TECHNICAL BACKGROUND
INDONESIA
2022
TABLE OF CONTENT
There will be 5 (five) PB production wells and 1 (one) PB injection well at the PB Mahato
Cluster 2 Location, with the Forecast Liquid Rate as follows:
2500 4,5E+07
4,0E+07
2000
3,5E+07
3,0E+07
Cumulative Liquid (bbl)
Liquid Rate (bbl/day)
1500
2,5E+07
2,0E+07
1000
1,5E+07
1,0E+07
500
5,0E+06
0 0,0E+00
2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042
Year
4,0E+07
2500
3,5E+07
2000 3,0E+07
2,5E+07
1500
2,0E+07
1000 1,5E+07
1,0E+07
500
5,0E+06
0 0,0E+00
2020 2022 2024 2026 2028 2030 2032 2034 2036 2038 2040 2042
Year
In Production Facilities Cluster 2, gross flowrate testing of each well will be carried out
by calculating the fluid receipts from the Test Tank. Gross fluids will be stored in a
Storage Tank before being shipped to PB Mahato Cluster 1 using a 6" pipe along 2 km
for further separation process.
In line with the plan to add production wells in Cluster 2 and the construction of
Production Facilities, a power plant is needed that can meet the needs of electrical power
as a result of the addition of active production wells in Cluster 2. The Power Plant to be
built has a capacity of 1.5 MW consisting of 5 (five) units of 250 Kva Diesel Engine
Generator (DEG) and 2 (two) units of GEG 125 Kva.
The processing scheme and supporting facilities at the PB Mahato Cluster 2 Location are
as follows:
FIRE WATER SYSTEM
PRODUCTION MANIFOLD
MAIN EQUIPMENT PB CLUSTER 2
TEST MANIFOLD
PB CLUSTER 2
Venting
PB
22
Production Tank
T-08/9/10
500 bbl
PB
23
Production Tank
T-06/07
PB
500 bbl
12
TRANSFER PUMP
P-02
PB
Production Tank
T-04/05
13
500 bbl
PB TRANSFER PUMP
P-01
14
Test Tank
T-01/02/03
500 bbl
M M M M M M M
G-01 G-02 G-03 G-04 G-05 G-06 G-07
20 FT 20 FT 20 FT 20 FT
PORTACAMP 1 PORTACAMP 2 PORTACAMP 3 PORTACAMP 4
No Description Remarks
1 Flowline 3” #300 from PB 22 to Manifold PB Cluster 2 Permanent Facility
2 Flowline 3” #300 from PB 23 to Manifold PB Cluster 2 Permanent Facility
3 Flowline 3” #300 from PB 12 to Manifold PB Cluster 2 Permanent Facility
4 Flowline 3” #300 from PB 13 to Manifold PB Cluster 2 Permanent Facility
5 Flowline 3” #300 from PB 14 to Manifold PB Cluster 2 Permanent Facility
6 Test Manifold 3” #300 complete with Future Connection Permanent Facility
7 Production Manifold 6” #300 complete with Future Connection Permanent Facility
8 Test Tank T-01 500 Bbl Rental Facility to purchase
9 Test Tank T-02 500 Bbl Rental Facility to purchase
10 Test Tank T-03 500 Bbl Rental Facility to purchase
11 Production Tank T-04 500 Bbl Rental Facility to purchase
12 Production Tank T-05 500 Bbl Rental Facility to purchase
13 Production Tank T-06 500 Bbl Rental Facility to purchase
14 Production Tank T-07 500 Bbl Rental Facility to purchase
15 Production Tank T-08 500 Bbl Rental Facility to purchase
16 Production Tank T-09 500 Bbl Rental Facility to purchase
17 Production Tank T-10 500 Bbl Rental Facility to purchase
18 Piping Installation Inlet-Outlet Tank ; Venting Tank; suction Permanent Facility
Transfer Pump
19 Transfer Pump P-01 & P-02 Permanent Facility
20 Sump Pump P-03 Rental Facility to purchase
21 Emergency Pit Permanent Facility
Utility :
No Description Remarks
Fire Water System
1 Fire Water Pond Permanent Facility
2 Diesel Fire Water Pump 01 Rental Facility to purchase
3 Diesel Fire Water Pump 02 Rental Facility to purchase
4 Diesel Jockey Pump Rental Facility to purchase
5 Fire Water Ring & Hydrant Pillar Permanent Facility
6 Shelter Permanent Facility
Portacamp
1 Portacamp 20 Ft Bed Room Rental Facility to purchase
2 Portacamp 20 ft Office Rental Facility to purchase
3 Portacamp 20 ft Bathroom Rental Facility to purchase
4 Portacamp 20 ft Mushola Rental Facility to purchase
5 Air Utilitas ( Pompa , Tangki, Water Treatment)
6 Shelter 100m2
Electrical Equipment :
No Description Remarks
Electrical For ESP
1 Genset 250 Kva G-01 Rental Facility
2 Genset 250 Kva G-02 Rental Facility
3 Genset 250 Kva G-03 Rental Facility
4 Genset 250 Kva G-04 Rental Facility
5 Genset 250 Kva G-05 Rental Facility
6 Electrical Panel (Syncronize Panel ) Rental Facility
7 Diesel Tank DT-01 20 KL Rental Facility to purchase
8 Diesel Tank DT-02 20 KL Rental Facility to purchase
9 Shelter Electrical
Electrical For Production Facilites
1 Genset 125 Kva G-06 Rental Facility
2 Genset 125 Kva G-07 Rental Facility
3 Electrical Panel (Syncronize Panel ) Rental Facility
4 Diesel Tank DT-03 20 KL Rental Facility to purchase
5 Shelter Electrical
Diesel Engine Generator will use the rental scheme on an ongoing basis.
