Page 1 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)
DAY: Month Day Year Weather Chart:
Date:
October 28 2022 Legend:

Work: 1st x Time (AM- PM) F– Fair S – Shower to Rainy


FRI
Shift: C - Cloudy B – Heavy Rain
2nd 7:00AM - 4:00PM
3rd W – High Wind T- Typhoon Name:
PLANNED ACTUAL
WORK DESCRIPTION START FINISH START FINISH
% ACCOMPLISHED REMARKS

A. PROCUREMENT
0.00% 100.00% 0.00% 0.00%
Purchase dependent on the submission of
A.1. Post Insulator for 230kV HV Equipment 0.00% drawing by Hansei and approval of APC
24-Sep 08-Dec

0.00% 100.00% 0.00% 0.00%


Purchase dependent on the submission of
A.2. Post Insulator for 23kV HV Equipment 0.00% drawing by Hansei and approval of APC
24-Sep 08-Dec

0.00% 100.00% 0.00% 0.00%


Purchase dependent on the submission of
A.3. Take-Off/Gantry Structure 0.00% drawing by Hansei and approval of APC
24-Sep 22-Dec

0.00% 100.00% 0.00% 0.00%


Purchase dependent on the submission of
A.4. Line Hardware with Accessories (bolts & connectors) 0.00% drawing by Hansei and approval of APC
24-Sep 25-Dec

0.00% 100.00% 0.00% 10.00%


A.5. Power, Control, and Communication Cables 10.00% PO issued to Manufacturer
24-Sep 10-Jan 01-Jun 23-Sep

0.00% 100.00% 0.00% 0.00%


Purchase dependent on the submission of
A.6. Grounding System & Lightning Protection 0.00% drawing by Hansei and approval of APC
24-Sep 10-Jan

0.00% 100.00% 0.00% 10.00%


A.7. Cable Trays and Conduits including necessary supports and accessories 10.00% Ongoing Fabrication
24-Sep 23-Nov 17-Aug 23-Sep

0.00% 100.00% 0.00% 10.00%


A.8. Protection Relays 10.00% PO issued to Manufacturer
24-Sep 04-Jan 17-Aug 23-Sep

0.00% 100.00% 0.00% 10.00%


A.9. Network Disturbance Monitoring Equipment (NDME) 10.00% PO issued to Manufacturer
24-Sep 04-Jan 17-Aug 23-Sep

0.00% 100.00% 0.00% 10.00%


A.10. Substation Automation System (SAS)/Bay Controller Unit (BCU) 10.00% PO issued to Manufacturer
24-Sep 08-Jan 17-Aug 23-Sep

0.00% 100.00% 0.00% 10.00%


A.11. Protection Management System (PMS) 10.00% PO issued to Manufacturer
24-Sep 04-Jan 17-Aug 23-Sep

B. CONSTRUCTION

B.1 LAOAG SUBSTATION

0.00% 100.00% 0.00% 100.00%


Site Survey Staking and Layout (PTR) 100.00% DONE
28-Oct 28-Oct 28-Oct 28-Oct

0.00% 100.00% 0.00% 60.00%


On-going
Excavation of Foundation (PTR) 60.00% *with rain
28-Oct 29-Oct 28-Oct 28-Oct

B. 2 LAOAG 2 SUBSTATION

0.00% 100.00% 0.00% 100.00%


Site Survey Staking and Layout (PTR) 100.00% DONE
28-Oct 28-Oct 28-Oct 28-Oct

B. 3 CAYANGA

C. OTHERS
0.00% 100.00% 0.00% 45.00%
Fabrication of spacer blocks for substation foundations 45.00% ON-GOING
30-Sep 29-Oct 30-Sep 26-Oct

0.00% 100.00% 0.00% 60.00%


ON-GOING
Laoag and Laoag 2 Substation Rebar Fabrication (PCB, DS CTm, PTm, PTp, SA) 60.00%
19-Oct 30-Oct 19-Oct 28-Oct

0.00% 100.00% 0.00% 85.00%


ON-GOING
Construction of Additional Storage for Rebars at Bugallon Stockyard 85.00%
26-Oct 30-Oct 26-Oct 28-Oct
Page 2 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)
DATE
WORK FORECAST REMARKS
FROM TO

Fabrication of spacer blocks for substation foundations September 30, 2022 November 29, 2022 ON-GOING

Laoag and Laoag 2 Substation Rebar Fabrication (PCB, DS CTm, PTm, PTp, SA) October 19, 2022 November 15, 2022 ON-GOING

Laoag and Laoag 2 Substation Concrete Pouring (PTR) October 28, 2022 November 08, 2022 ON-GOING

MONITORING OF SUBMITTED DRAWINGS

No. DTS Ref No: Subject Date Submitted Total No. of Drawings DRR Included Remarks

- - - - - - No submitted drawings for today

35 pending drawings from contractor for


SLD, TDS and Brochures - Substation
HC22ABO/SSTL-TSAD-DTS-01-Rev.01 11-Jul-22 66 0 resubmission
Portion

31 drawings returneddrawings
Six (6) pending with Reviewed
from and
contractor for resubmission
Schematic Diagram - Substation
HC22ABO/SSTL-TSAD-DTS-04-Rev.0 18-Jul-22 25 0
Portion
18 drawing returned with Reviewed and
Accepted status.

