2'W
S65°2
THESE WALLS NOT ATTACHED
T IC
TO BUILDING RAFT MAKKAH
G NE TH
01 02 03 04 05 06 07 08 09 10 11 12 13 A R
B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 M NO
*THE CONSTRUCTION BEFORE THE APPROVAL
NOTES
42000 OF MECHANICAL AND ELECTRICAL DRAWINGS
4200 4200 2100 2100 4200 4200 4200 4200 2100 2100 4200 4200
WILL BE UNDER CONTRACTOR RESPONSIBILTY.
- UNLESS OTHERWISE SHOWN ,ALL DIMENSIONS ARE IN MILLIMETERS
. ALL ELEVATIONS ARE IN METERS.
12600 16800 12600
- REINFORCED STEEL BARS SHALL BE DEFORMED HIGH GRADE STEEL
OF YIELD STRENGTH 4200 K.G/CM2
4200
Ø 25 @140 .BOTT. Ø 25 @140 .BOTT. Ø 25 @140 .BOTT.
Ø 25 @140 .BOTT. L=8000 Ø 25 @140 .BOTT. L=7000 Ø 25 @140 .BOTT. - ALL PIPES SLEEVES &OTHER BUILDERS WORK REQUIREMENTS FOR
L=9200+1500
L=8000 L=8000 ELECTRO-MECHANICAL WORKS SHALL BE COORDINATED WITH THE APPROVED
6750
5800
L=9500+1500
ELECTRO- MECHANICAL SHOP DRAWINGS BEFORE CONCRETING.
6750
6750
6750
Ø 25 @140 .BOTT. 00
20
20
00
B B
2970
20
20
LEGEND
00
2970
FOUNDATION W/RAFT Ø25@140
2100
2100
E.W. TOP&BOTT. (TYP.) *SLOPE STABALITY CALCULATION FOR THE
3630
@ AT FFL FINISH FLOOR LEVEL
4770
2100
2100
Ø 25 @140 .BOTT. Ø 25 @140 .BOTT. Ø 25 @140 .BOTT.
44
20
CANTILEVER BEAM WPM
WATER PROOFING MEMBRANE
L=10500 Ø 25 @140 .BOTT. L=12000 2310 CB
4300
D L=12000 Ø 25 @140 .BOTT. D Dia. DIAMETAR WWF WELDED WIRE FABRIC, WIRE MESH
1800
5550
5550
5550
B01 EL ELEVATION DENOTES MESH IN PLAN
E E EQ EQUAL
--- SECTION MARK NUMBER
B01 B01 EW EACH WAY ------
2400
NTS NOT TO SCALE
PRECAST DENOTES LEVEL IN PLAN
PC
F F RAFT REF REFERENCE
2000
B02
2000
B01 1500
Ø 25 @150 .BOTT.
1500
1500 1500
1500
Ø 25 @140 .BOTT. B01 KEY PLAN
Ø 25 @140 .BOTT. L=8000 Ø 25 @140 .BOTT. Ø 25 @140 .BOTT. L=10500+1500
L=9000+1500
6700
L=8000 L=7000
00
29400
Ø 25 @140 .BOTT.
20
20
4200
4200
00
2970
500
4770
1500 1500 Ø 25 @140 .BOTT.
1500
44
Ø 25 @140 .BOTT.
20
3950
L=12000
5950
Ø 25 @140 .BOTT. 8000 20000 SHOULD BE APPROVED BEFORE THE CONSTRUCTION
3950
G L=12000 8000 G B1
B01 B01
1500
1350
1500
1500
500
H H
4770
Ø 25 @140 .BOTT.
20
44
2700
Ø 25 @140 .BOTT.
L=10500+1500
THE CONSTRUCTION
42000
42000
1200
J Ø 25 @140 .BOTT. J
B01 B01
L=10500+1500
MUST BE AFTER THE
10200
8750
2700
CONFIRMATION FOR THE
3150
1500
Ø 25 @140 .BOTT. DWG. NO. TITLE
Ø 25 @140 .BOTT.
K L=10500+1500 2400
Ø 25 @140 .BOTT. L=10500+1500
K
ELEVATORS SHAFTS B01-S102 FOUNDATION PLAN
1500 1500
L=12000
Ø 25 @140 .BOTT.
B01 Ø 25 @140 .BOTT. 00 Ø 25 @140 .BOTT. B01 DIMENSIONS FROM
20
20
L=8000
1500
1500
00
2970
L=7500
L 20
00 Ø 25 @140 .BOTT. 000
2970
2 L ELEVATORS SUPPLIER
SHOP DRAWINGS REFERENCE .
B01 5500 B01
8750
3630
TITLE
ALL DIMENSIONS, LEVELS, OPENINGS DWG. NO.
4200
Ø 25 @140 .BOTT. 80
19
5000
19
2900
80
1540
1500
1500
Ø 25 @140 .BOTT.
WITH ARCH. AND MEP. DRAWINGS
1500
Ø 25 @140 .BOTT. L=6000 Ø 25 @140 .BOTT. Achitectural Sructural Electrical Mechanical Technical Office Manager
M L=9000 L=6000 M
B01 B01
2400
2400
8450
CLIENT
1800
1500
5550
2100
Fax: 011 4654230
P.O. Box : 18775 Post Code: 11425
Riyadh, Al Ma'ather Street
12600
Q Q
4200
CONTRACTOR
B01 B01 Bin Dubais Company
2100
1500
1500
Trading & Contracting
1500 1500 Ø 25 @140 .BOTT.
R Ø 25 @140 .BOTT.
1500
L=8000 R CONTRACTOR CONSULTANT
6750
6750
6750
6750
4200
4200
PROJECT NAME
APPROVALS
CLIENT
S S
B01 B01
TITLE
B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01 B01
01 02 03 04 05 06 07 08 09 10 11 12 13 1 SHOP DRAWING ISSUED FOR APPROVAL 06 / 06 / 2017 HAITHAM Ali Mohammad Shaaban Mohammad Shaaban
A DESIGN DRAWING ISSUED FOR APPROVAL 4 / 05 / 2017 HAITHAM Ali Mohammad Shaaban Mohammad Shaaban
0 SHOP DRAWING ISSUED FOR APPROVAL 19 / 04 / 2017 HAITHAM Ali Mohammad Shaaban Mohammad Shaaban
CONTRACTOR
3 RAFT FOUNDATION BOTTOM(X-DIR) REINFORCEMENT DETAILS REV. DESCRIPTION DATE DRAWN BY CHECKED BY APPROVED BY
1:100 1 : 100
CDHC-DWG-125-MB01-ST-0003