File No.

DIVMDK-COM/GEN/0004/2023-AE-C-DO-MDK

SOUTHERN POWER DISTRIBUTION COMPANY OF A.P. LIMITED.

From To
The Executive Engineer, The Superintending Engineer,
Operation Division, Operation, A.P. S.P.D.C. Ltd.,
Mydukur. Kadapa.

Lr. No. EE/O/MDK/Comml./F.no:/D. No:149/23, Dt.23.01.2023.


Sir,
Sub:-Operation Division, Mydukur – 3 Nos of estimates for extension of
LT line in various locations in Badvel town and Porumamilla prepared
against the complaints received in GGMP programme in operation
division Mydukur –Turnkey Approval - Request-Reg.

Ref:- 1.Proc.No.1012/GGMP/ASO/CPO/2022,Dt:06.12.2022
2. Proc.No.1012/GGMP/ASO/CPO/2022,Dt:10.01.2023

& & &

I herewith submitting that 3 Nos of estimates for extension of LT line in


various locations in Badvel town and Porumamilla prepared and sanctioned against the complaints
received in GGMP programme in Operation Division Mydukur are herewith submitted and requested
turnkey Approval to execute the works please.

SL.No Name of the WBS Number Estimate Cost Rs.


section
1 Badvel town E-0013-06-06-21-01-004 758,960/-
2 Badvel town E-0013-06-06-21-01-005 96,520/-
3 Prumamilla E-0013-06-06-31-01-003 271,245/-

EXECUTIVE ENGINEER,
OPERATION:: MYDUKUR

Copy the Deputy Executive Engineer Operation/Badvel and Porumamilla.