Panels Supplied by AC - Substation Two (2) pending drawings from


HC22ABO/SSTL-TSAD-DTS-05-Rev.0 18-Jul-22 2 0
Portion contractor for resubmission

Equipment Foundation Design


Four (4) pending drawings from
HC22ABO/SSTL-TSAD-DTS-06-Rev.0 including Calculations (Cayanga SS) - 18-Jul-22 4 0
contractor for resubmission
SS Portion
Three (3) pending drawings from
contractor for resubmission
TDS and Brochures for Power and
HC22ABO/SSTL-TSAD-DTS-07-Rev.0 18-Jul-22 6 0
Control Cable
Three (3) drawings returned with
Reviewed and Accepted status

Schematic Diagram - Substation 46 pending drawings from contractor for


HC22ABO/SSTL-TSAD-DTS-08-Rev.0 18-Jul-22 46 0
Portion resubmission

Overall SLD (Rev.0) & TDS and


One (1) pending drawings from
HC22ABO/SSTL-TSAD-DTS-11-Rev.0 Brochures Laoag and Cayanga SS 27-Jul-22 1 0
contractor for resubmission
(Rev. 1)

No new drawings included on this


HC22ABO/SSTL-TSAD-DTS-13-Rev.0 Single Line Diagram (Laoag SS) 05-Aug-22 0 0
submittal.

AC and DC Loading Nine (9) submitted drawings to client


HC22ABO/SSTL-TSAD-DTS-14-Rev.0 10-Aug-22 9 0
Requirements/Drawings waiting for formal comments thru DRR.
previously submitted

Six (6) submitted drawings to client


HC22ABO/SSTL-TSAD-DTS-15-Rev.0 125VDC Drawings and Calculations 18-Aug-22 6 0
waiting for formal comments thru DRR.

TDS including Detailed Drawings - TL No new drawings included on this


HC22ABO/SSTL-TSAD-DTS-16-Rev.0 19-Aug-22 0 0
Portion submittal.

21 submitted drawings to client waiting


HC22ABO/SSTL-TSAD-DTS-17-Rev.0 AC and DC Load Calculation Table 25-Aug-22 21 0
for formal comments thru DRR.

SS HVE Foundation Design and 40 pending drawings from contractor for


HC22ABO/SSTL-TSAD-DTS-18-Rev.0 26-Aug-22 40 0
Calculation - Laoag and Laoag 2 SS resubmission

No new drawings included on this


HC22ABO/SSTL-TSAD-DTS-19-Rev.0 SLD for Laoag 2 SS (Rev.01) 30-Aug-22 0 0
submittal.

SLD (Protection & Metering) and Three (3) drawings returned with
HC22ABO/SSTL-TSAD-DTS-21-Rev.0 01-Sep-22 3 0
Relay Function Table - SS Portion Reviewed and Not Accepted status.

230kV CT Foundation Design


Four (4) drawings returned with
HC22ABO/SSTL-TSAD-DTS-23-Rev.0 (Metering) Drawings including 05-Sep-22 4 0
Reviewed and Not Accepted status.
Calculations - Laoag and Laoag 2 SS

Design Document and TDS - SS 14 submitted drawings to client waiting


HC22ABO/SSTL-TSAD-DTS-24-Rev.0 05-Sep-22 14 0
Portion for formal comments thru DRR.

One (1) submitted drawings to client


HC22ABO/SSTL-TSAD-DTS-25-Rev.0 AC Design Criteria and Overall SLD 08-Sep-22 1 0
waiting for formal comments thru DRR.

Substation Plan and Layout,


Six (6) submitted drawings to client
HC22ABO/SSTL-TSAD-DTS-28-Rev.0 Perspective and TDS of Steel 13-Sep-22 6 0
waiting for formal comments thru DRR.
Structures
Page 3 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

No new drawings included on this


HC22ABO/SSTL-TSAD-DTS-29-Rev.0 SLD for Laoag SS (Rev.02) 13-Sep-22 0 0
submittal.

No new drawings included on this


HC22ABO/SSTL-TSAD-DTS-30-Rev.0 SLD for Cayanga SS (Rev.01) 16-Sep-22 0 0
submittal.

AC and DC Auxiliary Switchboard Nine (9) submitted drawings to client


HC22ABO/SSTL-TSAD-DTS-31-Rev.0 21-Sep-22 9 0
Diagram waiting for formal comments thru DRR.

