INSPECTION CHECKLIST

FLOOR #: G+5
SECTOR: 2

GRID LOCATION: X(D-N)Y(2-6)

N
DUCTING SYSTEM YES N/A
O
Ductwork work installed as per drawings  
Duct size and material as per specification
 
Check flexible ducts and flexible connectors are installed at required
places as per approved drawings X
All access doors, fire dampers, VCD, are installed as per approved
drawing specifications and manufacturer’s instruction as applicable.  X
TESTING CHECK
Installation Checks Complete.

Test boundaries identified.
 
Smoke pellets as test media acceptable.
 
Relevant parties advised of test time.
 
All joints identified before test.
 
All joints visually checked for leaks.
 
Test acceptable.
 

THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND TO COMPLY WITH CONTRACT
SPECIFICATIONS.

CHECKED BY SUBCONTRACTOR: _____________________


Signature

WITNESSED BY CARILLION: ______________________


Signature

WITNESSED / ACCEPTED BY CONSULTANT: ____________________


Signature