Professional Documents
Culture Documents
09494008112011 - الكراسة العامة - تطوير وتأهيل مباني مختبرات الهيئة بالدمام
09494008112011 - الكراسة العامة - تطوير وتأهيل مباني مختبرات الهيئة بالدمام
1. STRUCTURAL WORK
Page 2 to 4
2. ARCHITECTURAL WORK
Page 5 to 26
3. PLUMBING WORK
Page 27 to 35
4. HVAC WORK
Page 36 to 50
5. ELECTRICAL WORK
Page51 to 79
TOTAL AMOUNT
In Words :
NOTES :
The Contractor should consider while quoting
the necessary protection works to the existing
building structures in coordination with the
Engineer in-charge.
3
1.1 Excavation for foundation in any type of soil M 742
including dewatering.
3
1.2 Backfilling for foundation and below grade slab M 500
by suitable materials including compaction in
layers.
Page Sub-total
3.0 CONCRETE :
Including formwork, reinforcement, sundries,
embedded items not included elsewhere,
waterstopper, other concreting materials and
accessories.
3
3.9 Reinforced concrete for Elevator shaft up to M 6
grade slab.
Page Sub-total
5.1 10mm thick isolation joint with flexible filler and Lm 192
sealant.
Page Sub-total
Notes :
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
5.0 INSULATION
Page Sub-total
6.5 Door type D-3, single leaf, swing type fire rated Ea 2
hollow metal door on metal frame and door jamb
with semi-gloss enamel paint finish, with 8mm
thick single glazed tempered clear glass
transom and tight sealed with metal paint finish.
Provide door closer and all necessary
accessories. (0.90 x 2.7m)
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
7.0 WINDOWS
Including glazing, painting, hardware,
attachment materials and accessories,
complete as per drawing and schedule.
Checked actual clear dimension on site prior
to final fabrication and installation.
Page Sub-total
Page Sub-total
Page Sub-total
9.0 PLASTERING
10.0 FINISHES :
10.1.2 600 x 300 x 20mm thick Marble tiles for Stair M2 110
and Entrances landing.
10.1.3 Vinyl sheet flooring (3mm thick min.), anti static, M2 2,032
chemical resistant.
Page Sub-total
10.2 BASE :
10.4.1 200 x 200 x 6mm thk. Glazed ceramic wall tiles. M2 1,272
Page Sub-total
12.0 PAINTING :
12.1 WALL_PAINTING :
Page Sub-total
Page Sub-total
18.0 COUNTERS:
Supply and install the following Counters as
indicated in the drawings.
Page Sub-total
20.1 Supply & install Freezers & Cold storage wall Job 1 By Others
covering, floor covering and ceiling covering
insulated panels with doors as shown in the
drawing and as per manufacturer's standard
and approved by the client's representatives
including all other necessary materials and
accessories to complete the job.
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
3.5 VALVES :
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
6.2 VALVES:
6.5 VALVES:
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
2
6.1 Insulated duct. M 2,857
Page Sub-total
7.1 DIFFUSERS :
Page Sub-total
7.2 GRILLES :
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Branches:
1 - 500 AT / 630 AF, 3P, MCCB
2 - 300 AT / 400 AF, 3P, MCCB
7 - 100 AT / 100 AF, 3P, MCCB
2 - 70 AT / 100 AF, 3P, MCCB
Page Sub-total
Branches:
1 - 500 AT / 630 AF, 3P, MCCB
2 - 300 AT / 400 AF, 3P, MCCB
3 - 250 AT / 300 AF, 3P, MCCB
4 - 100 AT / 100 AF, 3P, MCCB
2 - 70 AT / 100 AF, 3P, MCCB
2 - 60 AT / 100 AF, 3P, MCCB
Page Sub-total
Page Sub-total
Branches:
4 - 100AT / 100AF, 3P, MCCB
4 - 60AT / 100AF, 3P, MCCB
Main:
2 - 250AT / 300AF, 3P, MCCB
with External By-pass Isolator Switch (EBIS),
250A, 3P.
Page Sub-total
Page Sub-total
Page Sub-total
Branches:
24 - 20AT / 100AF, 1P
Page Sub-total
Page Sub-total
Branches:
24 - 20AT / 100AF, 1P
Branches:
36 - 20AT / 100AF, 1P
Page Sub-total
Main:
60AT / 100AF, 3P, MCCB
Branches:
24 - 20AT / 100AF, 1P
Page Sub-total
Page Sub-total
3.0 CABLING :
Supply, installation, testing and commissioning
of cables on wall, roof or ground with suitable
G.S. clamps, spacers, supports, conduits, cable
trays, grounding, trenching, end connections,
concreting etc. from their corresponding panel
boards. All are in accordance with the drawing
and specifications.
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total
Page Sub-total