INSPECTION CHECKLIST

FLOOR #: G+5
SECTOR: 1
GRID LOCATION: X(R-V) Y(2-6)

N
INSTALLATION OF FCU CHECKLIST YES N/A
O
Heaters installed as per drawings 
  
Isolators installed as per drawings
 
Die-electric union installed

All permanent supports installed.
 
All temporary supports removed.
 
TESTING CHECK
Installation Checks Complete.
  
Test boundaries identified.
  
Water as test media acceptable.
  
Relevant parties advised of test time.
  
All joints identified before test.
 
All joints visually checked for leaks.
 

THE ABOVE POINTS HAVE BEEN CHECKED AND FOUND TO COMPLY WITH CONTRACT
SPECIFICATIONS.

CHECKED BY SUBCONTRACTOR: _____________________


Signature

WITNESSED BY CARILLION: ______________________


Signature

WITNESSED / ACCEPTED BY CONSULTANT: ____________________


Signature