MAP-002 - Material Proposal For Reinforcing Bars (For Approval) Rev.A
MAP-002 - Material Proposal For Reinforcing Bars (For Approval) Rev.A
Description Date
0 Submitted for Approval 12-12-2022
FOR APPROVAL
Approved Reviewed
Approved with comment(s)
Returned with comment(s)
Other(s):
Signature
Name
Date
Signature
Name T. SAKO Y. FUNAHASHI K. HAMADA
Date 12-12-2022
TOA CORPORATION
Singer Project Office
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
Table of Contents
1. INTRODUCTION .................................................................................................................................................................. 2
2. REFERENCE SPECIFICATIONS, TESTING STANDARDS AND DOCUMENTS ............................................................................. 2
3. TECHNICAL REQUIREMENTS ............................................................................................................................................... 2
4. MANUFACTURER INFORMATION ....................................................................................................................................... 3
APPENDIX A – MANUFACTURER PROFILE ................................................................................................................................... 4
APPENDIX B – MANUFACTURER LICENSE AND CERTIFICATE ....................................................................................................... 5
APPENDIX C – MATERIAL SPECIFICATION AND TECHNICAL DATA SHEET ..................................................................................... 6
APPENDIX D – MILL TEST CERTIFICATE ........................................................................................................................................ 7
APPENDIX E – MECHANICAL TEST REPORT ................................................................................................................................. 8
APPENDIX F – CHEMICAL TEST REPORT ...................................................................................................................................... 9
APPENDIX G – OTHER REFERENCE ............................................................................................................................................ 10
1
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
1. INTRODUCTION
This document describes the proposed Reinforcing Bar material to be used for the Singer Bangladesh Limited –
Home Appliances Plant Construction Project, located at Araihazar, Narayanganj, Bangladesh.
BDS ISO 6935-2 Bangladesh Standard Steel for the reinforcement of concrete
3. TECHNICAL REQUIREMENTS
The table below shows the technical requirements indicated in the Contract Drawings and BDS ISO 6935-2.
Proposed
Technical Manufacturer
Description Properties Remarks
Requirements ANWAR ISPAT
B500 DWR
Yield Strength Fy = 500 MPa
Fy = 500 MPa
Deformed
Bar for Bored Carbon As per Rebar Mechanical
Pile/ PC Piles Equivalent Value BDS ISO 6935-2 CEV = 0.51 and Chemical
(CEV) Max CEV = 0.61 properties shall
conform to the
requirements of
BDS ISO 6935-2
B420 DWR
Yield Strength Fy = 414 MPa
Fy = 420 MPa For Material details,
Deformed Refer to Appendix
Bar for other C, D, E and F
RC Structure Carbon As per
Elements Equivalent Value BDS ISO 6935-2 CEV = 0.49
(CEV) Max CEV = 0.56
2
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
4. MANUFACTURER INFORMATION
The following are the information of vendors for the proposed reinforcing bar materials (Refer to Appendix A and
B).
Business Address Anwar Group of Industries Baitul Hossain Building (12th floor), 27 Dilkusha
Commercial Area, Dhaka – 1000, Bangladesh
Email mail@anwargroup.net
3
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
4
About Anwar Group
Established in 1834 Anwar Group has built its strength on more than a century of experience.
The cornerstone of the group’s success is sharing knowledge to create relevant solutions-
shaping the best thinking to reflect ideas of a new age. Our corporate strategy emphasizes
speed, efficiency, flexibility and innovation in every facet of the company’s operation- from
product development to manufacturing, and from procurement to distribution, Anwar Group
strives to achieve the ultimate goal of satisfying its customers. Honesty, integrity and respect
for people are our core values and are the basis on which we do business. Through nation-wide
commitment to advancing this objective, Anwar Group and its many partners who share this
commitment, have succeeded in creating a national and international network that comprises
of many subsidiaries and affiliates. We are paving the path of our journey into a new
millennium for the next generation.
