JABATAN UKUR BANGUNAN

FAKULTI SENIBINA PERANCANGAN DAN UKUR


UNIVERSITI TEKNOLOGI MARA PERAK
KAMPUS SERI ISKANDAR

BUILDING SURVEYING PRACTICE 1


(BSR205)

Topic:
QUALITY STANDARD FOR ARCHITECTURE WORKS (QLASSIC)
SURVEYING TOOLS AND EQUIPMENT

Prepared for:
PUAN NOORAZLINA BINTI KAMARULZAMAN
AND
TS. DR. SURIANI BINTI NGAH ABDUL WAHAB

Prepared by:
NUR BATRISYIA BINTI MUHAMMAD
(2020895504) AP1193H

Semester:
OCTOBER 2021 – FEBRUARY 2021

Submission date:
WEEK 14

1
TABLE OF CONTENTS

NO CONTENTS PAGES

1.0 Chapter 1 (Introduction)


1.1 General Information 1
1.2 Purpose and scope of work 7
1.3 General Description 8

2.0 Chapter 2 (Limitation of Inspection) 12

3.0 Chapter 3 (Scope of Works)


3.1 Building Inspection 14
3.2 Measured drawing plan 21
3.3 Asset and space tagging 22
4.0 Chapter 4 (Building Elements)
4.1 Civil/ Architecture/ Finishing 23
4.2 Electrical System 26
4.3 Mechanical System 27
5.0 Chapter 5 (Findings)
5.1 Civil/ Architecture/ Finishing 28
5.2 Overall Building Rating 38
5.3 Defect Indication Plan 39
5.4 Defect Indication Table 40
6.0 Chapter 6 (Recommendation and Conclusion) 43

7.0 Chapter 7 (References) 44

2
CHAPTER 1.0: (INTRODUCTION)

1.1 General Information

NO. GENERAL DESCRIPTION


INFORMATION
1. • Name
• Address

Figure 1.1.1

The figure above shows is rental house. The name of the


owner is Rabiaton Adawiyah Binti Ahmed Tajudin. The
address is 112 Jalan Lakeville 31, Bandar Universiti, 32610
Seri Iskandar, Perak. It is located in Perak Tengah and this
place also close to the city of Seri Iskandar.
2. • Building • This type of house is single-storey terrace house and
status this building is for shelters lodgers.
(function) • The tenure for this house is 3 years.
• Tenure • Can be occupied up 5 people in the house.
• Occupancy
3 • Location plan

Figure 1.1.2
The figure above shows the location plan of the house

3
• Outbuildings a. Masjid Bandar Universiti

Figure 1.1.3 Masjid Bandar Universiti

• Distance from case study 1.9.km.

b. Pasaraya 99 SpeedMart

Figure 1.1.4 Pasaraya 99 Speed Mart

• Distance from case study 2.2.km.

c. Pasaraya Tesco

Figure 1.1.5 Pasaraya Tesco

• Distance from case study 2.5.km.

4
d. Perhentian Bas Seri Iskandar

Figure 1.1.6 Perhentian Bas


• Distance from case study 2.5 km.

e. Petronas

Figure 1.1.7 Petronas


• Distance from case study 2.7 km.

• Amenities a. Rubbish bin

Figure 1.1.8 Rubbish Bin


• This rubbish bin is located in front of the house for
house dwellers easily to throw their rubbish.

5
b. Parking Lot

Figure 1.1.9 Parking Lot


• This parking lot is provided in the courtyard. It is
used to ease house dwellers to park and secure
their car.
c. Road Lamp

Figure 1.1.10 Road Lamp


• Road lamp is built to ease people in night vision
and lights up the area.
4. • No. of storey This building is a single storey building, so there is no
height height of storey.

5. • Year of built • This housing estate has been built for 6 years
• Cost since February 2016.
• The cost of RM225,000 and the rent of this house
is RM 900 per month.
6. • Maintenance • Renovation work on changing cement floor to
Information porcelain tile, extend at living room and kitchen
and adding 2 more bath room after 5 years of
completion.

