Agriculture University Faisalabad (Beams for 1 Hostel)

TOTAL NO. OF
NO. OF UNITS
BAR LENGTH (m)

BAR LENGTH

NO. OF BARS
BAR MARK

PER UNIT
BAR NO.

BARS
MEMBER/ BAR SHAPE

(FT)
BAR SIZE
LOCATION (Sizes in FT)
#3 #4 #5 #6 #8

Hostels B-9 #4 1.5 9 1.5 12.000 36 7 252 3024.00

#4 2.5 1.2 2.5 6.200 36 7 252 1562.40

- -

B-18 #6 1.5 18 1.5 21.000 22 7 154 3234.00

#6 2.5 1.2 2.5 6.200 22 13 286 1773.20

- -

B-27 #6 1.5 27 1.5 30.000 6 7 42 1260.00

#6 2.5 1.2 2.5 6.200 6 18 108 669.60

- -

- -

- -

- -

- -

- -

- -
TOTAL LENGTH (FT) - 4,586 - 6,937 -

TOTAL VOLUME (CFT) - 6.371 - 21.199 -

TOTAL WEIGHT (Lb) - 3,122 - 10,387 -


TOTAL WEIGHT (Kg) - 1,416 - 4,711 -
TOTAL WEIGHT OF THIS SHEET 6,127 Kg. 6.13

Severage Pumping Station


BAR BENDING SCHEDULE

SHEET NO.
DRAWING REF. 2809/035/TD/G04
y Faisalabad (Beams for 1 Hostel)

BAR LENGTH (m)

BAR SIZE

#9

-
-
-
-
Tons.

Severage Pumping Station


BAR BENDING SCHEDULE

Rev.
0
2809/035/TD/G04
SEWERAGE PUMPING STATION AT LDA-1

TOTAL NO. OF
NO. OF UNITS
BAR LENGTH (m)

BAR LENGTH

NO. OF BARS
BAR MARK

PER UNIT
BAR NO.

BARS
MEMBER/ BAR SHAPE

(FT)
BAR SIZE
LOCATION (Sizes in FT)
#3 #4 #5 #6 #8 #9

Channel Per Linear ft of Running Length


B1 X #4 1 10 1 12.000 2 48 96 1152.00

B1 Y #6 15.5 1 16.500 2 30 60 990.00

B2 X #4 1 10 1 12.000 2 122 244 2928.00

B2 Y #6 40 1 41.000 2 30 60 2460.00

B3 X #4 1 10 1 12.000 2 176 352 4224.00

B3 Y #6 58 1 59.000 2 30 60 3540.00

- -

W1 ver #4 5 1 6.000 2 44 88 528.00

W1 hor #6 1 14.5 1 16.500 2 12 24 396.00

W1 lap #4 4 1 5.000 2 44 88 440.00

W2 ver #4 5 1 6.000 2 122 244 1464.00

W2 hor #6 1 40 1 42.000 2 12 24 1008.00

W2 lap #4 4 1 5.000 2 122 244 1220.00

W3 ver #4 5 1 6.000 2 20 40 240.00

W3 hor #6 1 6.5 1 8.500 2 12 24 204.00

W3 lap #4 4 1 5.000 2 20 40 200.00

W4 ver #4 5 1 6.000 2 62 124 744.00

W4 hor #6 1 20.5 1 22.500 2 12 24 540.00

W4 lap #4 4 1 5.000 2 62 124 620.00

W5 ver #4 5 1 6.000 4 150 600 3600.00

W5 hor #6 1 49 1 51.000 4 12 48 2448.00

W5 lap #4 4 1 5.000 4 150 600 3000.00

W6 ver #4 5 1 6.000 2 26 52 312.00

W6 hor #6 1 8 1 10.000 2 12 24 240.00

W6 lap #4 4 1 5.000 2 26 52 260.00

# - -

# - -

# - -
TOTAL LENGTH (FT) - 20,932 - 11,826 - -
TOTAL VOLUME (CFT) - 29.075 - 36.140 - -
TOTAL WEIGHT (Lb) - 14,247 - 17,709 - -
TOTAL WEIGHT (Kg) - 6,462 - 8,032 - -
TOTAL WEIGHT OF THIS SHEET 14,494 Kg. 14.494 Tons.

Severage Pumping Station


BAR BENDING SCHEDULE

Rev.
SHEET NO.
0
DRAWING REF. 2809/035/TD/G04
BAR SHAPE BAR SHAPE BAR SHAPE BAR SHAPE
1025 100
520 520 5975 6025 900 745 100
100
300 1930 100 1735
850 350 400 1970 800
1660 350 1735
1535 1735
6000 6000 1135 720 1135 300 800
100 1735
12000 1400 4535 300 7200 300 2420
600
300 1800 f 610 1800 1150 3625

400
500 3350 2000 500 f 525 400 2370 400 6540
400
740 500
500 6750 100 150 225 150 100 1600 5900 2100
2635
300 2235
10300 500 300 430 400
300 100 2200
400
8750 500 3400 1135 100 700 1070 400 1275

1280
600 750 300 300 325 80 200
100
100 1965 100
300 1000 925 100 745 400

300 250 1080 430 100 100 745 400


750
200 2370 200 100 2085 3365 300 100 100 745

JUST COPY AND PASTE THE SHAPES FROM CELLS - DO NOT TRY TO CHANGE THE SIZE OF CELLS
BAR SHAPE BAR SHAPE BAR SHAPE BAR SHAPE
200 2370 200 850 350

400 2370 400 520 520

300
300 1800
300
500 6750 f 525

8750 500 f 610

10300 500

12000

500 3350 2000 500


400
3400 1135 100

300 250
750
300
1660 350