MS Mercure Hotel PPM
MS Mercure Hotel PPM
METHOD STATEMENT
OPERATION &
MAINTENANCE OF
CHILLER PLANT AND
ASSOCIATED HVAC
EQUIPMENTS
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
I) INTRODUCTION:
This method statement describes specific working methods which will be used to carry out the task,
which is Operation and maintenance of Centrifugal chiller plant, cooling towers and associated HVAC
equipments in Mercure Hotel . It gives details of stepwise approach that needs to be performed to
make the work confined to the contractual requirements, health and safety issues and quality
controls. The content of the method statement can also be used for the preparation of risk
assessment.
II) DESCRIPTION OF THE WORK:
a) Technician/ supervisor to inform the necessary area authorities and obtain work permit
b) Lock out/tag out systems shall be implemented if applicable
c) Technician/supervisor to ensure availability of proper tools and equipment
d) Technician/supervisor ensure the availability of proper PPE
e) Technician/supervisor to conduct job briefing prior to start the activity
f) Technician/supervisor to ensure no oil spillage on the ground
Account Manager
a) Is the overall responsible site person and direct point of contact by client.
b) Ensure plant operator /technician is fully aware of the scope of work and methodology.
c) Ensure plant operator / technician is following the standard procedure for the required job
d) Ensure plant team is aware of the emergency procedure and communication during an
equipment breakdown scenario.
e) Ensure required tools and equipments are available
f) Ensure a service tickets are issues by technician after completing the job
g) Develop and implement PPM schedule.
Plant Operator
V) WORK METHODOLOGY
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
MATERIALS
1. TOOLS AND EQUIPMENTS
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
Rev: 0
US US CHILLER SERVICES
Project : MERCURE HOTEL
METHOD STATEMENT FOR OPERATION & MAINTENANCE CHILLER PLANT & Ref No: ASUC/MS/0376
ASSOCIATED HVAC EQUIPMENTS Date : 30/05/2021
a) All the electrical and/or rotating machinery hazards are isolated and locked out and/or made safe.
b) Adequate breaks to be taken to avoid prolonged exposure to sunlight and hot conditions.
c) Proper hats and sun glasses shall be used while working under direct sunlight / extreme hot
conditions.
d) Hearing protection shall be worn whilst working within the chiller area to avoid exposure to heavy
noise.
e) Appropriate safety footwear, protective overalls and eye protection shall be worn while at work.
f) All employees working in a chiller area must inform the area authority of their intent to do so, and
will also contact the Coordinator at completion of the work.
X) EMERGENCY PROCEDURE/EVACUATION:
Operatives are to follow all emergency procedures/evacuation as laid down by the client. Health
and safety information will be posted within the location.
a) Follow the emergency exit arrows posted on the location.
b) Exact location of the assembly point shall be communicated with the workers.
c) All the emergency numbers of the area authority and local authorities shall be posted in the
prominent locations
Rev: 0