6
• Weather • Day 1
conditions at Time and data of Wind Temp Humidity
time of survey survey (km/h) (c) (%)
Afternoon 10 km/h 32°c 25%
(1-2 p.m.)
(15 Dec 2021)
Evening 15 km/h 27°c 75%
(6-7 p.m)
(15 Dec 2021)
Night 13km/h 30°c 67%
(12-1 a.m)
(15 dec 2021)
• Day 2
Time and data of Wind Temp Humidity
survey (km/h) (c) (%)
Afternoon 6km/h 25°c 84%
(1-2 p.m)
(15 Dec 2021)
Evening 10km/h 32°c 55%
(6-7 p.m)
(15 Dec 2021)
Night 7km/h 30°c 50%
(12-1 a.m)
(15 dec 20

7
1.2 Purpose scope of work

The goal of this inspection is to provide information on visual inspection of the property in order
to identify serious flaws and from an opinion on the property’s general condition at the time of
inspection.

a) Making a building inspection


b) Preparing a measured drawing plan
c) Making asset and space tagging
d) Internal and external Building Condition
e) Identification on each of building elements. It should be supported with appropriate
photo.

8
1.3 General Description

1.3.1 Description of property / Building background

Figure 1.3.1.1: Single Storey terrace house

This house is located at Lakeville, Seri Iskandar, Perak. This is a Single Storey Terrace house.
This house is started to build at year of 2016 and fully finished at 2018 which took the
construction work for 2 years. Starting in 2019, this house has been rented up until now..
Renovation work begun in this house in July 2021 because of the occurrence of cracks due to
old material. This house is still in renovation work because of the leakage roof. There are a lot
of renovation has been done in this house. There are also a lot of changing space and adding
space in this original house floor plan. There are changing in window, cement floor to porcelain
floor, adding 1 bathroom at ultility space.

This residential at Lakeville, Seri Iskandar is strategically located near to Uitm Seri Iskandar,
Bus Station, Petrol station PETRONAS, and Bandar Universiti which have many supermarket
and restaurants there such as My Kori, Billion and Tesco. This house is a Single Storey
Terrace house

9
1.3.2 Accomodation

NO. PHOTOS DESCRIPTION


1.
Bedroom is a place or room inside of the
building that were used by occupant to sleep,
rest and for their privacy space. There were 4
bedrooms in this house which are master
bedroom, bedroom 1, bedroom 2 and
bedroom 3.

Figure 1.3.2.1 Bedroom

2.
Living room area is a space for family to
relaxing, gather. This area function as all the
family member gather to rest and watch
television together.

Figure 1.3.2.2 Living room


3.
Dining area is a space for family or occupant
in the building to have their meals together
and do others activities

Figure 1.3.2.3 Dining Area

10
4.
Kitchen is a space used for cooking. When it
comes to an open kitchen, the dry area's look
should be integrated with the decor of the
living-dining area. This space equipped with
smaller heating devices like microwaves and
toaster ovens, the dry kitchen serves as the
breakfast and / or snacks cooking place

Figure 1.3.2.4 Kitchen

5.
Toilet were described as a room or cubicle
that contain sanitary ware such as bath,
shower, urinal or bidet. There were 3 bath
room in this house which is located at
bedroom 1, bedroom 2 and main bathroom
near to the living room.

Figure 1.3.2.5 Bathroom 1

11
1.3.3 Building Orientation

AFTERNOON SUN

EVENING SUN

MORNING SUN

Figure 1.3.3.1 Building Orientation

The orientation of this house is facing the south side. The sun rises on the left side of the
house and sunset on the right side of the house. This house does not get the direct sunlight
from the sun due to the position of this house at centre of other house and after the renovation,
the post porch in front of house were built cause the sunlight do not enter much into the house.
For the afternoon sun, it was placed on top of the house which is not good because afternoon
sunlight gives more heat and therefore at this moment the occupant in this building may feel
hot due to the direct sunlight. For the evening sun, it was placed at the back of the house,
therefore the occupant may feel less hot than the afternoon sun. To be conclude, this building
has a bad orientation and bad ventilation for the bedroom 1 and living room area because
there were no windows and the sunlight cannot passes through that area due to post porch
that blocked sunlight and cause less sunlight can enter in this house, therefore it causes more
electrical energy to be used.