Anwar Group of Industries has been working as a development associate in building up the
homeland for almost two centuries. Now at the outset of the twenty-first century, the Group is
even more prepared to head the challenging demands of the new millennium. Highly qualified
management team, modern management techniques, and R&D have empowered the Group to
be the forerunner in economic progress of the country. Anwar Group was awarded as the most
diversified group of companies in Bangladesh. As part of its ‘Vision 2020’ the Group envisions
to make at least one product of Anwar Group available at every home in Bangladesh.
Our Concern
About Anwar Ispat
The century old Anwar Group has been in the steel manufacturing industry science 1978. Ever
science its entry into the mild steel market with 60 grade products for the first time in
Bangladesh, the group has continuously upgraded itself to bring the world’s latest & most
advanced technology to the Bangladeshi market.
Since its launch, Anwar Ispat 500W has been redefining the Bangladeshi Re–bar market.
Committed to bringing the world’s best technologies to the country, the group boldly opted to
introduce Europe’s pioneering technology from Belgium for its Quenching or TMT process.
For Rolling the group introduced, worldwide acclaimed rolling technology under US- Patent
No 4.629.165 7 US – Patent No 4.790.164. Anwar Ispat is the only proud user of such patented
technology in the local rolling industry.
Anwar Ispat, with its 500W Re – bars, gallantly leads the Country’s mild steel industry into the
export market. This achievement within one year of its launch is attributed to the Group’s
commitment to technology & relentless devotion of Team Anwar Ispat. The glorious
achievement has opened a new era for the country’s much required diversification of export
base, and will inspire Team Anwar Ispat to aim even higher in the future.
Capabilities & Resources
State-of-Art-Technology
Technology
▪ World acclaimed USA technology for Auto Rolling Mill US- Patent
No. 4.629.165 & US-Patent No. 4.790.164
▪ Pioneer TMT technology from Belgium
▪ Italian technology for Energy efficient Induction Furnace
▪ Italian technology for Continuous Casting Machine
▪ Ladle Refinery Furnace (LRF)
▪ CNC Machine
Production Capacity: 300000 MT/year till January 2021 & production capacity will be increase
to 400,000 MT/year by 2023.
Capacity: 22.7 MW
Chemical composition
controlled through
SPECTROMETER
Analysis from
receiving raw material
to deliver finished
good.
Customer Care:
Location Map:
5
15
Trade License
16
TIN Certificate
19
ISO-9001:2015 Certificate
21
Manufacturing Certificate
22
BSTI Certificate
23
24
Environment Clearance
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
6
27
S% ≤0.04 ≤0.05
N% ≤0.012 ≤0.012
C 0.30 0.34
Si 0.55 0.60
Mn 1.80 1.86
P 0.04 0.048
S 0.04 0.048
N 0.012 0.014
C 0.30 0.33
Si 0.55 0.6
Mn 1.50 1.56
P 0.04 0.048
S 0.04 0.048
N 0.012 0.014
7
SINGER BANGLADESH LIMITED – HOME APPLIANCES PLANT CONSTRUCTION
MAP-002 Material Proposal for Reinforcing Bar Rev. 0
8
BANGLADESH UNIVERSITY OF ENGINEERING AND TECHNOLOGY (BUET)
DEPARTMENT OF CIVIL ENGINEERING
Mobile 01819 557 964, PABX (8802)55167100, 56167228-57 Ext 7224, Information: http://brtc.ce.buet.ac.bd, Report verification htp:/verify.ce. buet. ac.bd
