Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

104 Index

Chemical Industries Association 50–54; in-scope buildings 43–44;


(CIA) 26 Mandatory Occurrence Reporting
cladding system 6, 83; structural safety System establishment 74; structure
issues with 26 of 44–45; supplementary and
Class 0 rating 22 general 54–56
clients 31–32 duties, higher-risk buildings 51–52
Committee on Industry duty holders: clients 31–32;
Competence 46 contractors 33; designers 32–33;
Common Data Environment (CDE) roles under CDM
73–74 Regulations 31, 32
common parts, definition of 50
compartmentation 16–18 Early Adopters Group 41
competence framework 3–4; building enforcement: Building Safety
safety management 63–66; for Regulator 47; powers of 34–35
Named Individual BSM 65; raising Ethylene Propylene Diene Monomer
the bar 60; setting the bar 60–63 (EPDM) 13, 14
competence standards 61 EWS1 4, 92, 93; problems with 90–91
Competence Steering Group (CSG) Explanatory Notes (EN) 43
3–4, 62, 63; for “Building a Safer external fire review process 88–89, 89
Future” 59 External Wall System (EWS) 88,
Competent Person Scheme 66 89, 90
Computer Aided Design (CAD) 54
Considerate Constructors Scheme fees and charges, draft Bill 47
(CCS) 41 fire doors, Grenfell Tower 18–20
construction control plan 70, 73 fire emergency file (FEF) 31, 33,
Construction Design and 70, 72
Management (CDM) Regulations fire, Grenfell Tower 7–8
31, 32 Fire Risk Assessment 85
construction products 55 fire safety advice notes 84–86
continuing professional development Fire Safety Bill 2020 55–56
(CPD) 62 Fire Safety in Purpose Built Blocks of
contractors 33 Flats 17
crown, Grenfell Tower fire 14–16 fire safety reform 55
full plans 70, 73
Daeid, Niamh Nic 9
Decent Homes Programme 6–7 “Gateway 2 developer” 93
designers 32–33 the golden thread of building
digital record 31, 33, 70–71; of information 36–37
traceability 78; use of 78–79 golden thread of information 3,
Digital twin 74–75, 78, 79 4, 69; building information
Distributed Ledger Technology modelling implementation 73–74;
(DLT) 78 construction control plan 73; digital
draft Building Safety Bill 61, 63, record 70–71; fire emergency file
67, 70, 73–74, 83; amendments 72; full plans 73
to Building Act 1984 48–50; Grenfell Inquiry 1
background 41–42; Building Grenfell Tower fire 1, 2, 5, 83, 84,
Safety Regulator 45–48; building 92; fire 7–8; public inquiry (see
safety risks 44; Explanatory public inquiry, Grenfell Tower);
Notes 43; higher-risk buildings refurbishment 5–7, 6
Index  105
Hackitt, Dame Judith 1, 2, 23, 26–27, Local Authority Building Control
29, 30, 64, 71, 78, 79, 83, 84 services 30–31
Hackitt Review 1–4, 40, 48, 50, 52, London Fire Brigade (LFB) 17–18
59, 63, 69, 70, 83; interim report
27–28; new systems-based approach Mandatory Occurrence Reporting
to building safety 29–37; System 48, 74
product traceability 76–78; systemic Martin, Jim 93n1
failure 29 May, Theresa 8
Hailey, Ross 93n1 Metal Composite Cladding
Harley Facades Ltd 7 (MCM) 84
Health and Safety at Work, etc. Act Ministry of Homes Communities &
1974 34, 46, 49 Local Governments (MHCLG) 59,
High Pressure Laminates 61, 83–86
(HPL) 84 Moore-Bick, Sir Martin 8, 9, 17, 20
high-risk residential buildings multi-occupied residential buildings
(HRRBs) 1, 4, 16, 19, 20, 30, 86, 92
35, 40, 43, 50; accountable
person 50–51; Building Safety Named Individual BSM 64;
Charge 53–54; documentation competence framework for 65
for 79; duties 51–52; external National Fire Chiefs Council 16
wall system issues 90, 92; fire New Homes Ombudsman 54
safety of 59; functions of 45–46;
government funding to assist over-cladding system 6, 7, 10, 12
residents 93; implementation of
AN14 87; regulatory regime Phillips, Steve 93n1
for 41, 42; remediation works procurement 7, 36
to 83; residents 52–53; residents product testing 35–36
duties 53 product traceability 76–78
Housing Ombudsman 54 Professional Conduct Committee
of the Architects Registration
in-scope buildings 43–44 Board 55
Professional Indemnity Insurance
Jenrick, Robert 42 (PII) 87–88, 91
“joined-up thinking” 30, 31 Project Information Model (PIM)
Joint Competent Authority (JCA) 30, 74, 75
33, 34 protected escape route, Grenfell Tower
18–19
Kensington and Chelsea Tenant Public Approved Specification (PAS)
Management Organisation standards 61
(KCTMO) 5, 7 public inquiry, Grenfell Tower 8;
Kingspan 22 aluminium composite cladding
material 10, 11, 12; crown 14–16;
Lakanal House Fire 16–17 evidence at 9; lifts 19; phase 1
Landlord & Tenant Act 1985 54 inquiry 19–21; phase 2 inquiry
Lane, Barbara 9, 13 21–22; protected escape route and
Leadbitter Construction 7 fire doors 18–19; stay put policy
lifts, Grenfell Tower fire 19, 20 and compartmentation 16–18;
Local Authority Building Control window units 12–14, 13–15
Certificate (LABCC) 22 Purser, David 9

You might also like