Job Safety Analysis

Main activity : Pump seal/bearing replacement/overhauling


Plant :
JSA Sheet No: Date of JSA :

S
Sub Activity Hazards & Risks Control Measures to be implemented
No
Isolation procedure will be
planned,reviewed and implemented by
FS/FE.
All valves will be tight closed and tagged
Exposure to HC/Toxic gas Remote and local push buttons of XV
release due to improper should be in stopped condition (if
isolation applicable)
Lock to be provided for suction and disc
Preparing the pump for handover. XVs (if applicable)
1 Ensure no hot work is in progress in
Electrical & Mechanical isolations
radius of 15m
Electrical isolation to be done from
substation
Injury /Electric Shock
Electrical isolation tag should be
during pump dismantling
available with permit
due to improper electrical
FE shall crosscheck isolation by pressing
isolation
start button before commencement of job
LOTO procedure to be followed.
Wherever possible draining/venting wil
be done to closed system/flare.
Completion of draining to be ensured by
Exposure to HC/Toxic
checking the level rise in CBD vessels.
2 Draining of pump holdup liquid release fue to improper
Ensure with open drain with help of
draining methods
personal H2S meter
If hot service allow sufficient time to cool
after isolation
3 Blinding of pump suction/discharge Stay in upwind direction
lines and seal flush lines FE will physically show the correct flange
to be opened
First loosen the flange on the side away
from the body, check for any leakage.
Use LEL/H2S detectors.
Exposure to HC/Toxic If valve seems passing immediately
release due to holdup tighten the flange. Keep arrangement
material or passing valve (tray/bucket) ready for collecting oil
Check seal pot level has been fully
drained
Keep cartridge mask ready for escape
If holdup material is expected to be more
(for gas services) use airline mask
Use full body apron, gloves and mask
Fire hazard due to holdup Collect holdup oil in trays
material falling on hot lines Use wet blankets over hot surfaces
Fire due to oil soaking Don’t allow oil into insulation
insulation Check that the insulation cladding
faces/ends are not damaged
Remove oil soaked insulation after the job
Use certified and right capacity
slings/chains (if required)
Injury due to improper Use spanner tied with strings
tool/lifting methods Protect SBCs nearby during lowering
Do not engage too many persons
Use correct hand tools
Injury during pump
Pump Coupling guard removal and
4 dismantling due to improper See Sno 1
decoupling
electrical isolation
Use correct tools
Pump Removal/Opening: Use mandatory PPEs.
Injury to workers
Coupling hub removal Proper lifting procedure to be followed if
Opening bearing housing and applicable
5
bearing removal Use Chemical resistant gloves.
Dismantling seal assembly Health hazard due to Wash hands after job
Cleaning of seal flush lines handling oil/grease Dispose all oily rags in accordance with
procedure

Pump Assembling installation,


6 deblinding, warm-up, alignment, As above All Above control applies
checking & coupling
Physical Injury while
7 All Sub Activities (1-6) Use correct tools. Use mandatory PPEs.
working
Done by :

Name :_______________________________ Designation: ______________ Sign ___________________


Date:

(Note: JSA Sheet to be done by issuer and requestor of work permit . In case of need, representative from other
discipline should also be involved )