BT
Bureau of Research
Testing& Consultationn
STRENGTH OF MATERIALS LABORATORY
TEST OF DEFORMED M.S.BARSIASTM A615M-161 BRTC No. 1102-40146/CEI21-22: Dt. 22/8/2021
Sent by: Md. Mehbubur Rahman Ref 25.36.2600.241.30.011.2020-46 Dt 12/8/2021
Sub-Divisional Engineer, Dhaka PWD Sub-Division6,Segunbagicha, Dhaka Date of Test 23/8/2021
Project Construction ofRAB-3 Complex at Khilgaon, Dhaka under the Project of Construction of 5-RAB Complex and 1-RABForce Contractorsupplier AnwarIspat Ltd
Training School During the Year2019-2020 Samples werereceivedinSEALED Condition. Bend
FrogMarK/ Ba Actual Unit AverageYield orYieldorAverage Tensile ensileAvereage TS/YS ElongationAverage Test
No Identification Desig/ bar Weight Unit Proof Proof Yield or Proof Load Strength Tensile (%) Elongation
(%) (Seperate
Nomina dia WeightLoad Strength Strength Strength
samples)
dia YS TS) (G. length
kg/m MPa 200 mm)
mm mm kg/m MRa kN MPa MPa
ANWARS B420 DWR 32.16,340 352 438 438 535 665 660 Satisfactory
665 (95500 psi)D 1.51 20 21 Satisfactor
ANWARS B420 DWR 32.0 6.298 358 445 63500 pSU
ANWARS B420 DWR 32.2 6.394 3 4 7 431 519 645 22 Satisfactory
ANWARS B420 DWR 5
25.13.898 216 440 459 283 590 575 Satisfactory
NWAPR DWR (66500 psS Satisfactory
ANWARS420DWR 25.13.887/3879 234 44 605 85500 PSI) 20
9
ANwAR IsTaT LIMITED ,dt\
Kunia Pachor, Targacl4 Gazipur b;--Jf
AN\IJAtr GF:IOL}tr ax,lf,.+F"!P,rAr
AN'WARS BsOODWR
TstDatr:11,I2J2
Chemical Composition, rvt(%
Sample Description/
SI no CEV
Frcg Mark
C Mn si s P Cu N
t ANlryARS BSOODWR 1O 0.28 0.75 o.25 0.039 0.020 0.18 0.007 o.45
t ANW,TRS BsOODWR 12 0.30 0.80 8.24 0.035 o.025 0.19 0.008 o.47
4 ,A.NW-{RS Bs{X}DWR 2U 0.30 o.85 0-29 0.038 o.026 a19 0-008 o.48
5 ANW_ARS BSOODWR 25 0.32 o.91 o.24 o.039 0.022 0.20 0.006 0.51
6 ,{\I\t ARS I}stilrI}WR -32 0.31 $.97 0.29 0.037 o_028 0.18 o.009 0.s1
Inpt& Srrke.
HOD4A
ANWARS B42ODWR
Datc: lrE.l2,22
I ,LlvwARs 8410D$li l{l o.30 o.9z 0.19 0.035 0.038 0.10 o.008 o.49
3 AN1VARS B{?I}I}WR 16 o.2s 0.88 t).24 o.o35 0.o36 s.1z o.o08 o.47
4 A]\WARS B42ODWR 20 o.29 s.74 0.25 0.039 0.o:i4 o.08 o.005 8.45
5 Ai{}VARS B42ODWR 25 $.29 0.67 0.29 0.035 0.035 0.11 o.007 0.44
6 AN\}'"ARS B4zODWR 32 o.26 0.83 a.21 o.o39 0.033 0.0s 0.009 0"r14
s
Ltd
Ilipla Slrker
rror)-QA *:
10
Anwar Ispat Ltd.
List of Project using Anwar Ispat
Sl Supply
Name of Project Client Contractor Scope Remarks
No Duration
Hazrat Shahjalal CAAB ADC 10000 2020 to
1 Airport 3rd Terminal 0MT Continue
Extension Project
Western Bridge RHD(Roads and MONICO- 1005 2020 to
2 Improvement Project Highway CPC(JV) MT Continue
at Rangpur Department)
Western Bridge RHD(Roads and CPC 3000 2020 to
3 Improvement Project Highway MT Continue
at Rangpur Department)
Western Bridge RHD(Roads and Spectra 2300 2020 to
4 Improvement Project Highway Engineers MT Continue
at Magura Zone Department) Ltd.
Cross Border Road RHD(Roads and MONICO- 1230 2019-2020
5 Network Improvement Highway DIENCO (JV) MT
Project Department)
Construction of 400KV PGCB(Power Gird Transrail 2013 2019-2020
6 Transmission line at Company of Lighting MT
Rohanpur to Monkosha Bangladesh) Limited
400kv and 132 KV PGCB(Power Gird HG Power 780 2018-2020
7 Transmission line Company of Transmission MT
(Pakage-01) Bangladesh) Sdn. Bhd.