MANPOWER
TRADE Qty. Location/Grid Work Performed/ Remarks TRADE Qty. Location/Grid Work Performed/ Remarks

Laoag and Laoag 2


Hansei - Aguilar Site Overall project management & client Construction of temporary facilities
Project Manager 1 Carpenter 4 Substation Temporary
Office coordinations and other works
faciity
Laoag and Laoag 2
Hansei - Aguilar Site Construction of temporary facilities
Site Engineer 3 Site monitoring and supervision Laborer 24 Substation Temporary
Office and other works
faciity

Hansei - Aguilar Site Administrative work and financial Construction of temporary facilities
Admin and Accounting 1 Welder/Steelman 4 Hansei - Aguilar Site Office
Office management and other works

Hansei - Aguilar Site


Admin Assistant 1 Administrative and office works Painter 1 Hansei - Aguilar Site Office Aide on maintaining of site
Office

Hansei - Aguilar Site


Doc. Con Officer 1 Documentation and filing Electrician 10 Hansei - Aguilar Site Office Aide on electrical works
Office

Laoag and Laoag 2


Lineman Construction of temporary facilities and
2 Substation Temporary Utility 1 Hansei - Aguilar Site Office Site office and staff house chores
Supervisor/Leadman other works
faciity

Hansei - Aguilar Site Construction of temporary facilities and


Site Nurse 1 Driver 2 Hansei - Aguilar Site Office Servicing of staffs and personels
Office other works

Civil Laoag and Laoag 2


Construction of temporary facilities and
Supervisor/Site/Asst. 4 Substation Temporary Warehouse Man 2 Hansei - Aguilar Site Office Issuance of site materials and tools
other works
Site Supervisor faciity
Laoag and Laoag 2
Construction of temporary facilities and
Mason 12 Substation Temporary
other works
faciity
74 As of Today
Total 74 As of Yesterday

MATERIALS DELIVERED TO SITE

Item No. Qty. Unit Materials Description Material Intended Purpose

SERVICE VEHICLES, TRUCKS & EQUIPMENT


Available
Breakdown
Work Performed/ Location / Operating Idle
Item No. Type Remarks
Grid
From To From To From To

SUPERVISOR, SITE ENGINEER AND PROJECT MANAGER ASSESSMENT


WORK PLAN EXECUTION FOR THE DAY

STATUS OF EXECUTION REASON/S FOR NOT EXECUTING THE WORK PLAN (fill-up if applicable)

ISSUES, CONCERNS AND OTHERS


GREY AREAS / PROBLEMS AT WORK SITE/ RECOMMENDED CORRECTIVE ACTIONS AND
ACTIONS TAKEN STATUS
OTHER CONCERNS SOLUTIONS
Land development by SUMEC is still on-going OPEN
Monitoring and coordination with APC and
on Laoag 1 and Laoag 2 Substation Area with Continuous monitoring and coordination
SUMEC for the targeted handover
some concerns 25-Oct-22

OPEN
Substation Designs Approval from APC Waiting for the approved drawing Follow up on the submitted drawings to APC
4-Jul-22

OPEN
Laoag 2 Laydown Area Waiting for the approval Submitted laydown area proposal to APC
28-Sep-22

OPEN
Awaiting schedule for clearing and interfacing
Cayanga Site Clearing Coordination with APC/JGC/RGB
*Will be discussed on Nov. 02, 2022
26-Oct-22

OPEN
Laydown Area for Cayanga Substation Coordination with APC and JGC To be clarified by Hansei, APC and JGC
26-Oct-22
Page 4 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)
Prepared by: Approved by: Conformed by:

RENZ OLEX MAR M. CANLAS Pierre De Dios Juller Pedro


Site Engineer Project Manager Aboitiz - Site Engineer
Page 5 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon,
Site Engineer Pangasinan
Project Manager S/S (SOLAR‐EPC‐003‐2021)
Hansei Bldg # 14 Sct Reyes cor Sct Gandia, Brgy. Laging Handa QC Tel Nos.: 332-1686/332-1649/408-7591

-----PROGRESS PHOTOS-----

Laoag Substation Layout and Excavation


(PTR, PCB and DS)

2022/10/28 8:35 2022/10/28 8:52

2022/10/28 10:35 2022/10/28 10:48


Page 6 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

2022/10/28 10:35
2022/10/28 10:35
2022/10/28 10:35

Laoag 2 Substation Layout


(PTR, PCB and DS)

2022/10/26 10:35

2022/10/28 2:35
Page 7 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

Fabrication of Rebars
Page 8 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

2022/10/26 1:32
2022/10/26 1:57
Page 9 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

Construction of Additional Storage for Rebars at


Bugallon Stockyard

2022/10/27 3:15

Weather Forecast
Page 10 LAOAG SS PROJECT - June 2022 Daily Accomplishment Report

HANSEI CORPORATION DAILY ACCOMPLISHMENT REPORT


Ref No.: DAR-22HC-LAOAGSS-ROMC-122-Rev.0

Project ID:
CLIENT: Aboitiz Power Corporation
Laoag and Laoag 2 Solar Power Project AC Project
Location : Brgy. Laoag, Aguilar & Brgy. Cayanga, Bugallon, Pangasinan S/S (SOLAR‐EPC‐003‐2021)

Typhoon Paeng