PROJECT: 3X660 MW NABINAGAR SUPER THERMAL POWER PLANT ANNEXURE NO : NEPL/N-001


CLIENT : BHEL/NTPC DATE: 26.08.22
CONTRACTOR : BYGGING INDIA LTD.
SUB-CONTRACTOR : NEXT TRACK ENGINEERING PVT LTD.

SR NO DRAWING NO REV NO MARK NO DESCRIPTION QTY (NOS) WEIGHT (KGS) REMARKS(WT.as per Drg.) DIFFERENCE REMARKS
KGS

1 BIL-BCC-BRBCL-620-C007-F02 1 144/PB-1&1X PLATFORM BEAM 2 10505.52 10505.50 0.02

2 BIL-BCC-BRBCL-620-C007-F02 1 144/PB-2&2X PLATFORM BEAM 4 1098.84 1029.36 69.48

3 BIL-BCC-BRBCL-620-C007-F02 1 144/PB-3&3X PLATFORM BEAM 2 5248.0225 5248.02 0.00

3 BIL-BCC-BRBCL-620-C007-F02 1 144/PB-4&4X PLATFORM BEAM 2 864.56 864.56 0.00

4 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-5&5X PLATFORM BEAM 2 1271.35 1222.06 49.29

5 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-6&6X PLATFORM BEAM 2 854.105 854.1 0.00

6 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-7&7X PLATFORM BEAM 2 1274.93 1225.64 49.29

7 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-8&8X PLATFORM BEAM 4 1761.36 1761.36 0.00

8 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-9&9X PLATFORM BEAM 4 461.4475 461.44 0.01

9 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-10&10X PLATFORM BEAM 4 97.7725 97.76 0.01

10 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-11&11X PLATFORM BEAM 2 42.9925 43.00 -0.01

11 BIL-BCC-BRBCL-620-C007-F03 1 144/PB-12&12X PLATFORM BEAM 2 40.7075 40.70 0.01

12 BIL-BCC-BRBCL-620-C007-F04 1 136/PB-1 PLATFORM BEAM 1 4998.3 4998.3 0.00

13 BIL-BCC-BRBCL-620-C007-F04 1 136/PB-4 PLATFORM BEAM 1 412.9725 412.97 0.00

14 BIL-BCC-BRBCL-620-C007-F04 1 136/PB-5 PLATFORM BEAM 1 409.845 409.84 0.01

15 BIL-BCC-BRBCL-620-C007-F04 1 136/PB-6 PLATFORM BEAM 1 29.97 29.96 0.01

16 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-2&2X PLATFORM BEAM 1+1 628.3 593.5 34.80

17 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-3&3X PLATFORM BEAM 1+1 628.3 593.5 34.80

18 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-7 PLATFORM BEAM 1 40.1175 40.12 0.00 136 /PB-8&8X NOT AVAIL.

19 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-9 PLATFORM BEAM 1 409.845 409.84 0.01

20 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-10 PLATFORM BEAM 1 412.9725 412.97 0.00

21 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-11 PLATFORM BEAM 1 38.975 38.98 0.00

22 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-12 PLATFORM BEAM 1 26.275 26.28 -0.01

23 BIL-BCC-BRBCL-620-C007-F05 1 136/PB-13&13X PLATFORM BEAM 2+2 428.7925 428.8 -0.01 136 /PB-14&14X NOT AVAIL.

24 BIL-BCC-BRBCL-620-C007-F07 1 91/PB-4 PLATFORM BEAM 1 412.9725 412.97 0.00 91 /PB-1&1X NOT AVAIL.

25 BIL-BCC-BRBCL-620-C007-F07 1 91/PB-5 PLATFORM BEAM 1 409.845 409.84 0.01

26 BIL-BCC-BRBCL-620-C007-F07 1 91/PB-6 PLATFORM BEAM 1 29.97 29.96 0.01

27 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-2&2X PLATFORM BEAM 1+1 628.3 593.50 34.80

28 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-3&3X PLATFORM BEAM 1+1 628.3 593.5 34.80

29 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-7 PLATFORM BEAM 1 40.13 40.12 0.01

30 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-8&8X PLATFORM BEAM 1+1 2776.07 1958.08 817.99

31 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-9 PLATFORM BEAM 1 409.845 409.84 0.01

32 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-10 PLATFORM BEAM 1 412.9725 412.97 0.00

33 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-11 PLATFORM BEAM 1 38.975 38.98 0.00

34 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-12 PLATFORM BEAM 1 26.275 26.28 -0.01

35 BIL-BCC-BRBCL-620-C007-F08 1 91/PB-14&14X PLATFORM BEAM 2+2 428.7925 428.8 -0.01 91 / PB-13&13X NOT AVAIL.

36 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-2&2X PLATFORM BEAM 1+1 831.72 789.2 42.52 46 / PB-1 & 1X NOT AVAIL.

37 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-3&3X PLATFORM BEAM 1+1 831.72 789.2 42.52 46 / PB-4 NOT AVAIL.

38 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-7&7X PLATFORM BEAM 1+1 73.9025 73.9 0.00 46 / PB-5 NOT AVAIL.

39 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-8&8X PLATFORM BEAM 1+1 89.1425 89.12 0.02 46 / PB-5 NOT AVAIL.

40 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-9 PLATFORM BEAM 1 30.9175 30.92 0.00


46 / PB-13&13X ,14,15,16,17-17X,18-
18X,19-19X NOT AVAIL.

Page 1 of 2
SR NO DRAWING NO REV NO MARK NO DESCRIPTION QTY (NOS) WEIGHT (KGS) REMARKS(WT.as per Drg.) DIFFERENCE REMARKS
KGS
46 / PB-13&13X ,14,15,16,17-17X,18-
18X,19-19X NOT AVAIL.
41 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-10 PLATFORM BEAM 1 27.43 27.42 0.01

42 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-11 PLATFORM BEAM 1 37.69 37.68 0.01

43 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-12 PLATFORM BEAM 2 77.075 77.08 0.00

44 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-20 PLATFORM BEAM 1 26.275 26.28 -0.01

45 BIL-BCC-BRBCL-620-C007-F11 1 46/PB-21 PLATFORM BEAM 1 33.895 33.9 0.00

TOTAL WEIGHT (K.G) 40288.49 39078.10 1210.39