12
CHAPTER 2.0 LIMITATION OF INSPECTION

The most common purpose of an inspection of a property is to determine general conditions


rather than to define all defects, which often would not be possible. There are several
exceptions, such as when a specific objective and scope are determined before work begins.
In a typical building inspection, an inspection will not be able to detect every problem or defect
that may exist on a property during a visual inspection, nor will an inspection always be able
to appreciate the full scale of a potential problem, even if it is identified. Based on that case
study, there are everal areas that I can't to the inspection.

PHOTOS DESCRIPTION
1. Roof A roof is the top covering of a structure, and it consists
of the materials and construction necessary to support
it on the building's walls or uprights and protect it from
rain, snow, sunlight, temperature extremes, and wind.
Roof area is limited which means it can be reach using
a ladder. In my case, I don’t have a long ladder that
can reach my roof, so because of that it will prevent
me from making an inspection. According to my rough
vision, my roof has a defect that it will leak when it rains
and it will make the ceiling look wet.

Location: roof top

2. Ceiling Ceiling also a high element in the building. It is too high


and hard to do the inspection. Thus, I don’t have long
ladder so it will risk myself if I do the inspection at
there. Basically, defect in the ceiling is crack because
the roof is leakage due to heavy rain. So, the ceiling
will damp and damage.

Location: Ceiling

13
3. Foundation This is because the foundation is located under the
building and cannot be access. Thus, it should be
under special instructor if want to do the inspection.

Location: Underground

4. Internal wall Inspection cannot see inside the internal wall since it
is covered by huge furniture such as a kitchen cabinet
or electrical wiring.

Location: kitchen

14
CHAPTER 3.0 SCOPE OF WORKS

3.1 Building Inspection

A building inspection should be carried out by a building inspector. A building inspector is often
employed by a city, township, or county and is qualified in one or more areas, allowing them
to make expert judgments regarding whether a facility complies with building code standards.
A building inspector can be licensed as a residential or commercial building inspector, a
plumbing, electrical, or mechanical inspector, or any other specialty-focused inspector capable
of examining structures at various phases of construction.

3.1.1 Condition Survey Procedure

1. Conformation on client instruction

Based on this case study, confirmation of the client's instructions is required before the
inspection may begin. The Building Condition Survey and Assessment (BCSA) was used as
a reference by the clients, Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani Binti Ngah
Abdul Wahab, who required a detailed assessment of this single Storey terrace house from
the beginning to the end. A building surveyor's job is to understand the building problems and
possible causes of the problems and defects in terms of symptoms, causes, and treatments,
and then to suggest suitable solutions to the problems while following the client's instructions.

2. Preliminaries survey or procedures

This home was constructed in the year 8 February 2015 and will be completed in the year 10
October 2016. The construction work took almost 20 months. Puan Rabiaton is the owner of
the building, which has been in use since 20 February 2017.

3. Preparing tools and equipment

Tools and equipment are insufficient for this inspection because everyone in this online
distance learning system had to inspect their own home, so tools became a limitation. In this
residence, there are only a few instruments and tools, such as a spirit level and a measuring
tape.

4. The inspection procedures


i. A preliminary inspection of the entire property to familiarize the surveyor with the
various types and layouts.
ii. An important standard of the main roof and any accessible subsidiary roof voids.
iii. Inspection and assessment of elevation, including structures and finishes, room by
room.

15
iv. A study of the roof structure and coverings from the ground level, using binoculars, if
necessary, as well as from ladders or roof voids when available.
v. The elevation is checked, as well as the building finishes. Inspect the site's
boundaries, outbuildings, and surroundings.

5. Report and submission to client

The client, Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani Binti Ngah Abdul Wahab, will
make a complete report with all of the data from the building inspection.

16
3.1.2 Inspection Procedure

1. A preliminary inspection of whole property to familiarizes the surveyor with


types and layout.

Based on this case study, confirmation needed on the client instruction before start the
inspection. Based on the client which are Noor Azlina Binti Kamarulzaman and Ts. DR. Suriani
Binti Ngah Abdul Wahab, The Building Condition Survey and Assessment (BCSA) and refer
Code of Practice off Building Surveying (CPBS101) as a reference that needs a detail of this
single storey terrace house from the first until finish the inspection. For a building, it is important
for a building surveyor to understand the building defects and the possible causes of the
problems and defects in relation to the symptoms, causes, and treatments, and then to
propose appropriate solutions to the problems in terms of following the client's instructions.

