S.N.

Item detail
For RCC work up to plinth level 1 RCC 1:1.5:3 2 RCC 1:2:4 3 PCC 1:2:4 for finishing work 4 PCC 1:3:6 5 PCC 1:4:8 6 PCC 1:5:10 For Stone Masonry R R Stone masonry in CM 1:8 for Super 8 Structure R R Stone masonry in CM 1:8 for Foundation 9 and Plinth R R Stone masonry in CM 1:6for Super 10 Structure R R Stone masonry in CM 1:6 for Foundation 11 and Plinth Add Extra for stone masonry work for Height 12 Subsequent storeys (B45) 13 Add Extra for Coarse Masonry(Second Sort) Coarse stone masonry (first sort) in Super Str. 14 Add Extra for Rock Face Masonry 15 Add Extra for Ashlor work 16 Add extra for stone masonry Pillor For Brick Work 17 Brick masonry in CM 1:6 below Plinth 18 Brick masonry in CM 1:6 in Super Structure Add Extra Brick masonry for Height 19 Subsequent storeys (B34) Earth Work Earth work in trenches in soft soil up to 1.5 m 20 depth lead up to 50.0 M. Earth work in trenches in Hard Murrum up to 21 1.5 m to 3.0 m. depth lead up to 30.0 m Add extra for add. Lift for 1.5 m Plastering Plastering work 12 mm thick in CM 1:6 22 Plastering work 20 mm thick in CM 1:6 23 Plastering work 25 mm thick in CM 1:6 Miscallenous work Flushed Pointing work on RR stone masonry 24 work in CM 1:3 Ruled Pointing work on Ashlor or Rock Face 25 stone masonry work in CM 1:3 Ruled Pointing work on Ashlor or Rock Face 26 stone masonry work in CM 1:3(White Cement) 27 Brick Bat Cuba water proofing work . 28 Shuttering work in foundaion Shuttering work in super structure up to 3.0 m 29 height for

Unit
Cum Cum Cum Cum Cum Cum

Rates In Rs.
1475.52 1336.61 1317.28 1256.92 1134.51 1290.86

Cum Cum Cum Cum Cum Sqm Sqm Sqm Cum Cum Cum Cum Cum

1760.57 1664.96 1760.57 1664.96 88.03 65.36 81.70 101.68 1008.50 252.74 2633.46 2729.84 122.84

Cum Cum Cum Sqm Sqm Sqm

105.60 141.72 14.17 65.17 76.31 85.79

Sqm Sqm

53.38 53.38

Sqm Sqm Sqm Sqm

59.34 322.65 193.32 288.76

Circular / Hopper Shuttering work in super 30 structure up to 3.0 m height Labour charges for barbending work including 31 binding wire cost for per Ton of Tor steel Add Extra for Labour charges of barbending 32 work for 3.0 metre every subsequent slabs 33 40 mm th. Terrazo floor in white cement 34 Kota stone fixing work 35 Marble stone fixing work Back Filling with awilable excavated earth 36 within 15.0 m lead and 1.5 m height. 37 Antitermite treatment Stone kharanja/ Pitching work/ Stone soling in 38 Cum 39 Dry stone masonry work in Cum 40 Ashlar work for lintel and sill 15 CM thick Labour charges for fixing of wooden Door 41 frame/ M.S. door/ M.S. window for each 42 Labour charges for old wire fencing 43 Labour charges for New wire fencing For Curb Stone fixing work (old) in Running 44 metre 45 For Curb Stone fixing work (new) for in Rmtr 46 For Paver block fixing work(old) in Sqm 47 For Paver block fixing work (new) in Sqm 48 Grinding and polishing old existing floor Grinding and Mirror polishing New/ old existing 49 floor

Sqm

537.41

Ton Ton Sqm Sqm Sqm Cum Sqft Cum Cum Cum nos. Rmt Rmt Rmt Rmt Sqm Sqm SqFt SqFt

4433.22 142.48 413.47 481.97 986.87 61.60 4.25 975.55 953.11 4179.12 233.27 2.06 3.29 23.22 26.10 69.66 86.92