Gopalganj-Mongla 230 PGCB(Power Gird Kopataru 3580 2020 to
KV Double Circuit Company of Power MT Continue
8
Transmission Line on Bangladesh) Transmission
Turkey Basis Ltd.
Paira Bridge(Labukhali RHD(Roads and Lojian Roads 5025 2017 to
Bridge) Construction Highway and Bridge MT Continue
9
Project Department) Company
Ltd.
Balu Bridge at Madani 24 ECB 24 Engineer 7000 2015-2017
10
Avenue Construction MT
Excavation and 24 ECB 24 Engineer 1580 2015-2017
development of 100 feet Construction MT
wide khal along the
11
both side of Kuril
Purbachal link Road
project
400KV Madunghat- PGCB(Power Gird KEC 1720 2019 to
Matarbari Company of International MT Continue
12
Transmission Line Bangladesh
Project
Matarbari Bridge LGED Mir Akhter 2000 2018-2020
13
Project,Cox,s Bazar Hossain Ltd MT
Super-Specialized HED Hyundai 2025 2018-2020
14 Hospital Project under- Development MT
BSMMU Company
Kurigram Bridge RHD R.T.C 1000 2020 to
15
Project MT continue
SASEC-1 Road RHD SPECTRA 3500 2016-2021
16 Connectivity Project ENGINEERS MT
Packege-WP-1 LIMITED
SASEC-1 Road RHD DIENCO 4000 2016-2021
17 Connectivity Project LIMITED MT
Packege-WP-04
SASEC-I1 Road RHD CHINA 1500 2020 to
Connectivity Project CONSTRUC MT continue
Packege-WP-12 TION
SEVENTH
18
ENGINEERI
NG
DIVISION
CORP.LTD
SASEC-1I Road RHD CHINA 500 2020 to
Connectivity Project CONSTRUC MT continue
Packege-WP-10 TION
SEVENTH
19
ENGINEERI
NG
DIVISION
CORP.LTD
SASEC-1I Road RHD CHINA 500 2020 to
Connectivity Project CONSTRUC MT continue
Packege-WP-11 TION
SEVENTH
20
ENGINEERI
NG
DIVISION
CORP.LTD
Dhaka and Jamuna JAMUNA GROUP JAMUNA 2000 2014-2017
21 Electronics & GROUP MT
Automobiles Ltd
950 Meter Long Bridge LGED Navana 1500 2014-2017
22 over Dharla river at Construction MT
Kurigram Limited
850 Meter Long LGED Navana 1600 2014-2017
Gangachara Bridge Construction MT
23
over Teesta River at Limited
Lalmonirhat
BAPARD(Bangabandh BAPARD Navana 1015 2015-2017
u Academy for Poverty Construction MT
24
Alleviation and Rural
Development)
Hi-Tech Park at ICT Anwar 3025 2015-2017
25
Kaliakoir Landmrk Ltd MT
Janata Tower at Anwar 2012 2015-2017
26
Karwanbazar Landmrk Ltd MT
Karnaphuli Water BWDB(Bangladesh Anwar 1215 2015-2017
27 Supply Project(Phase- Water development Landmrk Ltd MT
2) Board)
Barendra Multipurpose BMDA Navana 1020 2015-2017
28 Development Authority Construction MT
(BMDA)
Rooppur Nuclear Bangladesh Atomic Anwar 3035 2015-2017
29 Power Plant Energy Landmrk Ltd MT
Commission)
Dhaka and Jamuna Jamuna Group Jamuna 2015 2015-2017
30 Electronics & Group MT
Automobiles Ltd.
Bhulta 4 Lane Flyover RHD(Roads and Spectra 3012 2017 to
31 Project Highway Engineers Ltd MT Continue
Department)
Dhaka Elevated BBA(Bridge Mir Akter 1233 2019 to
32 Expressway (DEE) PPP Authority Hossain Ltd. MT Continue
Project Bangladesh)
Construction of Flyover Rajshahi City DIENCO 1520 2020 to
in Rajshahi Corporation LIMITED MT Continue
33
City,Rajshahi City
Corporation
Construction Materials RHD China 2000 2017-2019
for Dhaka-Khulna(N-8) Harbour MT
34 Road Improvement Engineering
Project Company
Limited