2. A detail inspection of main roof and subsidiary roof which are accessible.

Because there is no access door to the roof, this house's roof has a restricted amount of
space.

3. Room by room inspection and examination of elevation including structures and


finishes.

NO BUILDING ELEMENTS PROBLEMS


1. Wall • Cracks
The walls in this building are plastered so the
vertical cracks typically form when the plaster
expands in humidity and shrinks as it dries.
2. Floor -
3. Ceiling • Paint is peeling off
The paint on ceiling surface is peeling
because of it have a dirty surface.

• Sagging ceiling
The water is soaking from leaking roof piled
onto ceiling plasterboard and pushing it
further towards breaking point.

17
4. Doors • Rusty door grill
The grill has rusted due to the fact that the
owner has not changed since the house was
built, but it is still usable.

5. Windows • Difficult in opening and closing of


glass panel
The window produces an unattractive sound
due to its rust.

4. An examination of the roof structure and coverings from ground level using
binoculars if necessary, and ladders or through roof voids where accessible.

The house is too height and I do not have any ladders so the inspection cannot be continued.

5. An examination of elevation, including the structure finisher


6. Inspection of site boundaries, outbuilding and surrounding external

18
3.1.3 TOOLS & EQUIPMENT

There are 4 tools that has been used to start the inspection towards this house. The tools and
equipment that has been used are spirit level, l-square, tapping rod and measuring tape.

No. Tools & Equipment Description


1 Measuring tapes are a type of measuring
tape that you should have in your toolkit.
Whether you're an apprentice
construction worker, or a seasoned pro,
you'll utilize a tape measure on a regular
basis. The tool will help you get accurate
measurements for almost every area of

Figure 3.1.3.1 Measuring tape your project.

2 A spirit level is a tool for determining


whether a surface is vertical or horizontal
in reference to the ground. This
instrument may be used to examine the
horizontal and vertical alignment of
something in the construction process,
Figure 3.1.3.2 Spirit level such as the vertical brick layer and tile or
floor finishing.
3. Tapping rode were used to check the
hollowness, surface of the floor and wall.

Figure 3.1.3.3 Tapping Rod


4. L-square use to check the walls meet at
the right angle and also can be used to
check the windows and doors.

Figure 3.1.3.4 L square

19
3.1.4 TOOLS & EQUIPMENT LIMITATION

NO TOOLS & EQUIPMENT DESCRIPTION


1. The humidity, temperature, air velocity, and light
are all measured by this 4-in-1 metre.
Temperature and air velocity or relative humidity
are displayed on the dual LCD at the same time.
The built-in Type K input can be used to measure
high-temperature air or surface temperatures.

FIGURE 3.1.4.1
4-in-1 meter
2. Moisture metres are used to determine the
amount of water in a given substance. This
information can be used to evaluate if the material
is ready to use, if it is especially wet or dry, or if
additional inspection is required. The amount of
moisture in wood and paper goods is critical.

FIGURE 3.1.4.2
Digital moisture meter

20
3. The Digital Caliper (also known as the Digital
Vernier Caliper) is a precision measuring
equipment that may be used to measure both
interior and external lengths. The
distances/measurements are read from a digital
caliper's LCD display in the example below

FIGURE 3.1.4.3
Digital caliper

4. A hygrometer is a device that detects water


vapour in the air, soil, or other enclosed spaces.
When moisture is absorbed, humidity measuring
instruments typically use temperature, pressure,
mass, and a mechanical or electrical change in
the substance. These quantifiable values can be
used to compute humidity via calibration and
computation.
FIGURE 3.1.4.4
Hygrometer
5. The digital angle is a one-of-a-kind piece of
equipment that accurately and quickly measures
angles. It's useful for a variety of tasks, including
remodelling, cabinet installation, counter
installation, roof angle measurement, window or
door installation, aligning wood forms for concrete
pouring, installing carpeting and parquet or tile
floors, aligning and checking bannisters and rails,
and more. It features a lighted digital readout as
FIGURE 3.1.4.5 well as a hold button for pausing the
Digital angle meter measurement. When the pivot needs to be
clamped down to keep the measured angle from
shifting, the thumbscrew is used.

