DryBMS People Subject Area No. 12 Contractor Management Final Draft

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Subject Area no.

12 Contractor management
Principle: The company develops and implements a process for the management of contractors and sub-contractors with emphasis on
the master’s and other officers’ and crew members’ related health and safety responsibilities.
Level Expectations Targets Suggested objective evidence
Basic HSSE familiarisation is provided to Familiarisation at a minimum will Quality and content of familiarisation
contractors working aboard. The include:
scope and depth of the familiarization - safety rules, following vessel safety
should be relevant to the rules will be mandated
responsibilities of the personnel - standard operating procedures
involved and the nature of the including PTW, risk assessment, PPE,
contracted task. drug and alcohol and hours of work.
- vessel hazards
- emergency procedures. Familiarisation records
The training will be provided by a
competent person and will be
recorded.

© Dry Bulk Management Standard 2021


Subject Area no. 12 Contractor management
Level Expectations Targets Suggested objective evidence
Intermediate Prior to work commencing a meeting A competent person will be appointed Pre-work meeting records
is held between the contractor and by the master to monitor contractor Risk assessment records
the person-in-charge /the master, performance. This person has the
where information will be exchanged authority to stop hazardous
regarding hazards presented by work contractor practices. Simultaneous operations procedures
being carried out by contractors.
Activities being carried out by vessel The company maintains a list of pre- Pre-qualification process
crew that may impact the contractors qualified contractors, where the input
will also be shared. to pre-qualification includes:
The company has a process to pre- - compliance with industry standards
qualify contractors prior to awarding on quality and HSSE
a contract. - personnel qualification and
resources
- previous experience in the type of
work.

© Dry Bulk Management Standard 2021


Subject Area no. 12 Contractor management
Level Expectations Targets Suggested objective evidence
Advanced The company has a procedure to Evaluation of potential contractors HSSE statistics included in pre-
review a contactor’s HSSE record including previous experience with qualification where appropriate.
prior to an award of contract, where the company; number and nature of
appropriate. accidents and incidents; availability of
equipment and resources; and ability
to deliver their services safely on
time.
The company has a process to provide Contractor feedback process
The company has a process to contact feedback to contractor
contractor management to correct
unsafe third-party behaviour.

© Dry Bulk Management Standard 2021


Subject Area no. 12 Contractor management
Level Expectations Targets Suggested objective evidence
Excellence The company has a formal contractor There are detailed procedures for Contractor HSSE management
HSSE management system in place. contractor management, which may system.
include: defining roles and
responsibilities for the management
of contractors; monitoring and
periodically reviewing contractor
performance through:
• Feedback from vessel.
• Feedback from contractor.
• Actual HSSE performance.
Contracting companies actively Ship-shore drills include contracting Involvement of contracting
participate in emergency response companies to test joint responses. companies in ship-shore drills
drills.

© Dry Bulk Management Standard 2021


Notes:

© Dry Bulk Management Standard 2021