Professional Documents
Culture Documents
132kV Corridor and Ducts Layout
132kV Corridor and Ducts Layout
132kV Corridor and Ducts Layout
031910
N
IC2-400 kV SUBSTATION
3
031903-
2
031902
6
031906
1
031901
ISO A1 841 x 594 mm 1
THIS DRAWING IS THE COPYRIGHT OF AECOM AND SHALL NOT BE USED, MODIFIED, REPRODUCED, OR RELIED UPON BY THIRD PARTIES, EXCEPT AS AGREED BY AECOM OR AS REQUIRED BY LAW. AECOM ACCEPTS NO RESPONSIBILITY, AND DENIES ANY LIABILITY WHATSOEVER, TO ANY PARTY THAT USES OR RELIES ON THIS DRAWING WITHOUT AECOM'S EXPRESS WRITTEN CONSENT. DO NOT SCALE FROM THIS DRAWING.
4
031901
031904-
(BY OTHERS) 7
031907
5
031905 7
031907
WARSANLAKE PSS 6
031906
7
031907
(BY OTHERS)
N 8
031908
7
031907
7
031907
7
031907
PROPOSED 132/11kV
PRIMARY
7
031907
7
031907
8 7
031908 031907
SUBSTATION 7
031907
(PSS-01)
11
031910
9
031909
"W
031907
RS
IC2 NLAK 10
-01 E
.17 "
031910
P
SU SS-0
BS 1
TA GA
UT TIO
m
N FA S
AT NK &
RM
-2
30.0
ION
NOTES:
A
RS
MP N T
IDO
PU ATIO
ST
Last Plotted: 13-10-2020 18:14:29
RR
UT-1 1. ALL DIMENSIONS ARE IN METERS, UNLESS NOTED
IG
CO
IRR
KV
SE OTHERWISE.
132
PU WER
M
3
ST PING
AT
ION 031903- 2. DO NOT SCALE FROM THIS DRAWING. CHECK ALL
2
SW
-
ST PUMP
CF-3 DIMENSIONS ON SITE AND NOTIFY THE ENGINEER OF ANY
AT
ION
031902
6 DISCREPANCIES BEFORE PROCEEDING WITH THE WORK.
031906
132 1 3. ALL CO ORDINATES ARE IN WGS-84 / DUBAI LOCAL TM.
/11
KV
CO
RR 031901 RS5 4. ALL EXISTING UTILITIES TO BE DEMOLISHED / REMOVED
IDO
RS
20.0 4
m
031904
PRIOR TO START THE CONSTRUCTION ACTIVITIES.
1
5. FOR CROSS SECTION MARKER LOCATION, REFER TO
031901
UT 60697390-ACM-0000-XX-DR-UR-030900.
-3
RS PUD 02 TH 3-2 6. PROTECTION BARRIER SHALL BE PROVIDED TO ALL
-6 TH 3-3 BETWEEN 11kV AND LANDSCAPE CORRIDOR.
CF- 4
RS
-4
TH 3-1
RS-3
7
031907
TH 3-4
5
7
031905
031907
UT-4
TH 2-4
RS-2
LEGEND:
CF-5
MU2
SITE BOUNDARY
UT-6 METRO LINE
DRAWN BY: Author
TH 13-2
TH 2-3
TH 13-1 TH 4-1 PROPOSED 5.0m WIDE 132kV DEWA CORRIDOR
PUD 01
6 EXISTING 5.0m WIDE 132kV DEWA CORRIDOR
031906
7
RS-1 031907 PROPOSED 132kV CROSSING DUCT 2x11W
TH 12-3
TH 2-1
TH 14-2
TH 12-2 TH 4-3
PROJECT NAME:
8
7
031908
031907
CF-2
INTERNATIONAL CITY
7
031907
TH 12-1
TH 15-1 TH 4-4
TH 1-1
PROJECT DESCRIPTION:
CF-1 LEAD CONSULTANCY SERVICES ( DETAILED
MASTER PLANNING, INFRASTRUCTURE &
TH 15-2
LANDSCAPE ) FOR INTERNATIONAL CITY
TH 11-1 TH 11-2
PHASE 2 - HESSA GARDENS
TH 5-1 7
CLIENT:
031907
7
031907
8 7
031908 031907 TH 5-2
TH 15-3
TH 10 CONSULTANT
TH 16-2 Imagine it.
Delivered.
TH 5-3
AECOM MIDDLE EAST LIMITED
TH 9 UboraTower, Level 43, Bussiness Bay - Dubai, United Arab Emirates
P.O. Box 51028-Phone +971 4 439 1000-Facsimile +971 4 439 1001
7
031907 TH 5-4
TH 16-1
11
CF- 6 031910
TH 8
9
031909 UT-5
Last Plotted: 2022-12-28
PROPOSED 132/11kV
7 TH 6 PRIMARY
031907 SUBSTATION
(PSS-02)
TH 7