SECOND SCHEDULE

PART E

EXPOSURE ASSESSMENT (Page 1 of 1) Factory : Ohgitani (S) Pte Ltd


Date : 23rd April 2013

No. of Measurement Duration of Exposure


Machine / Equipment Process / Activity persons Job Description of LAeq,T Time per day LAeq.8h
exposed persons exposed dB(A) (Minutes) (Hours and Minutes) dB(A)

Ground Floor & Compound


CM-A Unit Cutting 1 Operator 78.7 5 Minutes 8 78.7
CM-B Unit Cutting 1 Operator 78.5 5 Minutes 8 78.5
CM-C Unit Cutting 1 Operator 77.2 5 Minutes 8 77.2
SM-A Unit Separating 1 Operator 75.4 5 Minutes 8 75.4
SM-D Unit Separating 1 Operator 74.4 5 Minutes 8 74.4

Comments (i) Hearing Protectors Signs in displayed at the plant.


(ii) All areas were found to have noise level below Leq(8hr)85 dB(A).

Consultant Acoustical Laboratory Pte Ltd Tel: 6465 6212


SECOND SCHEDULE
PART E

Workplace ABC Pte Ltd


EXPOSURE ASSESSMENT (Page 1 of 1)
Date

No. of Measurement Duration of Exposure


Machine / Equipment Process / Activity persons Job Description of LAeq,T Time per day LAeq.8h
exposed persons exposed dB(A) (Minutes) (Hours and Minutes) dB(A)

Ground Floor & Compound


CM-A Unit Cutting 1 Operator 78.7 5 Minutes 8 Hours 78.7
CM-B Unit Cutting 1 Operator 78.5 5 Minutes 8 Hours 78.5
CM-C Unit Cutting 1 Operator 77.2 5 Minutes 8 Hours 77.2
SM-A Unit Separating 1 Operator 75.4 5 Minutes 8 Hours 75.4
SM-D Unit Separating 1 Operator 74.4 5 Minutes 8 Hours 74.4

Comments (i) Hearing Protectors Signs in displayed at the plant.


(ii) All areas were found to have noise level below Leq(8hr)85 dB(A).

Consultant