E0001-S02-GQC-IR-00626-00-code 3
E0001-S02-GQC-IR-00626-00-code 3
''.!
1-, ~ Discipline/ Subsystem:
181 Civil
O MEP
0 Power Supply and
Distribution System
D Signalling
0 Earthing and Bonding
O ICSS
D
D
.... OAPS D Telecommunication 0 Other (Specify) D
··1 Package 2A Line Section 2A GMA • Al Gharbla Mainline• Ghweilat to Ruwals Jen
~
i Site Name Shelter - GMA09 Chainage RUWAIS(CH:89+800,2 Way Duct)
I< C
0
Inspection Point O Ho ld Point 181 Witness Point ITP Item Number I 4. 1
'fl Item to be Inspected: Laying and Inspection of reinforcement for package 2A MV Cable Internal ring(2 Way Duct),
.~
C
Detailed description as per ITP Quantity=34 meter
11 --
., Inspection Requested By
Name Date /Time Desig nation S ignatu re
'
' '
Engg.Baljindar Singh 18-10-2021
Project
~,_,p-~J::. (IR Raised By STS/
' Engineer Subcontractor)
,,:a
Cl)
' >,
Survey Department
(If Applicable)
I
( __)
, ca
> Rall Systems Interface
e (if required)
This Is to certify that the above referenced work/activity has been Inspected and/or witnessed by the Engineer.
Ins pection Conducted By The En11 lneer's Representative
'
~
Name:
... - □ A pproved
'~ Designation:
'g>
w Date /Time:
□ Approved With Comments
~~~
QI
~ j ected
(=. Signature:
>,
.a D
ro
e
Comments: J .,~)ao1 \t~ ~-prl'()\[4J dv4 Declined
Reason to Decline:
a.
a.
<(
N.(~ (<_Q V, MJ c.\~<»~ J-Oi '-'(d /><felf<I /Jr) D The minimum quota of inspection/witness points required to be
allend by the Engineer has been exceeded, the ITR will be declined by
0:: the Engineer
!::
□ Others (specify): Comment reviewed & cloaed
(alanatura and datAI