Professional Documents
Culture Documents
Estimated Quantity of Temporary Construction
Estimated Quantity of Temporary Construction
Outward
side
16.21 165.69 117.49 642.00 976.05
0.32 3.31 2.35 12.84 19.52
25.08 28.17 8.90 9.30 83.46
129.65 1325.53 939.95 7808.40
ENCH (535m) (even) TRENCH (400m)
1
Trench Walls Cylindrical Trench Trench Trench Trench
columns Beams Floor Walls
Culvert
Inward TOTAL TOTAL
side
674.10 2292.15 480.00 240.00 720.00
13.48 45.84 9.60 4.80 14.40
0.32 101.97 0.62 15.21 62.40 78.23
5392.80 13201.20 1920.00 1920.00