUILDING ELEMENTS
2.
- Mild steel sliding door grill with zinc
diecast door grille handle lockset.
2.70m (length) x 2.23m (height). Mild
steel is used and it is finished with
silver paint.
3.
- 2.70m (length) x 2.28m (height).
Sliding door grille made of mild steel
with a zinc diecast door grille handle
lockset. Mild steel is used, and the
project is finished with brown wood oil
paint and shellac
24
4.
- Each panel is 0.65m in length by
1.13m in width and is 8 mm thick. Each
panel has an aluminium frame
casement window with a friction stay
and an aluminium lock set.
Figure
4.1.4 – Window
5.
- Mild steel window grille measures
1.85m in length and 1.71m in height.
Mild steel is used, and it is finished with
black oil paint and shellac.
Figure
4.1.6 – Pvc Folding Door
25
7.
- On both sides, 0.11m brickwall was
used with 0.01m plaster. Using a
paintbrush, apply the finisher to the
wall.
26
4.2 Electrical / Mechanical System
27
4.3 MECHANICAL SYSTEM
28
CHAPTER 5.0 (FINDINGS)
BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1
DEFECT DESCRIPTION
REMEDIES
29
NO OF DEFECT SHEET 2/10 LEVEL Ground Floor
BARIS
DEFECT DESCRIPTION
REMEDIES
30
NO OF DEFECT SHEET 3/10 LEVEL Ground Level
LOCATION: Kitchen
1 1 1
DEFECT DESCRIPTION
REMEDIES
31
NO OF DEFECT 4/10 LEVEL Ground Level
SHEET
LOCATION: Bedroom 1
3 2 6
DEFECT DESCRIPTION
- There are painting and coating at the ceiling.
REMEDIES
32
NO OF DEFECT SHEET 5/10 LEVEL Ground Level
DEFECT DESCRIPTION
REMEDIES
33
NO OF DEFECT SHEET 6/10 LEVEL Ground Level
LOCATION: Bedroom 2
BARIS
CONDITION PRIORITY MATRIX COLOUR
3 2 6
DEFECT DESCRIPTION
REMEDIES
34
NO OF DEFECT SHEET 7/10 LEVEL Ground Level
ELEMENT/COMPONENT Door
BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1
DEFECT DESCRIPTION
REMEDIES
35
NO OF DEFECT SHEET 8/10 LEVEL Ground Level
LOCATION: Bedroom 1
ELEMENT/COMPONENT Door
BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1
DEFECT DESCRIPTION
REMEDIES
36
NO OF DEFECT SHEET 9/10 LEVEL Ground Level
LOCATION: Bedroom 3
ELEMENT/COMPONENT Window
BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1
DEFECT DESCRIPTION
REMEDIES
37
NO OF DEFECT SHEET 10/10 LEVEL Ground Level
LOCATION: Kitchen
ELEMENT/COMPONENT Window
BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1
DEFECT DESCRIPTION
REMEDIES
38
5.2 Overall Building Rating
8 Door Squeaky 1 1 1 8 A8
sound
9 Window Physical 1 1 1 9 A9
damages and
scratches
10 Window Gaps at 1 1 1 10 A10
window
corner
Total Marks 28
[d]
Numbers of 10
defects [e]
Total Score 2.8
[d/e]
Overall Good
Building
Rating
39
5.3 Defect Indication Plan
A10
A3
A9
A6
A8
A4 A5
A7
A1 A2
11
40
5.4 Defect Indication Table
A6 5.1.6 Leaking
41
5.5 Defect Analysis
Sales
10%
Stain
10%
Cracks
40%
Unevenness
10%
Leakage
Squeaky Sound
10%
Gaps Window
20%
Based on the pie chart shown above, the highest percentage of defects in this case study is
“stain” with 40%. The second highest is “cracks” with 20%. Other than that, defects such as
“unevenness, leakage, squeaky sound and gaps window” is 10% for each. For stains on the
internal wall, the stains occurs due to other paints, the addition of the stain also occurs due to
the furniture being removed so as to leave traces of the furniture on the wall. Next for the
ceiling it also can cause of workmanship poor or the ceiling is in environment with high humidity
and excessive condensation.
Next, the second highest od defect percentage has been shown at defect pie chart which is
“cracks”. The total of this defects is 20%. It can caused by the unskilled worker during they
work. Other than that, it also can cause by the contraction and expansion due to fluctions in
temperature and moisture content. For others defects such as “unevenness, leakage, squeaky
sound and gaps window”. Each of the defects is 10%. The defects is not so severe, in fact the
existing damage will be under observation so that it does not get worse. In conclusion, the
damage in this building doe not have much because the house is still new.
42
CHAPTER 6.0 (RECOMMENDATIONS AND CONCLUSION)
First of all, I would like to give a big thanks towards my building surveyor practice (BSR205)
lecturer, Puan Noorazlina binti Kamarulzaman and Ts.Dr. Suriani binti Ngah Abdul Wahab
who were helping us a lot in completing our task in Building Condition Assesment report. From
their crit session and lecture video every week it has helping me a lot to complete this second
task with a full guidance from them. After the crit session from every week we had already be
commented to make an amendment based on our progress work from week by week. They
will make sure their student managed to get all the information and understand to do the task
smoothly.
Other than that, through this second task that were given to us, I have learned to do an
inspection procedure with the SOP and I also manage to know how to use the building
assessment rating system (BARIS). Besides that, I also manage to identify and find the root
cause of defect problem in the buildings. Based on the defect that I found in my case study, I
advise this customer to take quick action to fix the problems, it is to avoid the significant
consequences. However, I as building surveyor student feel little bit frustrated because of we
cannot manage to go on site and see more defects on building and experienced to be on site.
Last but not least, I am grateful that I manage to complete this report.
43
CHAPTER 7.0 (REFERENCES)
2. https://www.bca.gov.sg/professionals/iquas/gpgs/awindow/awdefectsremedies.pdf
(Type of defects at grill, Construction Industry Development , April 1999)
3. https://www.si-restoration.com/resources/water-damage-clean-up/common-causes-
water-stains-ceilings (Causes of water stains on ceiling, Si Restoration, October
2012)
6. https://civilblog.org/2015/08/21/10-common-defects-found-in-paint-work/ (Common
defects of paint, Suryakanta, 21 August 2015)
9. https://theconstructor.org/building/12-basic-components-building-structure/34024/
(Basic building element, indexed by google, March 2012)
44