21
3.2 Measured Drawing Plan

22
3.3 Asset and Space Tagging

23
CHAPTER 4.0 BUILDING ELEMENTS

4.1 Civil/ Architecture/ Structure/ Finishing

No. Building Element Specification


1.
- 3.66m (length) x 1.55m (width) gates.
The main gate is made of wrought iron
that has been painted grey and shellac
coated.

Figure 4.1.1 – Gate

2.
- Mild steel sliding door grill with zinc
diecast door grille handle lockset.
2.70m (length) x 2.23m (height). Mild
steel is used and it is finished with
silver paint.

Figure 4.1.2 – Sliding Door

3.
- 2.70m (length) x 2.28m (height).
Sliding door grille made of mild steel
with a zinc diecast door grille handle
lockset. Mild steel is used, and the
project is finished with brown wood oil
paint and shellac

Figure 4.1.3 – Grill

24
4.
- Each panel is 0.65m in length by
1.13m in width and is 8 mm thick. Each
panel has an aluminium frame
casement window with a friction stay
and an aluminium lock set.

Figure
4.1.4 – Window

5.
- Mild steel window grille measures
1.85m in length and 1.71m in height.
Mild steel is used, and it is finished with
black oil paint and shellac.

Figure 4.1.5 – Window Grill


6.
- 0.63m (length) x 2.30m (height) with
0.028m (thickness), material door use
are pvc with plastic pvc door latch.
Door frame are pvc frame.

Figure
4.1.6 – Pvc Folding Door

25
7.
- On both sides, 0.11m brickwall was
used with 0.01m plaster. Using a
paintbrush, apply the finisher to the
wall.

Figure 4.1.7 – Internal Wall


8.
- Plaster board ceiling with cornice
skirting, 5.98m length x 3m width

Figure 4.1.8 – Plaster Slab Ceiling


9.
- For one tile with a 0.01m thickness, the
dimensions are 0.6m (length) x 0.6m
(wide) (thickness). White matte
porcelain floor tiles are the type of tiles
used. Porcelain with a white matte
finish.

Figure 4.1.9 – White Porcelain


Tile Floor

26
4.2 Electrical / Mechanical System

NO BUILDING ELEMENTS SPECIFICATION


1.
- 222mm (length) x 210mm (width,
material use are pvc and finishes with
white colour.

Figure 4.2.1 – Distribution Box


2.
- 176mm long x 176mm wide (width)
Three-gang and two-gang plug
switches with fluorescent locater
switches are made of bakelite and
finished in a white colour.

Figure 4.2.2 – 3 Gang Plug Switch


3. - Plastic surrounds the 13A single
switch socket, which is finished in a
white colour.

Figure 4.2.3 – Plug Socket


4.
- 5 blades fan with 54" diameter and
white finish. There are five different
speeds available.

Figure 4.2.4 – Ceiling Fan

27
4.3 MECHANICAL SYSTEM

NO BUILDING ELEMENTS SPECIFICATION


1.
- Indoor unit the dimension is
285mm (height) x 805mm
(width). Outdoor unit 555mm
(height) x 770mm (width).
Materials that used in air
conditioner is plastic, aluminium
and steel to reduce weight and
cost.

Figure 4.3.1 – Air Conditioner

28
CHAPTER 5.0 (FINDINGS)

5.1 Defect Sheet Using Building Assessment Rating System (BARIS)

NO OF DEFECT SHEET 1/10 LEVEL Ground Floor

LOCATION: Master Bedroom

ELEMENT/COMPONENT Internal wall/ plaster

BARIS
CONDITION PRIORITY MATRIX COLOUR

1 1 1

DEFECT DESCRIPTION

- Stains paint at the internal wall

Figure 5.1.1 (i) Foresight


POSSIBLE CAUSE/ SOURCE

- The stain occurs due to exposure to other


paints, the addition of the stain also occurs due
to the furniture being removed so as to leave
traces of the furniture on the wall.

REMEDIES

1. Mix a few drops of dishwashing liquid and warm


water in a medium sized bowl.
2. Dip your microfiber cloth into the solution. Wring
out the cloth so that it’s not overly saturated.
3. Rub the stain with the damp cloth until you can’t
Figure 5.1.1 (ii) Close View see the stain anymore.
4. Wait until the wall dries to be certain the stain is
gone. If ain’t, but still there, repeat the process.

