This document provides an overview of key terms and topics related to building safety reforms following the Grenfell Tower fire:
1. It defines terms like high-risk residential buildings, building information modelling, the golden thread of information, and the draft Building Safety Bill.
2. It summarizes recommendations from the Hackitt Review, including establishing a new regulatory regime for high-risk buildings and improving product traceability.
3. It briefly outlines findings from the Grenfell Tower public inquiry regarding the fire's causes and spread, such as issues with the external cladding and compartmentation failures.
This document provides an overview of key terms and topics related to building safety reforms following the Grenfell Tower fire:
1. It defines terms like high-risk residential buildings, building information modelling, the golden thread of information, and the draft Building Safety Bill.
2. It summarizes recommendations from the Hackitt Review, including establishing a new regulatory regime for high-risk buildings and improving product traceability.
3. It briefly outlines findings from the Grenfell Tower public inquiry regarding the fire's causes and spread, such as issues with the external cladding and compartmentation failures.
This document provides an overview of key terms and topics related to building safety reforms following the Grenfell Tower fire:
1. It defines terms like high-risk residential buildings, building information modelling, the golden thread of information, and the draft Building Safety Bill.
2. It summarizes recommendations from the Hackitt Review, including establishing a new regulatory regime for high-risk buildings and improving product traceability.
3. It briefly outlines findings from the Grenfell Tower public inquiry regarding the fire's causes and spread, such as issues with the external cladding and compartmentation failures.
Chemical Industries Association 50–54; in-scope buildings 43–44;
(CIA) 26 Mandatory Occurrence Reporting cladding system 6, 83; structural safety System establishment 74; structure issues with 26 of 44–45; supplementary and Class 0 rating 22 general 54–56 clients 31–32 duties, higher-risk buildings 51–52 Committee on Industry duty holders: clients 31–32; Competence 46 contractors 33; designers 32–33; Common Data Environment (CDE) roles under CDM 73–74 Regulations 31, 32 common parts, definition of 50 compartmentation 16–18 Early Adopters Group 41 competence framework 3–4; building enforcement: Building Safety safety management 63–66; for Regulator 47; powers of 34–35 Named Individual BSM 65; raising Ethylene Propylene Diene Monomer the bar 60; setting the bar 60–63 (EPDM) 13, 14 competence standards 61 EWS1 4, 92, 93; problems with 90–91 Competence Steering Group (CSG) Explanatory Notes (EN) 43 3–4, 62, 63; for “Building a Safer external fire review process 88–89, 89 Future” 59 External Wall System (EWS) 88, Competent Person Scheme 66 89, 90 Computer Aided Design (CAD) 54 Considerate Constructors Scheme fees and charges, draft Bill 47 (CCS) 41 fire doors, Grenfell Tower 18–20 construction control plan 70, 73 fire emergency file (FEF) 31, 33, Construction Design and 70, 72 Management (CDM) Regulations fire, Grenfell Tower 7–8 31, 32 Fire Risk Assessment 85 construction products 55 fire safety advice notes 84–86 continuing professional development Fire Safety Bill 2020 55–56 (CPD) 62 Fire Safety in Purpose Built Blocks of contractors 33 Flats 17 crown, Grenfell Tower fire 14–16 fire safety reform 55 full plans 70, 73 Daeid, Niamh Nic 9 Decent Homes Programme 6–7 “Gateway 2 developer” 93 designers 32–33 the golden thread of building digital record 31, 33, 70–71; of information 36–37 traceability 78; use of 78–79 golden thread of information 3, Digital twin 74–75, 78, 79 4, 69; building information Distributed Ledger Technology modelling implementation 73–74; (DLT) 78 construction control plan 73; digital draft Building Safety Bill 61, 63, record 70–71; fire emergency file 67, 70, 73–74, 83; amendments 72; full plans 73 to Building Act 1984 48–50; Grenfell Inquiry 1 background 41–42; Building Grenfell Tower fire 1, 2, 5, 83, 84, Safety Regulator 45–48; building 92; fire 7–8; public inquiry (see safety risks 44; Explanatory public inquiry, Grenfell Tower); Notes 43; higher-risk buildings refurbishment 5–7, 6 Index 105 Hackitt, Dame Judith 1, 2, 23, 26–27, Local Authority Building Control 29, 30, 64, 71, 78, 79, 83, 84 services 30–31 Hackitt Review 1–4, 40, 48, 50, 52, London Fire Brigade (LFB) 17–18 59, 63, 69, 70, 83; interim report 27–28; new systems-based approach Mandatory Occurrence Reporting to building safety 29–37; System 48, 74 product traceability 76–78; systemic Martin, Jim 93n1 failure 29 May, Theresa 8 Hailey, Ross 93n1 Metal Composite Cladding Harley Facades Ltd 7 (MCM) 84 Health and Safety at Work, etc. Act Ministry of Homes Communities & 1974 34, 46, 49 Local Governments (MHCLG) 59, High Pressure Laminates 61, 83–86 (HPL) 84 Moore-Bick, Sir Martin 8, 9, 17, 20 high-risk residential buildings multi-occupied residential buildings (HRRBs) 1, 4, 16, 19, 20, 30, 86, 92 35, 40, 43, 50; accountable person 50–51; Building Safety Named Individual BSM 64; Charge 53–54; documentation competence framework for 65 for 79; duties 51–52; external National Fire Chiefs Council 16 wall system issues 90, 92; fire New Homes Ombudsman 54 safety of 59; functions of 45–46; government funding to assist over-cladding system 6, 7, 10, 12 residents 93; implementation of AN14 87; regulatory regime Phillips, Steve 93n1 for 41, 42; remediation works procurement 7, 36 to 83; residents 52–53; residents product testing 35–36 duties 53 product traceability 76–78 Housing Ombudsman 54 Professional Conduct Committee of the Architects Registration in-scope buildings 43–44 Board 55 Professional Indemnity Insurance Jenrick, Robert 42 (PII) 87–88, 91 “joined-up thinking” 30, 31 Project Information Model (PIM) Joint Competent Authority (JCA) 30, 74, 75 33, 34 protected escape route, Grenfell Tower 18–19 Kensington and Chelsea Tenant Public Approved Specification (PAS) Management Organisation standards 61 (KCTMO) 5, 7 public inquiry, Grenfell Tower 8; Kingspan 22 aluminium composite cladding material 10, 11, 12; crown 14–16; Lakanal House Fire 16–17 evidence at 9; lifts 19; phase 1 Landlord & Tenant Act 1985 54 inquiry 19–21; phase 2 inquiry Lane, Barbara 9, 13 21–22; protected escape route and Leadbitter Construction 7 fire doors 18–19; stay put policy lifts, Grenfell Tower fire 19, 20 and compartmentation 16–18; Local Authority Building Control window units 12–14, 13–15 Certificate (LABCC) 22 Purser, David 9