The Force Major leaking handling event in anticipation of the inability to ship oil from
PB Mahato Cluster 2 to PB Mahato Cluster 1 was caused by a pipe leak. In PB Mahato
Cluster 2, gross delivery will be carried out so that it does not require settling time.
The calculation of storage time requirements is as follows:
The minimum requirement for a storage tank is 4631 bbl ~ 5000 bbl.
5. CALCULATION OF DIESEL ENGINE GENERATOR
There is a need for a Diesel Engine Generator as a power source for ESP. The load list
calculation for ESP Pump is as follows:
ELECTRICAL LOAD CALCULATION AND GENSET SIZING
ESP Pump M C 380 140.00 140.00 289.01 0.80 1 0.80 152.17 114.13
Auxilary M C 380 1.00 1.00 2.06 0.80 1 0.80 1.09 0.82
Notes: M = Motor Starter; F = Feeder; DOL = Direct On Line; SD = Star-Delta; SS = Soft Starter Total 153.26 114.95 0.00 0.00 0.00 0.00
C = Continuous; I = Intermittent; S = Stand-by; FLC = Full Load Current kVA 191.58 0.00 0.00
Peak Load Demand = 153.26 kW 114.95 kVAR 191.58 kVA 230.43 Ampere
The peak load demand for the main motor is at 191.58 kVa, and will be used The 250 kVa
generator will work at a load of 77%.
The needs of Diesel Engine Generators as a power source for Production Facilities and
Utilities are as follows:
Jockey Fire Water Pump M I 380 10,00 10,00 25,32 1,00 0,80 0,75 12,50 11,02
Transfer Pump P-01 M C 380 45,00 45,00 113,95 1,00 0,80 0,75 56,25 49,61
Transfer Pump P-02 M S 380 45,00 45,00 113,95 1,00 0,80 0,75 56,25 49,61
Sump Pump P-03 M I 380 5,00 5,00 12,66 1,00 0,80 0,75 6,25 5,51
Lighting & Utilities M I 380 5,00 5,00 12,66 1,00 0,80 0,75 6,25 5,51
Notes: M = Motor Starter; F = Feeder; DOL = Direct On Line; SD = Star-Delta; SS = Soft Starter Total 56,25 49,61 25,00 22,05 56,25 49,61
C = Continuous; I = Intermittent; S = Stand-by; FLC = Full Load Current kVA 75,00 33,33 75,00
Peak Load Demand = 74,38 kW 65,59 kVAR 99,17 kVA 150,67 Ampere
The peak load demand for the main motor is at 99.17 kVa, and the 125 kVa generator will
work at a load of 79 %.
6. EQUIPMENT DATASHEET
6.1. Flowline Well to Production Facilities
Qty : 5 Production Wells
Size : 3” sch. 40
Flange Rating : #300
Configuration : Underground & Aboveground
6.2. Header Manifold
Test Manifold : 3” sch. 40 for 5 Wells + Future Valve Connection + PG & TG
Production Manifold : 6” sch.40 for 5 Wells + Future Valve Connection + PG & TG
6.3. Storage Tank
Quantity : 10 ( Ten ) Units
Type : Square Tank
Capacity : Min. 500 BBL
Heating : Steam Heating by using heating coil
Instrument : Level Gauge, Temperature Gauge, Flame Arresster
Tank Table : Tank table certification by 3rd Party
6.4. Transfer Pump
Quantity : 2 (two) unit
Type : Centrifugal Horizontal Pump , mechanical seal
Capacity : Min 5000 BPD
Temperature : 200 deg.F (Design)
Flange discharge : Class #150
Flange suction : Class #150
6.5. Sump Pump
Quantity : 2 (two) unit
Type : Centrifugal Pump
Capacity : Min 1000 BPD
Temperature : 200 deg.F (Design)
Flange discharge : Class #150
Flange suction : Class #150