Professional Documents
Culture Documents
List of Manpower
List of Manpower
Date : Saturday, October 23, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Extend due to ongoing concrete pouring for
Edcel Laureles Batching Operator 4:00 PM 6:00 PM tunnel segments.
NOTE:
ESTIMATED ACTUAL Work in excess of
eight(8) regular hrs.
without
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz prior approved
authorization will not
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali be considered
overtime and
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet therefore will not be
remunerated.
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Monday, October 25, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM documentation purposes.
Extend due to ongoing concrete pouring for
Diana Farrol Concrete Engineer 4:00 PM 7:00 PM tunnel segments.
Supervise the ongoing improvement works at
Randy Valencia RMC Foreman / QC 4:00 PM 7:00 PM batching area (roofing of water tank)
Slump testing and sampling of freshly mix
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM concrete.
Slump testing and sampling of freshly mix
Emmanuel Libres Lab. Sampler 4:00 PM 7:00 PM concrete.
Slump testing and sampling of freshly mix
Melvin Enciso Lab. Sampler 4:00 PM 7:00 PM concrete.
Slump testing and sampling of freshly mix
Junie Francisco Lab. Sampler 4:00 PM 7:00 PM concrete.
Slump testing and sampling of freshly mix
Paul Robles Lab. Sampler 4:00 PM 7:00 PM concrete.
Operates the batching plant for mixing of fresh
Jeffry Tolosa Batching Operator 4:00 PM 7:00 PM concrete for tunnel segments
Operates the batching plant for mixing of fresh
Rosebelt Ros Batching Operator 4:00 PM 7:00 PM concrete for tunnel segments
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of
eight(8) regular hrs.
without
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz prior approved
authorization will not
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali be considered
overtime and
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet therefore will not be
remunerated.
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Tuesday, October 26, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM documentation purposes.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of
eight(8) regular hrs.
without
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz prior approved
authorization will not
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali be considered
overtime and
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet therefore will not be
remunerated.
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Wednesday, October 27, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes.
Emmanuel Libres Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Melvin Enciso Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Junie Francisco Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Paul Robles Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Friday, October 29, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes.
Extend due to ongoing concrete pouring for tunnel
Diana Farrol Concrete Engineer 4:00 PM 7:00 PM segments.
Documentation, monitoring and processing of
Susan Corpuz DCC / Inventory 4:00 PM 6:00 PM ticketing in Acumatica system
Emmanuel Libres Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Melvin Enciso Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Junie Francisco Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Paul Robles Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Saturday, October 30, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 11:00 AM 4:00 PM purposes.
Emmanuel Libres Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Melvin Enciso Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Junie Francisco Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Paul Robles Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Marieto Buban Welder 11:00 AM 4:00 PM Welding works for roofing of chilled water tank.
Arnie Crisostomo Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Tuesday, November 2, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes and duty at Calumpit Plant
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Melvin Enciso Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Emmanuel Libres Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Frandy Ido Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Jeric Nachamag Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Irish Jane B. Pascual REQUESTED: Irish Jane B. Pascual authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Wednesday, November 3, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes and duty at Calumpit Plant
Extend due to ongoing concrete pouring for tunnel
Florence Aguilar Concrete Engineer 4:00 PM 7:00 PM segments.
Documentation, monitoring and processing of
Susan Corpuz DCC / Inventory 4:00 PM 7:00 PM ticketing in Acumatica system
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Melvin Enciso Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Emmanuel Libres Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Frandy Ido Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Jeric Nachamag Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Friday, November 5, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes and duty at Calumpit Plant
Extend due to ongoing concrete pouring for tunnel
Florence Aguilar Concrete Engineer 4:00 PM 7:00 PM segments.
Documentation, monitoring and processing of
Susan Corpuz DCC / Inventory 4:00 PM 7:00 PM ticketing in Acumatica system
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Melvin Enciso Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Emmanuel Libres Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Frandy Ido Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Jeric Nachamag Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
OVERTIME AUTHORIZATION
Date : Friday, November 5, 2021 Project : NORZAGARAY PLANT (Metro Manila Subway)
OVERTIME DURATION
NAME DESIGNATION ESTIMATED ACTUAL WORK DESCRIPTION
FROM
TIME TIME
*** DAY SHIFT ***
Supervision for RMC Department and documentation
Joshua Neale Bautista Concrete Supervisor 4:00 PM 6:00 PM purposes and duty at Calumpit Plant
Extend due to ongoing concrete pouring for tunnel
Florence Aguilar Concrete Engineer 4:00 PM 7:00 PM segments.
Documentation, monitoring and processing of
Susan Corpuz DCC / Inventory 4:00 PM 7:00 PM ticketing in Acumatica system
Supervise the ongoing improvement works at
Randy Valencia RMC Foreman / QC 4:00 PM 7:00 PM batching area (roofing of water tank)
Arnie Crisostomo Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
JC Salamanca Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Edilberto Lucas Jr. Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
Noli dela Cruz Lab. Sampler 4:00 PM 7:00 PM Slump testing and sampling of freshly mix concrete.
James Carlo Ramos Batching Helper 4:00 PM 7:00 PM Assist in concrete mixing at batching plant.
Elias Antao Loader Operator 4:00 PM 7:00 PM Operating of loader used in batching plant
Mervin Buenaventura Backhoe Operator 4:00 PM 7:00 PM Operating of back hoe for stocking area development
Jerry Monta Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Marieto Buban Welder 4:00 PM 6:00 PM Welding works for roofing of chilled water tank.
Melvin Enciso Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Emmanuel Libres Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Frandy Ido Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Jeric Nachamag Lab. Sampler 4:00 AM 7:00 AM Slump testing and sampling of freshly mix concrete.
Sherwin Cambal Batching Helper 4:00 AM 7:00 AM Assist in concrete mixing at batching plant.
Cristoper Manio Loader Operator 4:00 AM 7:00 AM Operating of loader used in batching plant.
NOTE:
ESTIMATED ACTUAL Work in excess of eight(8)
regular hrs. without
prior approved
REQUESTED: Susan S. Corpuz REQUESTED: Susan S. Corpuz authorization will not be
considered overtime and
RECOMMENDED BY: Silver Ian A. Umali RECOMMENDED BY: Silver Ian A. Umali therefore will not be
remunerated.
APPROVED BY: Bobby B. Supnet APPROVED BY: Bobby B. Supnet
FFC-FM-HRD-37_rev.0_iss.2
LIST OF MANPOWER RMC & QC
NORZAGARAY BARAS
RMC RMC
14 **Bonifacio Vendivil
15 James Carlo Santos
16 Domingo Monton
17 Jayrald Sollo
18 Joben Baguio
19 Martin Dequinto
20 Jaypee Reyes
21 Justin Anzano
22 Marjo Bergado
23 Jayvee Bryan Capuno
41 13
QC QC
1 Odonnell Rodriguez Daniel Agatep 1
8 Nilo Paglinawan
9 Sydney Suares
10 Rey Balagbis
11 Melvin Enciso
12 Arman Juanani
13 Graciano Caling
14 Romeo Abalaos
15 Hernandez Maniego
15 7
BARAS NORZGARAY