29
NO OF DEFECT SHEET 2/10 LEVEL Ground Floor

LOCATION: Living Room

ELEMENT/COMPONENT Internal Wall/ plaster

BARIS

CONDITION PRIORITY MATRIX COLOUR


3 2 4

DEFECT DESCRIPTION

- There are cracks at the internal wall.

Figure 5.1.2 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- Cracks causes of the contraction and expansion


of building materials due to fluctuations in
temperature and moisture content.

REMEDIES

1. Cover the crack with either mesh joint tape or


joint compound and paper tape.
2. Followed by a thin layer of joint compound,
extending about 2 inches on each side of the
tape.
3. Allow to dry.
Figure 5.1.2 (ii) Close View 4. Apply a second coat of joint compound,
feathered approximately 6 to 7 inches on either
side of the cracks.
5. Allow to dry at overnight.

30
NO OF DEFECT SHEET 3/10 LEVEL Ground Level

LOCATION: Kitchen

ELEMENT/COMPONENT Internal wall/ Plaster


BARIS
CONDITION PRIORITY MATRIX COLOUR

1 1 1

DEFECT DESCRIPTION

- Unevenness paint on the internal wall

Figure 5.1.3 (i) Foresight POSSIBLE CAUSE/ SOURCE

- Overlapping dry paint with paint causes these


uneven stripes to appear.

REMEDIES

1. Clean the wall with soap and water to remove


any grease, oil or other residue on the paint.
2. Apply a thin coat of drywall joint compound
over the uneven area with a 3-inch taping
knife. Allow it to fully dry and sand lightly.
3. Go over the same area again with another
layer of joint compound using your 6-inch
taping knife. Once again, allow it to dry fully
and sand the wall lightly.
4. Apply a third and final coat of joint compound
using your 8-inch taping knife. By now, the
joint compound should be slightly elevated
over your surrounding wall surface. Sand
down the joint compound until your wall is

Figure 5.1.3 (ii) Close View perfectly smooth and level.


5. Prime and paint the patched area to match
your existing wall.
6. Clean all the debris.

31
NO OF DEFECT 4/10 LEVEL Ground Level
SHEET
LOCATION: Bedroom 1

ELEMENT/COMPONENT Ceiling/ Plaster


BARIS
CONDITION PRIORITY MATRIX COLOUR

3 2 6

DEFECT DESCRIPTION
- There are painting and coating at the ceiling.

Figure 5.1.4 (i) Foresight


POSSIBLE CAUSE/ SOURCE

- The ceiling is in an environment with high


humidity and excessive condensation.

REMEDIES

1. Adjust low shear viscosity of paint with


appropriate thickener.
2. Use proper reducer and viscosity adjustment
for environmental conditions.
3. Adjust spray gun and apply thinner wet coats.

Figure 5.1.4 (ii) Close View

32
NO OF DEFECT SHEET 5/10 LEVEL Ground Level

LOCATION: Living Room

ELEMENT/COMPONENT Ceiling/ Plaster


BARIS

CONDITION PRIORITY MATRIX COLOUR


1 2 2

DEFECT DESCRIPTION

- Small cracks formed at the ceiling

Figure 5.1.5 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- Materials that used will crack under stress and


pressure that’s accumulated over time.

REMEDIES

1. Use minimum possible quantity of water.

2. Employ large coarse aggregate.

3. Provide compression reinforcement if possible

4. Avoid formwork removal at early ages.

5. Cure concrete properly.

6. Assign proper cross section for the concrete


Figure 5.1.5 (ii) Close View
element.

33
NO OF DEFECT SHEET 6/10 LEVEL Ground Level

LOCATION: Bedroom 2

ELEMENT/COMPONENT Ceiling/ Plaster

BARIS
CONDITION PRIORITY MATRIX COLOUR

3 2 6

DEFECT DESCRIPTION

- There is effect of a leak in the ceiling.

Figure 5.1.6 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- The water is leaking from the ceiling is because


of leaking drain, loose supply line or missing
caulk.

REMEDIES

1. Identify and repair the root cause.


2. Clean the stain with bleach.
3. Apply a base coat of stain-blocking primer.
4. Cover the primer with ceiling paint.
5. Clean all the debris.

