The document summarizes the progress of acquiring GPS-RTK points for a passive seismic survey over 24 days from December 16th to January 21st. It shows the number of points and lines acquired each date, with a target of 1263 total points. As of January 21st, the survey was near completion, having acquired 1225 points over 57 lines so far. The estimated finish date was January 23rd, assuming no delays from rain or schedule changes.
The document summarizes the progress of acquiring GPS-RTK points for a passive seismic survey over 24 days from December 16th to January 21st. It shows the number of points and lines acquired each date, with a target of 1263 total points. As of January 21st, the survey was near completion, having acquired 1225 points over 57 lines so far. The estimated finish date was January 23rd, assuming no delays from rain or schedule changes.
The document summarizes the progress of acquiring GPS-RTK points for a passive seismic survey over 24 days from December 16th to January 21st. It shows the number of points and lines acquired each date, with a target of 1263 total points. As of January 21st, the survey was near completion, having acquired 1225 points over 57 lines so far. The estimated finish date was January 23rd, assuming no delays from rain or schedule changes.