Professional Documents
Culture Documents
Calculations of Cost and Production Analysis of Brass
Calculations of Cost and Production Analysis of Brass
Feed=f=0.65mm
Rai=2.4
Cutting speed=Cs=v=27m/min
Original dia=Do=50mm
( 0.65 )2
=
(32)(0.4)
Ri=0.0333 μm
= (2.4)(0.0333)
Ra=0.08 μm
D f −D o 50−46
Depth of cut =d= = =2
2 2
Material removal rate =RMR=vfd=(27000)(0.65)(2)=35100mm 3/min
27
Power =pc=Fcv=(1349)( =0.81H.p
(60)(746)
Original dia=Do=50mm
(( ) ) (( ) )
n 0.08
Vmax= 1 = 1 =21.49m/min
−1 ( Tt ) −1 ( 1.5 )
n 0.08
vmin
(( )( )) (( )( ))
n 0.08
n Co 0.08 0.2
vmin = C = 27 =17.37m/min
1−n CoTt +Ct 1−0.08 (0.2)(1.5)+ 4
( ) ( )
1 1
c n 27 0.08
Tmax= = =17.34 min/cutting edge
Vmax 21.49
( )
1
27 0.08
Tmin= ¿ ¿ = =248min/cutting edge
17.37