Figure 5.1.6 (ii) Close View

34
NO OF DEFECT SHEET 7/10 LEVEL Ground Level

LOCATION: Master Bedroom

ELEMENT/COMPONENT Door

BARIS
CONDITION PRIORITY MATRIX COLOUR
1 1 1

DEFECT DESCRIPTION

- Dated paint at the door.

Figure 5.1.7 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- The paint is detached due to the friction of the


clothes hanger iron.

REMEDIES

1. Clean the surface that you’re going to paint on


with sponge and warm water.
2. Open the paint container and start touching up
with sponge brush.

Figure 5.1.7 (ii) Close View

35
NO OF DEFECT SHEET 8/10 LEVEL Ground Level

LOCATION: Bedroom 1

ELEMENT/COMPONENT Door

BARIS
CONDITION PRIORITY MATRIX COLOUR

1 1 1

DEFECT DESCRIPTION

- The door makes a squeaky sound when opening


or closing it.

Figure 5.1.8 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- Friction in the hinge can be caused by a build-


up of dirt or dust, or a lack of lubrication between
the metal surfaces of hinge and hinge pin. It is
this friction and rubbing of metal on metal which
causes the squeaking sound.

REMEDIES

1. Try to lubricate the hinge pin without removing it.


2. Remove the hinge pin using a hammer and nail
punch.
3. Coat your hinge pins in white grease.
4. Put the pins back into the hinge.
5. Wipe down any excess oil.

Figure 5.1.8 (ii) Close View

36
NO OF DEFECT SHEET 9/10 LEVEL Ground Level

LOCATION: Bedroom 3

ELEMENT/COMPONENT Window
BARIS
CONDITION PRIORITY MATRIX COLOUR

1 1 1

DEFECT DESCRIPTION

- Physical damages and scratches on frame and


glazing

Figure 5.1.9 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- Inadequate protection during fabrication,


delivery, storage and installation.

REMEDIES

1. To inspect the component before delivery and


prior to installation.
2. To provide proper storage space.
3. To minimize unnecessary handling during
delivery, storage and installation.
4. To provide adequate protection to frames and
glazing. Protection should be kept in tact until all
works are completed.

Figure 5.1.9 (ii) Close View

37
NO OF DEFECT SHEET 10/10 LEVEL Ground Level

LOCATION: Kitchen

ELEMENT/COMPONENT Window

BARIS
CONDITION PRIORITY MATRIX COLOUR

1 1 1

DEFECT DESCRIPTION

- Gaps at window frame corner.


Figure 5.1.10 (i) Foresight

POSSIBLE CAUSE/ SOURCE

- Poor workmanship during fabrication and


installation.

REMEDIES

1. Carry out cuttling and assembly of frames using


mechanical tools.
2. To protect the frames during delivery and
storage.

Figure 5.1.10 (ii) Close View

38
5.2 Overall Building Rating

NO ELEMENT/ DEFECT BARIS


COMPONENT /FAILURE
CONDITION PRIORITY MATRIC NO. OF DEFECT
(a) (b) (a x b) DEFECT INDICATION
CODE

1 Internal Stain paint 1 1 1 1 A1


wall/plaster
2 Internal Vertical crack 3 2 6 2 A2
wall/plaster on plaster
3 Internal Unevenness 1 1 1 3 A3
wall/plaster paint
4 Ceiling/ plaster Painting and 3 2 6 4 A4
coating
5 Ceiling/ plaster Vertical 1 2 4 5 A5
cracks on
plaster
6 Ceiling/ plaster Leaking 3 2 6 6 A6

7 Door Dated paint 1 1 1 7 A7

8 Door Squeaky 1 1 1 8 A8
sound
9 Window Physical 1 1 1 9 A9
damages and
scratches
10 Window Gaps at 1 1 1 10 A10
window
corner
Total Marks 28
[d]
Numbers of 10
defects [e]
Total Score 2.8
[d/e]
Overall Good
Building
Rating

