Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 4

TECHNICAL CLARIFICATIONS TO VENDOR OFFER

Client ONGC

Project ONGC_Redevelopment of Sobhasan Complex

TC Title TQ-1 For GDU Pkg Requisition (MR) Doc. No.: - -

Offer Document No. with date - NIQ-9417KPTL-R00-08 Rev-0 Dated 18th


Vendor M/s NIRMAL INDUSTRIES CONTROLS PVT LTD January 2023
Subject / Reference Clause
Sr No. Technical Clarification (TQ-1) Response from Vendor (TQ-1 Reply) Technical Clarification (TQ-2 / TQ-1 Closeout)
(In offer or RFQ)
A) General and Mechanical
1

10

11

12

13

14

15

16

17

18

19

20

B) Process
1 General Vendor to provide P&ID for the GDU package.
SIL requirement should be specified for the GDU Package as per the PDS (C327/PRO/PDS/A4/737) Note no. 4
2 SIL requirement

3 Hazop Vendor have to be present at the time of HAZOP meeting.

10

C) Instrumentation
1

10

D) Electrical
1

Page 1 of 4
TECHNICAL CLARIFICATIONS TO VENDOR OFFER

Client ONGC

Project ONGC_Redevelopment of Sobhasan Complex

TC Title TQ-1 For GDU Pkg Requisition (MR) Doc. No.: - -

Offer Document No. with date - NIQ-9417KPTL-R00-08 Rev-0 Dated 18th


Vendor M/s NIRMAL INDUSTRIES CONTROLS PVT LTD January 2023
Subject / Reference Clause
Sr No. Technical Clarification (TQ-1) Response from Vendor (TQ-1 Reply) Technical Clarification (TQ-2 / TQ-1 Closeout)
(In offer or RFQ)
2

10

E) Piping
1

10

F) Civil and Structural


1

NOTE:
1 Bidder to confirm the above requested data and provide his offer accordingly. In case of any discrepancies Bidder to clearly highlight the same.
2 In case Bidder fails to confirm a certain requirement; Bidder to provide technical justification for the same.

Page 2 of 4
TECHNICAL CLARIFICATIONS TO VENDOR OFFER

Revision : 1

Date : 11/XX/2022

Remarks
Response from Vendor (TQ-2 Reply) Technical Clarification (TQ-3 / TQ-2 Closeout)
(Open / Closed)

Page 3 of 4
TECHNICAL CLARIFICATIONS TO VENDOR OFFER

Revision : 1

Date : 11/XX/2022

Remarks
Response from Vendor (TQ-2 Reply) Technical Clarification (TQ-3 / TQ-2 Closeout)
(Open / Closed)

Page 4 of 4

You might also like