*THE CONSTRUCTION BEFORE THE APPROVAL

OF MECHANICAL AND ELECTRICAL DRAWINGS


WILL BE UNDER CONTRACTOR RESPONSIBILTY.
ALL DIMENSIONS, LEVELS, OPENINGS
AND SLEEVES SHOULD BE COORDINATED
08.06.2017 WITH ARCH. AND MEP. DRAWINGS

THE CONSTRUCTION
MUST BE AFTER THE
CONFIRMATION FOR THE
ELEVATORS SHAFTS
DIMENSIONS FROM
ELEVATORS SUPPLIER

*SLOPE STABALITY CALCULATION FOR THE


SOIL UNDER THE RAFT SHOULD BE APPROVED
BEFORE THE CONSTRUCTION
*COLUMNS AND AXES DRAWING FOR BASEMENT
SHOULD BE APPROVED BEFORE THE CONSTRUCTION