No. Building rating score


1 Good 1 to 4
2 Fair 5 to 12
3 Dilapidated 13 to 20

39
5.3 Defect Indication Plan

A10

A3

A9

A6

A8

A4 A5

A7

A1 A2
11

40
5.4 Defect Indication Table

DEFECT INDICATION CODE NO. PHOTO DEFECT TYPE

A1 5.1.1 Stain paint

A2 5.1.2 Vertical crack on plaster

A3 5.1.3 Unevenness paint

A4 5.1.4 Painting and coating

A5 5.1.5 Vertical cracks on plaster

A6 5.1.6 Leaking

A7 5.1.7 Dated paint

A8 5.1.8 Squeaky sound

A9 5.1.9 Physical damages and


scratches
A10 5.1.10 Gaps at window corner

41
5.5 Defect Analysis

Sales

10%
Stain
10%
Cracks
40%
Unevenness
10%
Leakage
Squeaky Sound
10%
Gaps Window
20%

Figure 5.5.1 Pie Chart of Building Condition Assessment

Based on the pie chart shown above, the highest percentage of defects in this case study is
“stain” with 40%. The second highest is “cracks” with 20%. Other than that, defects such as
“unevenness, leakage, squeaky sound and gaps window” is 10% for each. For stains on the
internal wall, the stains occurs due to other paints, the addition of the stain also occurs due to
the furniture being removed so as to leave traces of the furniture on the wall. Next for the
ceiling it also can cause of workmanship poor or the ceiling is in environment with high humidity
and excessive condensation.

Next, the second highest od defect percentage has been shown at defect pie chart which is
“cracks”. The total of this defects is 20%. It can caused by the unskilled worker during they
work. Other than that, it also can cause by the contraction and expansion due to fluctions in
temperature and moisture content. For others defects such as “unevenness, leakage, squeaky
sound and gaps window”. Each of the defects is 10%. The defects is not so severe, in fact the
existing damage will be under observation so that it does not get worse. In conclusion, the
damage in this building doe not have much because the house is still new.

42
CHAPTER 6.0 (RECOMMENDATIONS AND CONCLUSION)

First of all, I would like to give a big thanks towards my building surveyor practice (BSR205)
lecturer, Puan Noorazlina binti Kamarulzaman and Ts.Dr. Suriani binti Ngah Abdul Wahab
who were helping us a lot in completing our task in Building Condition Assesment report. From
their crit session and lecture video every week it has helping me a lot to complete this second
task with a full guidance from them. After the crit session from every week we had already be
commented to make an amendment based on our progress work from week by week. They
will make sure their student managed to get all the information and understand to do the task
smoothly.

Other than that, through this second task that were given to us, I have learned to do an
inspection procedure with the SOP and I also manage to know how to use the building
assessment rating system (BARIS). Besides that, I also manage to identify and find the root
cause of defect problem in the buildings. Based on the defect that I found in my case study, I
advise this customer to take quick action to fix the problems, it is to avoid the significant
consequences. However, I as building surveyor student feel little bit frustrated because of we
cannot manage to go on site and see more defects on building and experienced to be on site.
Last but not least, I am grateful that I manage to complete this report.

43
CHAPTER 7.0 (REFERENCES)

1. https://en.wikipedia.org/wiki/Seri_Iskandar ( History of Seri Iskandar, Wikipedia,


December 2009)

2. https://www.bca.gov.sg/professionals/iquas/gpgs/awindow/awdefectsremedies.pdf
(Type of defects at grill, Construction Industry Development , April 1999)

3. https://www.si-restoration.com/resources/water-damage-clean-up/common-causes-
water-stains-ceilings (Causes of water stains on ceiling, Si Restoration, October
2012)

4. https://meteologix.com/my/weather/11184859-seri-iskandar (Weather forecast of Seri


Iskandar, Indexed by google)

5. https://gharpedia.com/blog/peeling-paint-common-defect/ (Causes of defect at wall,


August 2017, Ghar Pedia)

6. https://civilblog.org/2015/08/21/10-common-defects-found-in-paint-work/ (Common
defects of paint, Suryakanta, 21 August 2015)

7. https://en.wikipedia.org/wiki/Building_inspection (Building Inspection, Wikipedia,


2018)

8. https://www.google.com/maps ( To check the nearest store and plan location, 2019)

9. https://theconstructor.org/building/12-basic-components-building-structure/34024/
(Basic building element, indexed by google, March 2012)